UTC #180 Logistics and General Information

UTC #180 Logistics
and General Information
July 23 – 25, 2024

Hybrid meeting, hosted by
Microsoft Corp. Redmond, WA
and virtually via Microsoft Teams

1. Meeting Schedule, Pacific Daylight Time (UTC-7:00):

Tuesday, July 23 10:30 am – 5:30 pm
Wednesday, July 24 9:30 am – 5:30 pm
Thursday, July 25 9:30 am – 5:30 pm

2. Meeting logistics:

To provide the best hybrid meeting experience, all participants should join the virtual meeting in Microsoft Teams, including those attending in person. Please have Teams installed before the meeting; you can download it for free here.

2.1 On-site attendance

The meeting will be held in the Pilchuck room of Building 40, on the Microsoft campus in Redmond, WA. Building 40 is part of a two-building complex (buildings 40 and 41) located on the west side of 156th Avenue NE, between NE Turing Street and NE 31st Street.

Parking: There is a parking garage adjacent to Building 40. To access the garage, enter the 40/41 complex from NE 31st Street, or from the south-bound lane of 156th Avenue NE. The south end of the garage will be closer to Building 40. Inside the garage, visitor spots will be located near the entrances to the garage. Vehicles need to be registered at the lobby — the receptionist will ask for plate number, make, model, color, and year of the vehicle.

Teams meeting: When joining the Teams meeting (see below), select “Don’t use audio”.

Hotels: see below for some hotel options.

2.2 Online attendance

Use the Teams link details below for all meeting days.

People planning to join the meeting should notify the chair in advance (see contact information below) and should set their Teams profile to show their full name. You will not be admitted if the name appearing in the Teams lobby isn’t recognized.

Join Teams Meeting

Or join by entering a meeting ID in Teams:
Meeting ID: 237 887 372 716
Passcode: SDLaWz

Or call in (audio only):
+1 323-849-4874 (Los Angeles)
Passcode: 667 601 708#
Find your local number

3. Meeting timeline (approximate):

Tuesday, July 23, 2024

Admin:
A.1 Quorum
A.2 Agenda
A.4 Review of UTC action items
10:30 am
Liaisons:
B.13 Unicode Administration, Infrastructure Group
morning
H.1 Release Management Group report morning
Liaisons:
B.1 ISO/IEC JTC 1/SC 2
morning
C. Editorial Working Group topics morning
Lunch 12:30 pm to 1:30 pm
D. Scripts afternoon
Break around 2:45 pm
E. CJK & Unihan 3:00 pm
Liaisons:
B.2 IRG
afternoon

Wednesday, July 24, 2024

Admin:
A.1 Quorum
A.3 Review of UTC #179 minutes
A.5 Calendar review
9:30 am
G. Emoji 9:50 am
Liaisons:
B.3.1 ICU-TC
B.3.2 ICU4X-TC
B.4 CLDR
B.6 IETF/ICANN
B.10 ISO/IEC JTC 1/SC 22
B.12 ECMA TC 39
morning
Break around 11:00 am
F. Properties and Algorithms
F.1 PAG report and recommendations
F.2 Proposed updates to UAXes
F.3 Proposed updates to UTSes
morning
Lunch 12:30 pm to 1:30 pm
F. Properties and Algorithms (cont’d) afternoon
Break around 3:15 pm
F. Properties and Algorithms (cont’d) afternoon
F.1.1 Auto Spacing in CJK text 4:00 pm

Thursday, July 25, 2024

Admin:
A.1 Quorum
9:30 am
Liaisons:
B.5 ISO TC 37/SC 2
B.7 SEI
B.8 INFITT
B.9 LSA
B.11 ISO TC 46
morning
D. Scripts (cont’d) morning
Break around 11:00 am
D. Scripts (cont’d) morning
Lunch 12:30 pm to 1:30 pm
D. Scripts (cont’d) afternoon
I.1 Other feedback afternoon
H.2 Unicode 16.0 beta & release afternoon
Admin:
A.6 Closing dates for PRIs
A.7 L2 representatives
afternoon
Break around 3:00 pm
INCITS/L2 meeting 3:15 pm to 4:30 pm

For agenda details, see UTC #180 Agenda.

4. Hotels and local public transit

The meeting venue is located very close to Extended Stay America and the Element or Aloft hotels — about 5-minutes walk.

Here are some nearby hotel options, all within a 10-minute drive:

There are King County Metro bus stops very close to Building 40 on routes 221, 245, 249 and 269. These are east-side routes but each has stops with connections to other parts of the region, including downtown Seattle, University of Washington and SeaTac airport.

Sound Transit also has bus routes to/from downtown Seattle (542, 545, 550, 554) and to/from SeaTac airport (560) with stops not far from Building 40 or with connections to the King County Metro bus routes mentioned above.

Sound Transit has opened a light rail line between Bellevue and Redmond Technology Center (Microsoft campuses). (Note: the light rail line does not yet connect to downtown Redmond, Seattle or SeaTac airport.) The Overlake Village station is a four-minute walk from Building 40.

5. Contact information: