Abstract
The occurrence of a Loss Of Offsite Power (LOOP) event can be a major threat to nuclear safety due to the dependence of auxiliary systems on electrical energy. Probabilistic safety assessments of nuclear power plants require, thus, estimates of the frequencies and durations of such LOOP events. These estimates are usually based on past statistical data, which is not always relevant. Model-based approaches are thus needed. This paper proposes an analytical method to estimate the frequency and duration of switchyard-centered LOOP events, which constitute one of the four main categories of LOOP events. The proposed method is mainly based on the identification of active minimal cut sets, considering the behavior of circuit breakers against faults according to their coordination and selectivity. Adapted versions of the Risk Reduction Worth and Fussel–Vesely importance factors are proposed to evaluate the impact of components on the switchyard-centered LOOP event frequency. Furthermore, uncertainty analysis is developed and performed. Various generic plant connection schemes are used for application. Results demonstrate the applicability of the methodology to estimate the frequency and duration of switchyard-centered LOOP events, and to identify optimal ways to reduce the risk by modifying the switchyard configuration.









Similar content being viewed by others
Notes
Reactor critical years.
References
Allan RN (1988) Effects of protection systems operation and failures in composite system reliability evaluation. Electr Power Energy Syst 10(3):180
Ang AH-S, Pires JA, Vulaverde R (1996) A model for the seismic reliability assessment of electric power transmission systems. Reliab Eng Syst Saf 51:7–22
Arians R et al. (2016) Effects of external grid disturbances to nuclear power plants. In: Proceedings of the 2016 24th international conference on nuclear engineering (ICONE24), Charlotte, pp 26–30
Arigi AM, Park G, Kim J (2020) Dependency analysis method for human failure events in multi-unit probabilistic safety assessments. Reliab Eng Syst Saf 203:107–112
Bies M (2018) Loss of offsite power frequency estimates due to external events at a Finnish nuclear power plant. Probabilistic Safety Assessment and Management PSAM 14, Los Angeles
Billinton R, Allan RN (1983) Reliability evaluation of engineering systems: concepts and techniques. Plenum press, USA
Billinton R, Allan RN (1994) Reliability evaluation of power system, 2nd edn. Plenum press, New York
Billinton R, Lian G (1995) A new technique for active minimal cut set selection used in substation reliability evaluation. Microelectron Reliab 35(5):797–805
Bourgade E, Desmas T (1994) Substation reliability evaluation: a specific tool for designers. Reliab Eng Syst Saf 46:63–73
Camensig C, Bresesti L, Clementel S, Savertti M (1997) Seismic risk evaluation for high voltage air insulated substations. Reliab Eng Syst Saf 55:179–191
Cardini F, Agliardi GL, Zio E (2017) Estimation of rare event probabilities in power transmission networks subjects to cascading failures. Reliab Eng Syst Saf 158:9–20
Cepin M (2011) Assessment of power system reliability. Springer
Cepin M (2012) Advantages and difficulties with the application of methods probabilistic safety assessment to the power systems reliability. Nucl Eng Des 246:136–140
Cepin M (2018) Application of shutdown probabilistic safety assessment. Reliab Eng Syst Saf 178:147–155
Cepin M (2020) Probability of restoring power to the transmission power system and the time to restore power. Reliab Eng Syst Saf 193:1065–1095
Chang L, Wu Z (2011) Performance and reliability of electrical power grids under cascading failures. Electr Power Energy Syst 33:1410–1419
Costa JGDC, da Silva AML, Hamoud GA, Pureza IM, Neto NS (2020) Probabilistic evaluation of distribution power transformers reliability indices considering load transfers and mobile unit substations. Electr Power Syst Res 187:106501
Ferrario E, Zio E (2014) Assessing nuclear power plant safety and recovery from earthquakes using a system of systems approach. Reliab Eng Syst Saf 125:103–116
Gjorgiev B, Volkanovski A, Kancev D, Cepin M (2014) Alternative off-site power supply improves nuclear power plant safety. Ann Nucl Energy 71:304–312
Goel L, Shrestha GB (2002) A versatile tool for electric substation reliability assessment. Comput Electr Eng 28:561–576
Grganić H, Šimić Z (2013) On the estimation and reduction of the frequency of the loss of offsite power event. J Energy 61:131–141
Haarla L, Pulkkinen U, Koskinen M, Jyrinsalo J (2008) A method for analysing the reliability of a transmission grid. Reliab Eng Syst Saf 93:277–287
Henneaux P (2015) Probability of failure of overloaded lines in cascading failures. Electr Power Energy Syst 73:141–148
Henneaux P, Labeau P-E, Maun J-C (2012) A level-1 probabilistic risk assessment to blackout hazard in transmission power systems. Reliab Eng Syst Saf 102:41–52
Henneaux P, Labeau P-E (2018) Offsite power reliability assessment for nuclear power plants: an application of dynamic reliability to power systems. In: Advanced concepts in nuclear energy risk assessment and management, pp 257–278. https://doi.org/10.1142/9789813225619-0007.
Henneaux P, Labeau P-E, Obama J (2016) Reliability of offsite power of nuclear power plants in evolving power systems, In: Proceedings of the λμ20 conference, Saint-Malo
Horowitz SH, Phadke AG (2014) Power system relaying. 4th edn. Wiley
Hortal J, Izquierdo JM (1996) Application of the integrated safety assessment methodology to the protection of electric systems. Reliab Eng Syst 52:315–326
International Atomic Energy Agency (2012) Electric grid reliability and interface with nuclear power plants, IAEA nuclear energy series. No. NG-T-3.8, IAEA, Vienna
International Atomic Energy Agency (2016) Design of electrical power systems for nuclear power plants, IAEA nuclear energy series. No. SSG-34, IAEA, Vienna
Jang S, Jae M (2020) A development of methodology for assessing the inter-unit common cause failure in multi-unit PSA model. Reliab Eng Syst Saf 203:107012
Johnson N, Ma Z, Schroeder J-A (2019) Analysis of loss of offsite power events 1987–2017. Idaho National Laboratory, INL/EXT-18-453559.
Jung WS, Yang J-E, Ha J (2003) A new method to evaluate alternate AC power source effects in multi-unit nuclear power plants. Reliab Eng Syst Saf 82:165–172
Kamyab S, Nematollahi M, Henneaux P, Labeau P-E (2021a) Development of a hybrid method to assess grid-related LOOP scenarios for an NPP. Reliab Eng Syst Saf 206:1072–1098
Kamyab S, Nematollahi M, Henneaux P, Labeau P-E (2021b) Investigating the influence of the variation of the load characteristic on the occurrence frequency of grid-related loss of offsite power using a probabilistic-deterministic methodology. Prog Nucl Energy 139:103870
Lee E-C, Na J-H (2013) Establishment of a maintenance program to prevent loss of offsite power in nuclear power Plants. Nucl Eng Technol 45:791–794
Lei H, Singh C (2015) Power system reliability evaluation considering cyber-malfunctions in substations. Electr Power Syst Res 129:160–169
Lim HK, Park J-H (2020) Effects of house load operation on PSA based on operational experiences in Korea. Nucl Eng Technol 52:2812–2820
Moazzami M, Hemmati R, Fesharaki FH, Rad SR (2013) Reliability evaluation for different power plant busbar layouts by using sequential Monte Carlo simulation. Electr Power Energy Syst 53:987–993
Mohsendokht M, Hadad K, Jabbari M (2018) Reducing the loss of offsite power contribution in the core damage frequency of VVER-1000 reactor by extending the house load operation period. Ann Nucl Energy 116:303–313
Moustafa MAMM, Chang C-K (2021) Preventing cascading failure of electric power protection systems in nuclear power plant. Nucl Eng Technol 53:121–130
Noor G, Stedall B, Atiah A (2016) Planning and design considerations associated with integration of the UAE’s first nuclear power plant. In: Proceedings of CIGRE2016, Paris
Nuclear Energy Agency (2015) Robustness of electrical systems of nuclear power plants in light of the Fukushima Daiichi accident (ROBELSYS), NEA/CSNI/R(2015)4, NEA, Paris
P. M. Subcommittee (1979) IEEE reliability test system. In: IEEE transactions on power apparatus and systems, vol. PAS-98, pp 2047–2054. https://doi.org/10.1109/TPAS.1979.319398.
Retterath B, Chowdhury AA, Venkata SS (2005) Decoupled substation reliability assessment. Electr Power Energy Syst 27:662–668
Smith C, Knudsen J, Kvarfordt K, Wood T (2008) Key attributes of the SAPHIRE risk and reliability analysis software for risk-informed probabilistic applications. Reliab Eng Syst Saf 93:1151–1164
Šnipas M, Radziukynas V, Valakevicius E (2017) Modeling reliability of power systems substations by using stochastic automata networks. Reliab Eng Syst Saf 157:13–22
Tsao T-F, Chang H-C (2003) Composite reliability evaluation model for different types of distribution systems. IEEE Trans Power Syst 18(2):924
U.S. NRC (2005) Reevaluation of station blackout risk at nuclear power plants. NUREG/CR-6890, Washington, 2005
Volkanovski A (2017) Wind generation impact on electricity generation adequacy and nuclear safety. Reliab Eng Syst Saf 158:85–92
Volkanovski A, Cepin M, Mavko B (2009) Application of the fault tree analysis for assessment of power system reliability. Reliab Eng Syst Saf 94:1116–1127
Volkanovski A, Avila AB, Veira MP (2016a) Statistical analysis of loss of offsite power events. Sci Technol Nucl Install. https://doi.org/10.1155/2016/7692659
Volkanovski A, Avila AB, Veira MP, Kancev D, Maqua M, Stephan JL (2016b) Analysis of loss of offsite power events reported in nuclear power plants. Nucl Eng Des 307:234–248
Funding
The authors have not disclosed any funding.
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of interest
The authors declare that they have no conflict of interests.
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.
About this article
Cite this article
Benabid, R., Henneaux, P. & Labeau, PE. Probabilistic assessment of switchyard-centered LOOP event frequency and duration in an NPP. Int J Syst Assur Eng Manag 15, 4105–4123 (2024). https://doi.org/10.1007/s13198-024-02416-6
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s13198-024-02416-6