We describe an approach for scheduling triple cross-over stacking cranes in an automated container storage block with asynchronous hand over at the transfer areas at both block front ends. The problem is characterised by frequent long crane moves that make job assignment and crane routing particularly challenging, as an intricate synchronisation between the cranes is required. The main objective is to maximise the productivity of the crane system under peak load while preventing delays in the transport of import and export containers from and to the transfer areas. Our method solves an online optimisation problem by constructing a new crane schedule for a certain planning horizon whenever a new job arrives or a job is completed. We report on extensive simulation studies for evaluating the scheduling strategy. The results show that the method performs significantly better than commonly used heuristics, leading to a productivity gain of more than 20%.
Similar content being viewed by others
References
Bohrer P (2005) Crane scheduling in container terminals. Diploma thesis, Department of Mathematics, University of Kaiserslautern
Choe R, Park T, Min Ok S, Ryel Ryu K (2007) Real-time scheduling for non-crossing stacking cranes in an automated container terminal. In: AI 2007: advances in artificial intelligence, lecture notes in computer science. Springer, Berlin/Heidelberg, pp 625–631
Daganzo CF (1989) The crane scheduling problem. Transp Res 23B(3): 159–175
Froyland G, Koch T, Megow N, Duane E, Wren H (2008) Optimizing the landside operation of a container terminal. OR Spectr 30(1): 53–75
Kim KH, Kim KY (1999) An optimal routing algorithm for a transfer crane in port container terminals. Transp Sci 33(1): 17–33
Koch T (2004) Rapid mathematical programming. PhD thesis, TU Berlin. Available as ZIB-Report 04-58
Narasimhan A, Palekar US (2002) Analysis and algorithms for the transtainer routing problem in container port operations. Transp Sci 36(1): 63–78
Ng WC (2005) Crane scheduling in container yards with inter-crane interference. Eur J Oper Res 164(1): 64–78
Ng WC, Mak KL (2005) Yard crane scheduling in port container terminals. Appl Math Model 29(3): 263–276
Saanen Y (2004) An approach for designing robotized marine container terminals. PhD thesis, Delft University of Technology
Saanen Y, van Valkengoed M (2006) Comparison of three automated stacking alternatives by means of simulation. In: Proceedings of the winter simulation conference 2005, pp 1567–1576
Saanen Y, Rijsenbrij J (2007) Which system fits your hub? In: Cargo Systems, June 2007, pp 47–51
Stahlbock R, Voß S (2008) Operations research at container terminals: a literature update. OR Spectr 30(1): 1–52
Stahlbock R, Voß S, Eisenberg R (2008) Increasing the efficiency of container terminals by automated double rail mounted gantry cranes. In: Presented at the 3rd German–Korean workshop on container terminal management: IT-based planning and control of seaport container terminals and transportation systems, August 27–31, Bremen, Germany
van Valkengoed M (2004) How passing cranes influence stack operations in a container terminal: a simulation study. TBA Nederland, Delft, and Master’s thesis, University of Amsterdam
Zyngiridis I (2005) Optimizing container movements using one and two automated stacking cranes. Master’s thesis, Naval Postgraduate School, Monterey
Author information
Authors and Affiliations
Corresponding authors
Rights and permissions
About this article
Cite this article
Dorndorf, U., Schneider, F. Scheduling automated triple cross-over stacking cranes in a container yard. OR Spectrum 32, 617–632 (2010). https://doi.org/10.1007/s00291-010-0206-3
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00291-010-0206-3