Abstract
Work study is an extensively used technique for examining the methods to carry out activities in a company and proposing actions for productivity improvement. This paper presents a work-study application to a fruit nectar process inside a food company using 5W1H and ECRS techniques. A critical analysis was conducted in three previously selected activities, according to its improvement potential. Results allowed optimizing distances along the process and improving ergonomic conditions for workers. Savings included a total distance of 10.2 m, two transportation activities and two delays activities per production cycle. Also, the standard time was determined in one of the prioritized activities. Our results demonstrated that work study techniques are tools suitable to be implemented in most economic sectors for productivity improvements. However, the technique itself will not be effective without a commitment from top-level management for implementing the corrective actions proposed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
Notes
- 1.
The allowances established are 13% (Personal: 6%, fatigue: 4%, and break: 3%).
References
Duran, C., Cetindere, A., Aksu, Y.E.: Productivity improvement by work and time study technique for earth energy-glass manufacturing company. Proc. Econ. Financ. 26, 109–113 (2015). https://doi.org/10.1016/S2212-5671(15)00887-4
Chisosa, D.F., Chipambwa, W.: An exploration of how work study techniques can optimize production in Zimbabwe’s clothing industry. J. Text. Apparel Technol. Manag. 10, 1–11 (2018)
Malashree, P., Kulkarni, V.N., Gaitonde, V.N., Sahebagowda, M.: An experimental study on productivity improvement using workstudy and ergonomics (2018)
Prokopenko, J.: Productivity Management: A Practical Handbook. International Labour Organization, Geneva (1987)
Roncancio Avila, M., Reina Moreno, D., Hualpa Zuñiga, A., Felizzola Jimenez, H., Arango Londoño, C.: Using learning curves and confidence intervals in a time study for the calculation of standard times. Inge Cuc. 13, 18–27 (2017). https://doi.org/10.17981/ingecuc.13.2.2017.02
Coronado-Hernandez, J.R., Ospina Mateus, H.: Incorporating ergonomic risks into U-shaped assembly line balancing problem. WPOM - Work. Pap. Oper. Manag. 4, 29–43 (2013). https://doi.org/10.4995/wpom.v4i2.1164
Chueprasert, M., Ongkunaruk, P.: Productivity improvement based line balancing: a case study of pasteurized milk manufacturer. Int. Food Res. J. 22, 2313–2317 (2015). https://www.scopus.com/record/display.uri?eid=2-s2.0-84945325467&origin=inward&txGid=f3b271df3fda1d19864a135d28f7db5a
Ongkunaruk, P., Wongsatit, W.: An ECRS-based line balancing concept: a case study of a frozen chicken producer. Bus. Process Manag. J. 20, 678–692 (2014). https://doi.org/10.1108/BPMJ-05-2013-0063
Jia, S.: The research and application of program analysis in a production assembly line. In: 2017 4th International Conference on Industrial Engineering and Applications, ICIEA 2017, pp. 368–371 (2017). https://doi.org/10.1109/IEA.2017.7939240
Feng, J.Y.: The application and study of work study in electronic production packaging line balancing. Adv. Mater. Res. 933, 538–542 (2014). https://doi.org/10.4028/www.scientific.net/AMR.933.538
Li, W.L., Song, C.L., Han, L.S.: Application of the work study to balancing hydraulic component assembly lines. Adv. Mater. Res. 452–453, 206–210 (2012). https://doi.org/10.4028/www.scientific.net/AMR.452-453.206
Mishra, R.: Productivity improvement in automobile industry by using method study. Int. J. Sci. Eng. Appl. Sci. 1, 361–363 (2015). ISSN 2278-1684
Mwanza, B.G., Mbohwa, C.: Application of work study for productivity improvement : a case study of a brewing company, pp. 296–305. IEEE (2016)
Singh, M.P., Yadav, H.: Improvement in process industries by using work study methods : a case study. Int. J. Mech. Eng. Technol. 7, 426–436 (2016). https://www.scopus.com/inward/record.uri?eid=2-s2.0-85018504950&partnerID=40&md5=a5ebf0b930b759c8537d148eef65c59f
Akansel, M., Yagmahan, B., Emel, E.: Determination of standard times for process improvement: a case study. Glob. J. Bus. Econ. Manag. Curr. Issues 7, 62 (2017). https://doi.org/10.18844/gjbem.v7i1.1876
International Labour Office: Introduction to work study (1992)
Macías-Jiménez, M.A., Romero-Conrado, A.R. Acosta-Fontalvo, L.C. Coronado-Hernández, J.R.: Additional file: of application of work study to process improvement: fruit nectar case. Figshare. Dataset (2019). http://figshare.com/articles/Additional_file_of_Application_of_Work_Study_to_process_improvement_Fruit_nectar_case_/8247425, https://doi.org/10.6084/m9.figshare.8247425.v2
Minitab Inc.: Minitab 18.1 (2017)
Hartanti, L.: Work measurement approach to determine standard time in assembly line. In: Proceedings of 31st IASTEM International Conference, pp. 49–52 (2016)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this paper
Cite this paper
Macías-Jiménez, M.A., Romero-Conrado, A.R., Acosta-Fontalvo, L.C., Coronado-Hernández, J.R. (2019). Application of Work Study to Process Improvement: Fruit Nectar Case. In: Saeed, K., Chaki, R., Janev, V. (eds) Computer Information Systems and Industrial Management. CISIM 2019. Lecture Notes in Computer Science(), vol 11703. Springer, Cham. https://doi.org/10.1007/978-3-030-28957-7_21
Download citation
DOI: https://doi.org/10.1007/978-3-030-28957-7_21
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-28956-0
Online ISBN: 978-3-030-28957-7
eBook Packages: Computer ScienceComputer Science (R0)