{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T01:58:11Z","timestamp":1740103091773,"version":"3.37.3"},"publisher-location":"New York, NY, USA","reference-count":8,"publisher":"ACM","content-domain":{"domain":["dl.acm.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2024,1,19]]},"DOI":"10.1145\/3674225.3674281","type":"proceedings-article","created":{"date-parts":[[2024,7,31]],"date-time":"2024-07-31T18:23:05Z","timestamp":1722450185000},"page":"303-309","update-policy":"https:\/\/doi.org\/10.1145\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["A simulation platform for optimization scheduling of comprehensive energy system"],"prefix":"10.1145","author":[{"ORCID":"https:\/\/orcid.org\/0009-0004-6423-783X","authenticated-orcid":false,"given":"Tingting","family":"Yan","sequence":"first","affiliation":[{"name":"State Grid Information and Communication Industry Group Co, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0000-2114-1230","authenticated-orcid":false,"given":"Yunxi","family":"Fu","sequence":"additional","affiliation":[{"name":"State Grid Information and Communication Industry Group Co, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0004-7447-5591","authenticated-orcid":false,"given":"Ziting","family":"Gao","sequence":"additional","affiliation":[{"name":"State Grid Information and Communication Industry Group Co, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0001-2678-8081","authenticated-orcid":false,"given":"Chenyang","family":"Yan","sequence":"additional","affiliation":[{"name":"State Grid Information and Communication Industry Group Co, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0000-3619-4685","authenticated-orcid":false,"given":"Wenjuan","family":"Zhang","sequence":"additional","affiliation":[{"name":"State Grid Information and Communication Industry Group Co, China"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-9313-6561","authenticated-orcid":false,"given":"Min","family":"Zhang","sequence":"additional","affiliation":[{"name":"State Grid Information and Communication Industry Group Co, China"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3122-232X","authenticated-orcid":false,"given":"Zhenya","family":"Wang","sequence":"additional","affiliation":[{"name":"State Grid Information and Communication Industry Group Co, China"}]}],"member":"320","published-online":{"date-parts":[[2024,7,31]]},"reference":[{"key":"e_1_3_2_1_1_1","volume-title":"Zhang Y and Ling H (2021)","author":"Chen X","year":"2021","unstructured":"Chen X, Huang J, Jin S, Zhang Y and Ling H (2021) A Hybrid Simulation Study of the Herding Behavior Effects in the China National Carbon Market. In: 2021 IEEE 5th Conference on Energy Internet and Energy System Integration. Taiyuan. pp. 3911-3917."},{"key":"e_1_3_2_1_2_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2020.112589"},{"key":"e_1_3_2_1_3_1","doi-asserted-by":"publisher","DOI":"10.1109\/NAPS.2018.8600539"},{"key":"e_1_3_2_1_4_1","first-page":"228","volume-title":"E3S Web of Conferences. Ternate.","author":"Chen B","unstructured":"Chen B, Han X, Zhang W, Tian H, Wei D and Che B (2021) Research on Planning and Optimization of Integrated Energy system for ubiquitous access. In: E3S Web of Conferences. Ternate. pp. 228, 01019."},{"issue":"14","key":"e_1_3_2_1_5_1","first-page":"83","article-title":"Effect of Heating Network Characteristics on Ultra-short-term Scheduling of Integrated Energy System","volume":"42","author":"Yao S","year":"2018","unstructured":"Yao S, Gu W, Zhang X, Zhao B, Lu S and Wu C (2018) Effect of Heating Network Characteristics on Ultra-short-term Scheduling of Integrated Energy System. J. Automation of Electric Power Systems, 42(14): 83-90.","journal-title":"J. Automation of Electric Power Systems"},{"key":"e_1_3_2_1_6_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2019.04.049"},{"volume-title":"Zhao H and Zhu P (2021)","author":"Yang X","key":"e_1_3_2_1_7_1","unstructured":"Yang X, Sun K, Shen K, Shang J, Zhao T, Zhao H and Zhu P (2021) Research on Multi-integrated and Highly Flexible Distribution Network Planning in the Form of Energy Internet. In: International Conference on Control Science and Electric Power Systems (CSEPS). Shanghai. pp. 199-204."},{"key":"e_1_3_2_1_8_1","doi-asserted-by":"publisher","DOI":"10.1137\/1037125"}],"event":{"name":"PEAI 2024: 2024 International Conference on Power Electronics and Artificial Intelligence","acronym":"PEAI 2024","location":"Xiamen China"},"container-title":["2024 International Conference on Power Electronics and Artificial Intelligence"],"original-title":[],"link":[{"URL":"https:\/\/dl.acm.org\/doi\/pdf\/10.1145\/3674225.3674281","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,8,1]],"date-time":"2024-08-01T00:05:38Z","timestamp":1722470738000},"score":1,"resource":{"primary":{"URL":"https:\/\/dl.acm.org\/doi\/10.1145\/3674225.3674281"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,1,19]]},"references-count":8,"alternative-id":["10.1145\/3674225.3674281","10.1145\/3674225"],"URL":"https:\/\/doi.org\/10.1145\/3674225.3674281","relation":{},"subject":[],"published":{"date-parts":[[2024,1,19]]},"assertion":[{"value":"2024-07-31","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}