Why a CMMI Level 5 Company Fails to Meet the Deadlines? | SpringerLink
Skip to main content

Why a CMMI Level 5 Company Fails to Meet the Deadlines?

  • Conference paper
Product-Focused Software Process Improvement (PROFES 2009)

Part of the book series: Lecture Notes in Business Information Processing ((LNBIP,volume 32))

Abstract

Reliable effort and cost estimation remains to be a challenging issue even for mature software organizations. Although, these organizations collect historical data to base their future estimates, changes in circumstances (such as application type, development platform, etc.) prevent their successful utilization. As a result, companies often suffer from underestimated and unrealistic schedules. Managing software projects that involve a large number of globally distributed stakeholders makes estimation and planning even more challenging. Related studies show that even knowledgeable project managers often underestimate hidden costs and sources of delay associated with distributed development. Therefore, management activities such as estimation of development effort, planning and control require special attention. In this paper we discuss experiences gained from a highly distributed software project, which aimed at development of a product based on a new platform and architectural solution. The project was conducted in a CMMI Level 5 company and still failed to meet initial plan constraints. We thus provide an overview of management decisions in the light of their consequences, and discuss potential areas of improvement.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
¥17,985 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
JPY 3498
Price includes VAT (Japan)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
JPY 5719
Price includes VAT (Japan)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
JPY 7149
Price includes VAT (Japan)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 3rd edn. Project Management Institute (2004)

    Google Scholar 

  2. A Guide to the Software Engineering Body of Knowledge (SWEBOK). IEEE Computer Society (2004)

    Google Scholar 

  3. Jones, T.C.: Estimating Software Costs. McGraw-Hill, New York (1998)

    Google Scholar 

  4. Boehm, B.W.: Software Engineering Economics. Prentice-Hall, Englewood Cliffs (1981)

    MATH  Google Scholar 

  5. Thayer, H.R.: Software Engineering Project Management, 2nd edn. IEEE CS Press, Los Alamitos (2001)

    MATH  Google Scholar 

  6. Smite, D.: Project Outcome Predictions: Risk Barometer Based on Historical Data. In: Proc. of the ICGSE conference, Germany, August 2007, pp. 103–112. IEEE Computer Society, Los Alamitos (2007)

    Google Scholar 

  7. Karolak, D.W.: Global Software Development: Managing Virtual Teams and Environments. IEEE Computer Society, Los Alamitos (1998)

    Google Scholar 

  8. Prikladnicki, R., Audy, J.L.N., Evaristo, R.: A Reference Model for Global Software Development: Findings from a Case Study. In: Proc. of IEEE Int. Conf. on Global Software Engineering (ICGSE 2006), Florianópolis, Brazil, pp. 18–25. IEEE Computer Society Press, Los Alamitos (2006)

    Chapter  Google Scholar 

  9. Yin, R.K.: Case Study Research: design and methods, 2nd edn., vol. 5. Sage Publications, Newbury Park (1994)

    Google Scholar 

  10. Ramesh, B., Cao, L., Mohan, K., Xu, P.: Can Distributed Software Development Be Agile? Communications of ACM 49(10), 41–46 (2006)

    Article  Google Scholar 

  11. Chow, T., Cao, D.-B.: A Survey Study of Critical Success Factors in Agile Software Projects. The Journal of Systems and Software 81, 961–971 (2008)

    Article  Google Scholar 

  12. Holmström, H., Fitzgerald, B., Ågerfalk, P.J., Conchúir, E.Ó.: Agile Practices Reduce Distance in Global Software Development. Information System Management 23(3), 7–18 (2006)

    Article  Google Scholar 

  13. Battin, R.D., Crocker, R., Kreidler, J., Subramanian, K.: Leveraging resources in global software development. IEEE Software 18(2), 70–77 (2001)

    Article  Google Scholar 

  14. ISBSG Dataset 10 (2007), http://www.isbsg.org

  15. Taxén, L.: An integration centric approach for the coordination of distributed software development projects. Information and Software Technology 48, 767–780 (2006)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2009 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Smite, D., Gencel, C. (2009). Why a CMMI Level 5 Company Fails to Meet the Deadlines?. In: Bomarius, F., Oivo, M., Jaring, P., Abrahamsson, P. (eds) Product-Focused Software Process Improvement. PROFES 2009. Lecture Notes in Business Information Processing, vol 32. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-02152-7_8

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-02152-7_8

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-02151-0

  • Online ISBN: 978-3-642-02152-7

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics