● ( ) is a programming model and an associated implementation for processing and generating big data sets with a parallel, distributed algorithm on a cluster. The model is a specialization of the split-apply-combine strategy for data analysis.
A. HDFS B. Chukwa C. MapReduce D. HBase
● The IoT architecture can be divided into three layers. ( ) is the key layer to realize the foundational capabilities which support the electronic devices interact with physical world.
A. Sensing layer B. Network layer
C. Application layer D. Operation layer
● Project Integration Management includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups. ( ) process does not belong to Project Integration Management.
A. Developing project charter
B. Developing project management plan
C. Analyzing project risks
D.Monitoring and controlling project
● In project management and systems engineering, ( ) is a deliverable-oriented breakdown of a project into smaller components. It is a key project deliverable that organizes the team's work into manageable sections.
A. RBS B. PBS
C. GBS D. WBS
● ( ) is the sum of all budgets established for the work to be performed.
A. CPI B. BAC C. SPI D. EAC
● Cloud storage is a model of computer of computer data storage in which the digital data is stored in logical pools. The physical storage spans multiple servers (sometimes in multiple locations), and the physical environment is typically owned and managed by a hosting company. As for the cloud concept, the cloud storage service is one kind of ( ).
A. IaaS
B. PaaS
C. SaaS
D. DaaS
● ( )is a subset of artificial intelligence in the field of computer science that often uses statistical techniques give computers the ability to " learn " ( i.e., progressively improve performance on a specific task ) with data. Without being explicitly programmed.
A. Machine learning
B. Program language learning
C. Natural language learning
D. Statistical learning
● Configuration management is focus on the specification of both the deliverables and the processes;While ( ) is focused on identifying, documenting, and approving or rejecting changes to the project documents, deliverables, or baselines.
A. cost management
B. change management
C. configuration management
D. capacity management
● Quality management ensures that an organization product or service is consistent. It has four main components: quality planning, quality assurance ( ) and quality improvement.
A. quality objective
B. quality policy
C. quality control
D. quality system
● In a project plan, when the project manager schedules activities, he (or she) often uses ( ) method, precedence relationships between activities are represented by circles connected by one or more arrows. The length of the arrow represents the duration of the relevant activity.
A.causality diagram
B.Gantt chart
C.histogram
D.arrow diagram
文章源于网络,如有侵权,请私信文章标题联系删除,谢谢。
为了能让更多人享受软考的政策福利和现实功利,51CTO旗下软考教研团队联合薛大龙老师,认真严肃向大家推出软考2日直播特训营。
扫码入群0元领取6G的软考6资料包+2天软考特训营名额
软考资料包括:软考16本电子版教材 & 36本辅导教材 + 27套历年真题试卷 + 21套精编知识点6G资料包
软考训练营名额+资料领取方式>>>
扫下方码入群后按照老师的要求操作即可领取。
51CTO软考两天直播训练营
这门课恰好能够为你答疑解惑,助你快速入门并掌握软考知识要点,获得技能提升。为自己的职业发展规划制定一个更明确的规划,迈出升职加薪的第一步。
训练营周期为 两天直播课 晚8:00-9:00
心急的小伙伴可直接扫码解锁。
☟☟☟
2天软考直播特训营
3大必备技能
↓↓↓
限时 0 元 即可解锁
点击下方链接报名
仅限前100个名额
报名链接: https://edu.51cto.com/surl=oR9sp3
课程涵盖:高分知识点梳理,案例分析解题方法、论文通用模板等。我们力争通过2天的直播课程,助力您快速入门并一次性通关软考!
如果你对这门课程还不太了解的话,就跟我一起往下看吧。
我们的主讲老师薛大龙老师,深耕软考教育培训20余年,主编出版软考辅导教材60余本,非常熟悉软考题目的要求、难度、以及判卷标准。
完成本体验营2天所有课程及作业考核,学员将掌握信息系统项目管理师、系统集成项目管理工程师的高频考点及答题技巧:
①掌握信息系统项目管理师知识体系;
②掌握考试高分占比知识领域;
③掌握考试考情前沿分析;
④掌握论文与案例超干货答题方法;
⑤掌握名师对真题的独到解析。
报名前,你还需要知道的3件事
1)课程形式
直播课程+社群学习活动
2)课程时间
报名后老师安排上课 晚8:00-9:00
3)报名后要做什么?
付费后根据提示添加学姐为好友,开营前学姐会统一拉人入群。
2天软考考证特训营
0 元 解锁课程
还可 领取「6G课程资料」
点击下方链接报名 仅限前100个名额
报名链接: https://edu.51cto.com/surl=oR9sp3