{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T14:51:57Z","timestamp":1740149517264,"version":"3.37.3"},"reference-count":38,"publisher":"MDPI AG","issue":"10","license":[{"start":{"date-parts":[[2022,5,22]],"date-time":"2022-05-22T00:00:00Z","timestamp":1653177600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100007835","name":"Faculty of Mechanical Engineering of the Silesian University of Technology","doi-asserted-by":"publisher","award":["10\/020\/BK_22\/1022"],"id":[{"id":"10.13039\/501100007835","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Sensors"],"abstract":"In selective serial disassembly sequence planning, when the target node (component) is reached, the selective disassembly task is completed and the refurbished component is repaired, reused or remanufactured. Since the efficient utilization of existing resources is necessary, it is crucial to predict disassembly operation times and the condition of joints for recycling, reusing or remanufacturing. The method of estimating the disassembly times of a joint if it is intended for remanufacturing, recycling and reuse is an important and urgent requirement for research development and results. The aim of the paper is to investigate the disassembly system with predicted operation times and the quality of product connections (joints) in order to balance the line smoothness index, to minimize a line time factor, line efficiency and profit and minimize an ex post error. Disassembly times for remanufacturing, recycling and reuse are estimated separately based on the historical data of disassembly times and the quality of joints. The presented estimation method of disassembly operation times increases the reliability and efficiency of elaborated balances of tasks in lines. Underestimated disassembly operation times can be compensated for during the idle points in the successive cycles, provided that the transport operations are performed manually and that travel time determines the cycle time.<\/jats:p>","DOI":"10.3390\/s22103920","type":"journal-article","created":{"date-parts":[[2022,5,22]],"date-time":"2022-05-22T11:13:57Z","timestamp":1653218037000},"page":"3920","source":"Crossref","is-referenced-by-count":7,"title":["A Predictive Approach for Disassembly Line Balancing Problems"],"prefix":"10.3390","volume":"22","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-3870-7509","authenticated-orcid":false,"given":"Iwona","family":"Paprocka","sequence":"first","affiliation":[{"name":"Department of Engineering Processes Automation and Integrated Manufacturing Systems, Faculty of Mechanical Engineering, Silesian University of Technology, Konarskiego 18A Str., 44-100 Gliwice, Poland"}]},{"given":"Bo\u017cena","family":"Sko\u0142ud","sequence":"additional","affiliation":[{"name":"Department of Engineering Processes Automation and Integrated Manufacturing Systems, Faculty of Mechanical Engineering, Silesian University of Technology, Konarskiego 18A Str., 44-100 Gliwice, Poland"}]}],"member":"1968","published-online":{"date-parts":[[2022,5,22]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"599","DOI":"10.1080\/00207543.2018.1472404","article-title":"Applying data mining technique to disassembly sequence planning: A method to assess effective disassembly time of industrial products","volume":"57","author":"Marconi","year":"2019","journal-title":"Int. J. Prod. Res."},{"key":"ref_2","unstructured":"(2011, June 08). Directive of the European Parliament and of the Council on the Restriction of the Use of Certain Hazardous Substances in Electrical and Electronic Equipment. Available online: https:\/\/eur-lex.europa.eu\/legal-content\/en\/TXT\/?uri=CELEX:32011L0065."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1007\/s10479-016-2272-7","article-title":"Integrating disassembly line balancing in the planning of a reverse logistics network from the perspective of a third party provider","volume":"253","author":"Kannan","year":"2017","journal-title":"Ann. Oper. Res."},{"key":"ref_4","unstructured":"(2005, October 31). Dz.U. 2005 nr 180 poz. 1495. Act of 29 July 2005 on Waste Electrical and Electronic Equipment, (In Polish)."},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"3134","DOI":"10.1080\/00207543.2017.1412527","article-title":"Robotic disassembly sequence planning using enhanced discrete bees algorithm in remanufacturing","volume":"56","author":"Liu","year":"2018","journal-title":"Int. J. Prod. Res."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1023\/A:1014434117888","article-title":"Balancing and Scheduling Mixed-Model U-Shaped Production Lines","volume":"14","author":"Miltenburg","year":"2002","journal-title":"Int. J. Flex. Manuf. Syst."},{"key":"ref_7","unstructured":"Steffen, A. (2017). Second-Hand Consumption as a Lifestyle Choice, Hochschule f\u00fcr Internationales Management\u2014International University Heidelberg."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"748","DOI":"10.1016\/j.cie.2010.07.031","article-title":"Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line","volume":"59","author":"Ilgin","year":"2010","journal-title":"Comput. Ind. Eng."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"1337","DOI":"10.1007\/s00170-016-9434-2","article-title":"Optimization of disassembly sequence planning for preventive maintenance","volume":"90","author":"Kheder","year":"2017","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"413","DOI":"10.1016\/j.cie.2013.03.014","article-title":"Multi-objective optimisation of stochastic disassembly line balancing with station paral-leling","volume":"65","author":"Turkbey","year":"2013","journal-title":"Comput. Ind. Eng."},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"638","DOI":"10.1016\/j.jmsy.2014.11.002","article-title":"Disassembly line balancing under high varitey of end of life states using a joint precedence graph approach","volume":"37","author":"Riggs","year":"2015","journal-title":"J. Manuf. Syst."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1080\/07408170801965082","article-title":"Assembly line balancing: Joint precedence graphs under high product variety","volume":"41","author":"Boysen","year":"2009","journal-title":"IIE Trans."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"6108","DOI":"10.1080\/00207543.2017.1324225","article-title":"Disassembly line balancing using linear physical programming","volume":"55","author":"Ilgin","year":"2017","journal-title":"Int. J. Pro-Duction Res."},{"key":"ref_14","unstructured":"Taufiqurrachman, A.G. (2022, April 30). Kanban and Critical Path Methodology Overview and Comparison. Available online: https:\/\/www.researchgate.net\/publication\/360129158."},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"1405","DOI":"10.1080\/00207540600943985","article-title":"A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem","volume":"46","author":"Agrawal","year":"2008","journal-title":"Int. J. Prod. Res."},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"4805","DOI":"10.1080\/00207543.2018.1428775","article-title":"Disassembly line balancing problem: A review of the state of the art and future directions","volume":"57","author":"Kalayci","year":"2019","journal-title":"Int. J. Prod. Res."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1007\/s00170-017-1201-5","article-title":"Time-based disassembly method: How to assess the best disassembly sequence and time of target components in complex products","volume":"95","author":"Mandolini","year":"2018","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"5507","DOI":"10.3390\/s21165507","article-title":"On the time to buffer overflow in a queueing model with a general independent input stream and power-saving mechanism based on working vacations","volume":"21","author":"Kobielnik","year":"2021","journal-title":"Sensors"},{"key":"ref_19","unstructured":"Ayat, M., Sarfraz, T., Ilyas, M., Elmahi, A., and Ibrahim, M. (2017, January 9\u201310). A case study of line balancing using largest candidate rule algorithm in a manufacturing industry. Proceedings of the 8th International Conference on Management Research ICMR 2017, Lahore, Pakistan."},{"key":"ref_20","doi-asserted-by":"crossref","unstructured":"Francia, D., Ponti, S., Frizziero, L., and Liverani, A. (2019). Virtual Mechanical Product Disassembly Sequences Based on Disassembly Order Graphs and Time Measurement Units. Appl. Sci., 9.","DOI":"10.3390\/app9173638"},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1016\/S0169-8141(03)00067-2","article-title":"Evaluation of disassemblability to enable design for disassembly in mass production","volume":"32","author":"Desai","year":"2003","journal-title":"Int. J. Ind. Ergon."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"507","DOI":"10.1007\/s00170-005-0036-7","article-title":"A hierarchical approach to disassembly sequence planning for mechanical product","volume":"30","author":"Dong","year":"2006","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_23","doi-asserted-by":"crossref","unstructured":"Grzechca, W. (2015, January 15\u201317). Assembly line balancing problem with quality inspection stations. Proceedings of the 2015 IEEE 7th International Conference on Cybernetics and Intelligent Systems (CIS) and Robotics, Automation and Mechatronics (RAM), Angkor Wat, Cambodia.","DOI":"10.1109\/ICCIS.2015.7274602"},{"key":"ref_24","unstructured":"(2007, January 31). Application of Ranked Positional Weight Method for Assembly Line Balancing\u2014A Case Study. Available online: https:\/\/www.researchgate.net\/publication\/296443466_."},{"key":"ref_25","unstructured":"Grzechca, W. (2022, May 18). Rebalans Linii Monta\u017cowej. Biuletyn Wat 2007. XI Szko\u0142a Komputerowego Wspomagania Projektowania, Wytwarzania i Eksploatacji. Publisher Wojskowa Akademia Techniczna, Warsaw 2007. Available online: http:\/\/www.wat.edu.pl\/00BIU\/Rok_2007\/Nr_specjalny\/calosc.pdf."},{"key":"ref_26","doi-asserted-by":"crossref","unstructured":"Scholl, A. (1999). Balancing and Sequencing of Assembly Lines, Physica.","DOI":"10.1007\/978-3-662-11223-6"},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"1427","DOI":"10.1080\/00207540110052157","article-title":"A solution approach to the disassembly line balancing problem in the presence of task failures","volume":"39","author":"Gungor","year":"2001","journal-title":"Int. J. Prod. Res."},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"324","DOI":"10.1109\/TASE.2005.860989","article-title":"A systematic approach to design and operation of disassembly lines","volume":"3","author":"Tang","year":"2006","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"866","DOI":"10.1080\/07408170802510390","article-title":"Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND\/OR graph","volume":"41","author":"Koc","year":"2009","journal-title":"IIE Trans."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"6082","DOI":"10.1080\/00207543.2013.795251","article-title":"Mixed model disassembly line balancing problem with fuzzy goals","volume":"51","author":"Paksoy","year":"2013","journal-title":"Int. J. Prod. Res."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"2103","DOI":"10.1007\/s00170-019-04241-9","article-title":"Product cooperative disassembly sequence and task planning based on genetic algorithm","volume":"105","author":"Tian","year":"2019","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1016\/S0360-8352(96)00193-3","article-title":"Algorithms for sequencing mixed models on an assembly line in a JiT production system","volume":"32","author":"Xiaobo","year":"1997","journal-title":"Comput. Ind. Engng."},{"key":"ref_33","doi-asserted-by":"crossref","unstructured":"Paprocka, I., and Kempa, W.M. (2021). Model of Production System Evaluation with the Influence of FDM Machine Reliability and Process-Dependent Product Quality. Materials, 14.","DOI":"10.3390\/ma14195806"},{"key":"ref_34","doi-asserted-by":"crossref","unstructured":"Zabojszcza, P., Rado\u0144, U., and Szaniec, W. (2021). Probabilistic Approach to Limit States of a Steel Dome. Materials, 14.","DOI":"10.3390\/ma14195528"},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"568","DOI":"10.4028\/www.scientific.net\/AMR.824.568","article-title":"Assembly Line Re-Balancing Using Ranked Positional Weight Technique and Longest Operating Time Technique: A Comparative Analysis","volume":"824","author":"Edokpia","year":"2013","journal-title":"Adv. Mater. Res."},{"key":"ref_36","first-page":"254","article-title":"Application of Ranked Position Weighted (RPW) Method for Assembly Line Balancing","volume":"3","author":"Chavare","year":"2015","journal-title":"Int. J. Res. Appl. Sci. Eng. Technol."},{"key":"ref_37","unstructured":"Grzechca, W. (2022, May 18). Stabilno\u015b\u0107 Struktury Linii Monta\u017cowej. Komputerowo Zintegrowane Zarz\u0105dzanie. Publisher: Oficyna Wydaw. Polskiego Towarzystwa Zarz\u0105dzania Produkcj\u0105, Opole. Available online: https:\/\/www.ptzp.org.pl\/files\/konferencje\/kzz\/artyk_pdf_2011\/037.pdf."},{"key":"ref_38","doi-asserted-by":"crossref","first-page":"140","DOI":"10.1108\/AA-12-2017-180","article-title":"A hybrid artificial fish swam algorithm for disassembly sequence planning considering setup time","volume":"39","author":"Guo","year":"2019","journal-title":"Assem. Autom."}],"container-title":["Sensors"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/1424-8220\/22\/10\/3920\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,30]],"date-time":"2024-07-30T02:52:26Z","timestamp":1722307946000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/1424-8220\/22\/10\/3920"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,5,22]]},"references-count":38,"journal-issue":{"issue":"10","published-online":{"date-parts":[[2022,5]]}},"alternative-id":["s22103920"],"URL":"https:\/\/doi.org\/10.3390\/s22103920","relation":{},"ISSN":["1424-8220"],"issn-type":[{"type":"electronic","value":"1424-8220"}],"subject":[],"published":{"date-parts":[[2022,5,22]]}}}