{"id":"https://openalex.org/W1972089258","doi":"https://doi.org/10.1504/ijmtm.2000.001385","title":"Production planning system redesign: a case study of food production","display_name":"Production planning system redesign: a case study of food production","publication_year":2000,"publication_date":"2000-01-01","ids":{"openalex":"https://openalex.org/W1972089258","doi":"https://doi.org/10.1504/ijmtm.2000.001385","mag":"1972089258"},"language":"en","primary_location":{"is_oa":false,"landing_page_url":"https://doi.org/10.1504/ijmtm.2000.001385","pdf_url":null,"source":{"id":"https://openalex.org/S137964361","display_name":"International Journal of Manufacturing Technology and Management","issn_l":"1368-2148","issn":["1368-2148","1741-5195"],"is_oa":false,"is_in_doaj":false,"is_core":true,"host_organization":"https://openalex.org/P4310317825","host_organization_name":"Inderscience Publishers","host_organization_lineage":["https://openalex.org/P4310317825"],"host_organization_lineage_names":["Inderscience Publishers"],"type":"journal"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false},"type":"article","type_crossref":"journal-article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5063670442","display_name":"Victor Portougal","orcid":null},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Victor Portougal","raw_affiliation_strings":[],"affiliations":[]}],"institution_assertions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":["https://openalex.org/A5063670442"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":true,"fulltext_origin":"ngrams","cited_by_count":1,"citation_normalized_percentile":{"value":0.478713,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":58,"max":65},"biblio":{"volume":"2","issue":"1/2/3/4/5/6/7","first_page":"953","last_page":"953"},"is_retracted":false,"is_paratext":false,"primary_topic":{"id":"https://openalex.org/T10164","display_name":"Quality and Supply Management","score":0.9609,"subfield":{"id":"https://openalex.org/subfields/1404","display_name":"Management Information Systems"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},"topics":[{"id":"https://openalex.org/T10164","display_name":"Quality and Supply Management","score":0.9609,"subfield":{"id":"https://openalex.org/subfields/1404","display_name":"Management Information Systems"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T13886","display_name":"Operations Management Techniques","score":0.9457,"subfield":{"id":"https://openalex.org/subfields/1803","display_name":"Management Science and Operations Research"},"field":{"id":"https://openalex.org/fields/18","display_name":"Decision Sciences"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T11741","display_name":"Flexible and Reconfigurable Manufacturing Systems","score":0.9343,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/material-requirements-planning","display_name":"Material requirements planning","score":0.63990265},{"id":"https://openalex.org/keywords/integrated-production","display_name":"Integrated production","score":0.45518774}],"concepts":[{"id":"https://openalex.org/C2777909354","wikidata":"https://www.wikidata.org/wiki/Q1386523","display_name":"Production planning","level":3,"score":0.71594715},{"id":"https://openalex.org/C167523981","wikidata":"https://www.wikidata.org/wiki/Q1365335","display_name":"Material requirements planning","level":3,"score":0.63990265},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.5370556},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.50330657},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.4810555},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.46940315},{"id":"https://openalex.org/C66341344","wikidata":"https://www.wikidata.org/wiki/Q2297743","display_name":"Integrated production","level":3,"score":0.45518774},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.34096634},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.3345007},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.09437832},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"is_oa":false,"landing_page_url":"https://doi.org/10.1504/ijmtm.2000.001385","pdf_url":null,"source":{"id":"https://openalex.org/S137964361","display_name":"International Journal of Manufacturing Technology and Management","issn_l":"1368-2148","issn":["1368-2148","1741-5195"],"is_oa":false,"is_in_doaj":false,"is_core":true,"host_organization":"https://openalex.org/P4310317825","host_organization_name":"Inderscience Publishers","host_organization_lineage":["https://openalex.org/P4310317825"],"host_organization_lineage_names":["Inderscience Publishers"],"type":"journal"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false}],"best_oa_location":null,"sustainable_development_goals":[],"grants":[],"datasets":[],"versions":[],"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W652005251","https://openalex.org/W619896542","https://openalex.org/W574686416","https://openalex.org/W3168076711","https://openalex.org/W2592044638","https://openalex.org/W2550839360","https://openalex.org/W2510773387","https://openalex.org/W2083928279","https://openalex.org/W2026960789","https://openalex.org/W1535178592"],"abstract_inverted_index":{"Efficient":[0],"innovation":[1],"management":[2],"implies":[3],"permanent":[4],"business":[5],"process":[6],"redesign,":[7],"particularly":[8],"in":[9,45,65],"the":[10,24,46,78],"production":[11,36,47,59],"planning":[12,37,48,60],"area.":[13],"New":[14,67],"products":[15],"and":[16,38,61],"new":[17,81],"technologies":[18],"may":[19,41],"completely":[20],"change":[21],"not":[22],"only":[23],"material":[25],"flow,":[26],"but":[27],"also":[28],"other":[29],"conditions":[30],"that":[31],"are":[32],"essential":[33],"for":[34],"effective":[35],"scheduling.":[39],"This":[40,50],"require":[42],"sufficient":[43],"changes":[44],"system.":[49],"idea":[51],"is":[52],"illustrated":[53],"by":[54],"a":[55,66,75],"case":[56],"study":[57],"of":[58,77,80],"scheduling":[62],"system":[63],"redesign":[64],"Zealand":[68],"medium":[69],"size":[70],"food":[71],"manufacturing":[72],"company,":[73],"as":[74],"result":[76],"introduction":[79],""multipack"":[82],"products.":[83]},"cited_by_api_url":"https://api.openalex.org/works?filter=cites:W1972089258","counts_by_year":[],"updated_date":"2024-12-10T13:57:47.127237","created_date":"2016-06-24"}