Abstract
Automated Guided Vehicles (AGV) are commonly used to transfer parts in flexible manufacturing systems (FMS). AGV dispatching deals with assigning vehicles to move parts based on the relationship between AGV and parts availability. The dispatching method influences the performance of the FMS and can lead to cost saving and improvement. The production environment is complex and the dispatching decision is sometimes vague and obscure. To deal with such complicated environments a fuzzy logic dispatching model has been developed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
Berman, S., Edan, Y., (2002), “Decentralized autonomous AGV system for material handling”, International Journal of Production Research, Vol. 40, No. 15, pp. 3995–4006.
Bozer, Y., A., and Yen, C., K., (1996), “Intelligent dispatching rules for trip-based material handling systems”, Journal of Manufacturing Systems, Vol. 15, No. 4, pp. 226–36.
Custodio, L., M., M., and Sentieiro, J., J., S., and Bispo, C., F., G., (1994), “Production planning and scheduling using a fuzzy decision system”, IEEE Transactions on Robotics and Automation, Vol. 10, No. 2, pp. 160–167.
Egbelu, P., J., (1987), “The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system”, Material Flow, vol. 4, pp. 17–32.
Egbelu, P., J., and Tanchoco, J., A., (1984), “Characterization of automatic guided vehicles dispatching rules”, International Journal of Production Research, Vol. 22, No. 3.
Garbot, B., and Geneste, L., (1994), “Dispatching rules in scheduling: a fuzzy approach”, International Journal of Production Research, Vol. 32, No. 4, pp. 903–915.
Goetz, Jr. W., G., and Egbelu, P., J., (1990), “Guide path design and location of load pick-up/drop-off points for an automated guided vehicle system”, International Journal of Production Research, Vol. 28, No. 5, pp. 927–941.
Hoff, E., B., and Sarker, B., R., (1998), “An overview of path design and dispatching methods for automated guided vehicles”, Integrated Manufacturing Systems, Vol. 9, No. 5, pp. 296–307.
Hwang H., and Kim, S. H., (1998), “Development of dispatching rules for automated guided vehicle systems”, Journal of Manufacturing Systems, Vol. 17, No. 2, pp. 137–143.
Kim, C., W., Tanchoco, J., M., A., and Koo, R., H., (1999), “AGV dispatching base on workload balancing”, International Journal of Production Research, Vol. 37, No. 17, pp. 4053–4066.
King, R., E., and Wilson, C., (1991), “A review of automated guided vehicles systems design and scheduling”, Production Planning and Control, Vol. 2, No. 1, pp. 44–51.
Koff, G., A., (1987), “Automated guided vehicle systems: applications, controls and planning”, Material Flow, vol. 4, pp. 3–16.
Lee, J., (1996), “Composite dispatching rules for multiple-vehicle AGV systems”, Simulation, Vol. 66, No. 2, pp. 121–130.
Leung L., C., and Khator, S., K., and Kimbler, D., L., (1987), “Assignment of AGVS with different vehicle types”, Material Flow, vol. 4, pp. 65–72.
Liu, C., M., and Duh, S., H., (1992), “Study of AGVS design and dispatching rules by analytical and simulation methods”, International Journal of Computer Integrated Manufacturing, Vol. 5, No. 4 and 5, pp. 290–9.
Naumann, A., and Gu, P., (1997), “Real-time part dispatching within manufacturing cells using fuzzy logic”, Production planning & control, Vol. 8, No. 7, pp. 662–669.
Sabuncuoglu, I., and Hommertzheim, D., L., (1992), “Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system”, International Journal of Production Research, Vol. 30, No. 5, pp. 1059–79.
Sinriech, D., and Kotlarski J., (2002), “A dynamic scheduling algorithm for a multiple-load multiple-carrier system”, International Journal of Production Research, Vol. 40, No. 5, pp. 1065–1080.
Shneor, R., Avraham, R., Amar, S., Shitrit, Y., (2002), “Implementing project management according to TOC in aerial maintenance unit”, 12th IE&M National Conference, Tel-Aviv, Israel.
Shneor, R., (2004), “Fuzzy dispatching of AGV”, M.Sc thesis, Ben-gurion university, Beer-sheva, Israel.
Tan, K., K., and Tan, K., C., and Tang, K., Z., (2002), “Evolutionary tuning of a fuzzy dispatching system for automated guided vehicles”, Systems, Man and Cybernetics, Part B, IEEE Transactions on, Vol. 30, No. 4, pp. 632–636.
Tompkins, White, Bozer, Frazelle, Tanchoco, Trevino, (1984), Facilities Planning, 2nd ed., John Wiley & Sons, New York.
Yim, D., and Linn, R., J., (1993), “Push and pull rules for dispatching automated guided vehicles in a flexible manufacturing system”, International Journal of Production Research, Vol. 31, No. 1, pp. 43–57.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2006 Springer
About this paper
Cite this paper
Shneor, R., Berman, S., Edan, Y. (2006). Fuzzy Dispatching of Automated Guided Vehicles. In: Abraham, A., de Baets, B., Köppen, M., Nickolay, B. (eds) Applied Soft Computing Technologies: The Challenge of Complexity. Advances in Soft Computing, vol 34. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-31662-0_57
Download citation
DOI: https://doi.org/10.1007/3-540-31662-0_57
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-31649-7
Online ISBN: 978-3-540-31662-6
eBook Packages: EngineeringEngineering (R0)