Abstract
A job scheduling mathematical model was applied to a yam flour producing company in Benin City area of Nigeria with a view to develop a framework for the proper scheduling of jobs (orders) in the paint manufacturing company. The problem is addressed by considering customers (n) to be served (where n is large); in what way should customers’ order be processed such that the company’s profit is maximized while the customers are not delayed? The paper addressed the problem by using makespan as a measure of performance while the job orders were sequentially scheduled according to order of priority to achieve optimum results. The mean makespan for the developed CDS heuristic is 35.99, for the developed “A1” is 36.08 while the mean makespan for the usual traditional serial order (USO) method is 40.91. The average gain with the application of CDS heuristic is 4.962 and for “A1” is 4.912. The results show that CDS and “A1” heuristics are preferred to the usual method of USO. The CDS heuristic was fond to give the best makespan results, followed by “A1” heuristic.
Similar content being viewed by others
References
Adedoye OT, Ojoawo A, Adesiyun OO, Mark F, Anigilaje EA (2008) Poisoning due to yam flour consumption in five families in Ilorin Central Nigeria. West Afr J Med 27(1):41–43
Akissoe NH, Hounhouigan JD, Brica N, Vernier P, Nago MC, Olorunda OA (2003) Physical, chemical and sensory evaluation of dried yam (Dioscorea rotundata) tubers, flour and amala—a flour-derived product. J Trop Sci 41:151–156
Campbell HG, Dudek RA, Smith ML (1970) A heuristic algorithm for n-job, m-machine sequencing problem. J Manag Sci. 16:630–637
Chen ZL (1999) Simultaneous job scheduling and resource allocation on parallel machines. Department of Systems Engineering, University of Pennsylvania, Philadelphia, p 19104
Chen JC, Cheng-Chun W, Chia-Wen C, Kou-Huang C (2012) Flexible job shop scheduling with parallel machines using genetic algorithm and grouping genetic algorithm. J Expert Syst Appl 39(11):10016–10021
Choi I, Choi D (2002) A local search algorithm for jobshop scheduling problems with alternative operations and sequence-dependent setups. J Comput Ind Eng 42(1):43–58
Collins JL, Falasinnu GA (2006) Yam (Dioscorea spp.) flour fortification with soy flour. J Food Sci 42(3):821–827
Du J (1993) Minimizing mean flow time in two-machine open shops and flow shops. J Algorithms 14:24–44
Hounhouigan JD, Kayode AP, Bricas N, Nago CM (2003) Desirable culinary and sensory characteristics of yams in urban Benin. Benin J Agric Sci 21(12):2815–2820
Kanate P, Mungwattana A (2010) Algorithm for solving job shop scheduling problem based on machine availability constraint. Int J Comput Sci Eng 2(5):1919–1925
Karger D, Stein C, Wein J (1999) Chapter scheduling algorithms. Algorithms and theory of computation handbook. CRC Press, Boca Raton
Kesen SE, Güngor Z (2012) Job scheduling in virtual manufacturing cells with lot-streaming strategy: a new mathematical model formulation and a genetic algorithm approach. J Operational Res Soc 63:683–695
Liaw CF (2008) An efficient simple metaheuristic for minimizing the makespan in two-machine no-wait job shops. J Comput Operations Res 35(10):3276–3283
Liu N, Abdelrahman M, Ramaswamy S (2005) A genetic algorithm for single machine total weighted tardiness scheduling problem. Int J Intell Control Syst 10(3):218–225
Mestres C, Dorthe S, Akissoe N, Hounhouigan JD (2004) Prediction of sensorial properties (colour and taste) of amala, a paste from yam chips flour of West Africa, through biochemical properties. J Plant Foods Hum Nutr 9(3):93–99
Mignouna HD, Abang MM, Asiedu R (2003) Harnessing modern biotechnology for tropical tuber crop improvement: yam (Dioscorea spp.) molecular breeding. Afr J Biotechnol 2(12):478–485
Odior AO, Orsarh ES (2008) Design and construction of a yam pounding machine. Int J Nat Appl Sci 4(3):319–323
Ojokoh AO, Gabriel RAO (2010) A comparative study on the storage of yam chips (gbodo) and yam flour (elubo). Afr J Biotechnol 9(21):3175–3177
Oladimeji FO, Oke SA, Oluwatoyin PP (2008) A multi-criteria model for maintenance job scheduling. Maejo Int J Sci Technol 2(1):1–12
Oluleye AE, Oyetunji E, Ogunwolu L, Oke SA (2007) Job scheduling in a small scale gari processing firm in Nigeria. Pac J Sci Technol 8(1):137–143
Rajakumar S, Arunachalam VP, Selladura V (2004) Workflow balancing strategies in parallel machine scheduling. Int J Adv Manuf Technol 23:366–374
Jarvis WJ (1980) Maintenance planning and scheduling in petrochemical manufacturing environment. National Petroleum Refineries Association, Washington DC 80(2):1–12
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Odior, A.O. Job scheduling in a yam flour producing company in Benin City. Int J Syst Assur Eng Manag 4, 397–403 (2013). https://doi.org/10.1007/s13198-012-0130-9
Received:
Revised:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s13198-012-0130-9