You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Actually, the timeline only show two levels of informations : one upper-level, labelized layer (eg Months),
and one lower-level (the small graduations, eg. for days). But this is not enough, because with this system we don't know the year!
The timeline really need three levels of precision (eg. Year label, Month label, and simple graduation for days or weeks), to be really useful.
Also, when dealing with small yearly intervals, and big screen resolution, the timeline should not show the months as numerical values.
Actually, the timeline only show two levels of informations : one upper-level, labelized layer (eg Months),
and one lower-level (the small graduations, eg. for days). But this is not enough, because with this system we don't know the year!
The timeline really need three levels of precision (eg. Year label, Month label, and simple graduation for days or weeks), to be really useful.
Also, when dealing with small yearly intervals, and big screen resolution, the timeline should not show the months as numerical values.
Imported from Launchpad using lp2gh.
The text was updated successfully, but these errors were encountered: