{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,11,19]],"date-time":"2024-11-19T17:36:50Z","timestamp":1732037810292},"reference-count":66,"publisher":"Wiley","issue":"2","license":[{"start":{"date-parts":[[2018,8,14]],"date-time":"2018-08-14T00:00:00Z","timestamp":1534204800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/onlinelibrary.wiley.com\/termsAndConditions#vor"}],"content-domain":{"domain":["onlinelibrary.wiley.com"],"crossmark-restriction":true},"short-container-title":["Computer aided Civil Eng"],"published-print":{"date-parts":[[2019,2]]},"abstract":"Abstract<\/jats:title>Construction projects do not often reach their expected results regarding time, cost, and quality, due to the internal and external environment variations. Despite a substantial literature about risk management, no generic approach is proposed to represent construction project considering together technical and human dimensions or sustainability with their uncertainties. Modeling complex dynamical systems from heterogeneous pieces of knowledge varying in precision and reliability is a challenging task. This article proposes an innovative generic and versatile approach, based on the formalism of hierarchical probabilistic relational models to analyze and to propagate uncertainty in construction project regarding different levels of knowledge. The aim is to obtain a flexible, portable, and versatile model able to simulate the behavior of complex system's entities involved in any construction project at different levels of detail while taking uncertainty into account. To illustrate and highlight this approach, an academic example and a real case are proposed.<\/jats:p>","DOI":"10.1111\/mice.12391","type":"journal-article","created":{"date-parts":[[2018,8,14]],"date-time":"2018-08-14T14:35:44Z","timestamp":1534257344000},"page":"97-115","update-policy":"http:\/\/dx.doi.org\/10.1002\/crossmark_policy","source":"Crossref","is-referenced-by-count":20,"title":["Uncertainty Processing and Risk Monitoring in Construction Projects Using Hierarchical Probabilistic Relational Models"],"prefix":"10.1111","volume":"34","author":[{"given":"C\u00e9dric","family":"Baudrit","sequence":"first","affiliation":[{"name":"INRA Universit\u00e9 de Bordeaux I2M Talence France"}]},{"given":"Franck","family":"Taillandier","sequence":"additional","affiliation":[{"name":"Universit\u00e9 de Bordeaux I2M Talence France"}]},{"given":"Thi Thuy Phuong","family":"Tran","sequence":"additional","affiliation":[{"name":"Universit\u00e9 de Bordeaux I2M Talence France"}]},{"given":"Denys","family":"Breysse","sequence":"additional","affiliation":[{"name":"Universit\u00e9 de Bordeaux I2M Talence France"}]}],"member":"311","published-online":{"date-parts":[[2018,8,14]]},"reference":[{"key":"e_1_2_7_2_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2005.11.010"},{"key":"e_1_2_7_3_1","doi-asserted-by":"publisher","DOI":"10.1111\/mice.12279"},{"key":"e_1_2_7_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2015.08.007"},{"key":"e_1_2_7_5_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4419-9368-7"},{"issue":"3","key":"e_1_2_7_6_1","first-page":"449","article-title":"An ontological and semantic approach for the construction risk inferring and application","volume":"79","author":"Botao Z.","year":"2015","journal-title":"Journal of Intelligent & Robotic Systems"},{"key":"e_1_2_7_7_1","doi-asserted-by":"publisher","DOI":"10.1109\/69.494161"},{"issue":"1","key":"e_1_2_7_8_1","first-page":"67","article-title":"Factors affecting contractors' risk of cost overburden","volume":"14","author":"Burcu A.","year":"1998","journal-title":"Journal of Management in Engineering"},{"key":"e_1_2_7_9_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2005)131:10(1115)"},{"key":"e_1_2_7_10_1","volume-title":"Graph\u2010Based Knowledge Representation: Computational Foundations of Conceptual Graphs","author":"Chein M.","year":"2008"},{"key":"e_1_2_7_11_1","doi-asserted-by":"publisher","DOI":"10.1016\/0004-3702(90)90060-D"},{"key":"e_1_2_7_12_1","doi-asserted-by":"publisher","DOI":"10.1080\/014461998372574"},{"key":"e_1_2_7_13_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2005)19:4(394)"},{"key":"e_1_2_7_14_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2012.04.005"},{"key":"e_1_2_7_15_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000090"},{"key":"e_1_2_7_16_1","doi-asserted-by":"publisher","DOI":"10.1002\/pmj.21409"},{"key":"e_1_2_7_17_1","doi-asserted-by":"publisher","DOI":"10.1080\/01944360508976688"},{"key":"e_1_2_7_18_1","first-page":"307","volume-title":"Learning Probabilistic Relational Models","author":"Getoor L.","year":"2001"},{"key":"e_1_2_7_19_1","doi-asserted-by":"crossref","DOI":"10.7551\/mitpress\/7432.001.0001","volume-title":"Introduction to Statistical Relational Learning (Adaptive Computation and Machine Learning)","author":"Getoor L.","year":"2007"},{"key":"e_1_2_7_20_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-60045-1_20"},{"key":"e_1_2_7_21_1","doi-asserted-by":"publisher","DOI":"10.1002\/9781118671092"},{"key":"e_1_2_7_22_1","first-page":"33","volume-title":"A Tutorial on Learning with Bayesian Networks","author":"Heckerman D.","year":"2008"},{"key":"e_1_2_7_23_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.07.014"},{"key":"e_1_2_7_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/0004-3702(90)90020-Z"},{"key":"e_1_2_7_25_1","first-page":"150","article-title":"Risk analysis of construction schedule based on PERT and MC simulation","author":"Huang J.","year":"2009","journal-title":"IEEE\u2010International Conference on Innovation Management and Industrial Engineering"},{"key":"e_1_2_7_26_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.buildenv.2008.04.008"},{"key":"e_1_2_7_27_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-0-387-68282-2"},{"issue":"5","key":"e_1_2_7_28_1","doi-asserted-by":"crossref","first-page":"1212","DOI":"10.4304\/jnw.8.5.1212-1220","article-title":"Ontology\u2010based semantic retrieval for risk management of construction project","volume":"8","author":"Jiang S.","year":"2013","journal-title":"Journal of Networks: JNW"},{"key":"e_1_2_7_29_1","volume-title":"2nd International Conference on Civil, Materials and Environmental Sciences","author":"Jianqiang T.","year":"2015"},{"key":"e_1_2_7_30_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(98)00043-X"},{"key":"e_1_2_7_31_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0001331"},{"key":"e_1_2_7_32_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(99)00035-6"},{"key":"e_1_2_7_33_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0001306"},{"key":"e_1_2_7_34_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0004-3702(99)00062-4"},{"key":"e_1_2_7_35_1","volume-title":"6th International CSECM","author":"Mallawaarachchi H.","year":"2015"},{"key":"e_1_2_7_36_1","doi-asserted-by":"publisher","DOI":"10.1111\/mice.12179"},{"key":"e_1_2_7_37_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.resconrec.2013.10.015"},{"key":"e_1_2_7_38_1","unstructured":"Mehdizadeh R.(2012) Dynamic and multi\u2010perspective risk management of construction projects using tailor\u2010made risk breakdown structures. Ph.D. thesis Bordeaux University."},{"key":"e_1_2_7_39_1","volume-title":"Natural Hazards in Australia: Identifying Risk Analysis Requirements","author":"Middlemann M.","year":"2007"},{"key":"e_1_2_7_40_1","doi-asserted-by":"publisher","DOI":"10.1139\/l96-122"},{"key":"e_1_2_7_41_1","doi-asserted-by":"publisher","DOI":"10.1109\/ICMSAO.2013.6552583"},{"key":"e_1_2_7_42_1","unstructured":"Murphy K. Weiss Y.&Jordan M.(2013) Loopy belief propagation for approximate inference: an empirical study CoRR abs\/1301.6725."},{"key":"e_1_2_7_43_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2003)129:5(518)"},{"key":"e_1_2_7_44_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2015.03.009"},{"key":"e_1_2_7_45_1","volume-title":"Introduction to Complexity and Complex Systems","author":"Northrop R. B.","year":"2010"},{"key":"e_1_2_7_46_1","doi-asserted-by":"publisher","DOI":"10.1002\/0470033312"},{"key":"e_1_2_7_47_1","doi-asserted-by":"publisher","DOI":"10.3182\/20100712-3-FR-2020.00082"},{"key":"e_1_2_7_48_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(01)00040-0"},{"key":"e_1_2_7_49_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-90-481-8847-5"},{"key":"e_1_2_7_50_1","volume-title":"Graph Databases","author":"Robinson I.","year":"2013"},{"key":"e_1_2_7_51_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.2009.00632.x"},{"key":"e_1_2_7_52_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0167-9473(99)00110-3"},{"key":"e_1_2_7_53_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2016.11.632"},{"key":"e_1_2_7_54_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0888-613X(97)89135-9"},{"key":"e_1_2_7_55_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2011.07.003"},{"key":"e_1_2_7_56_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.2012.00759.x"},{"key":"e_1_2_7_57_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2008.10.005"},{"key":"e_1_2_7_58_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2015.06.005"},{"key":"e_1_2_7_59_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2013.03.004"},{"key":"e_1_2_7_60_1","doi-asserted-by":"publisher","DOI":"10.1145\/1189136.1189170"},{"key":"e_1_2_7_61_1","unstructured":"Torti L.(2012) Structured probabilistic inference in object\u2010oriented Bayesian Networks. Ph.D. thesis Paris VI\u2013UPMC."},{"key":"e_1_2_7_62_1","unstructured":"Torti L. Wuillemin P.&Gonzales C.(2010) Reinforcing the object\u2010oriented aspect of probabilistic relational models inPGM 2010 Finland pp. 273\u201380."},{"key":"e_1_2_7_63_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2009.05.005"},{"key":"e_1_2_7_64_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2015.03.008"},{"key":"e_1_2_7_65_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2015.06.013"},{"key":"e_1_2_7_66_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijar.2012.04.004"},{"key":"e_1_2_7_67_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2010.07.013"}],"container-title":["Computer-Aided Civil and Infrastructure Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.wiley.com\/onlinelibrary\/tdm\/v1\/articles\/10.1111%2Fmice.12391","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1111\/mice.12391","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,9,14]],"date-time":"2023-09-14T17:10:58Z","timestamp":1694711458000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1111\/mice.12391"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,8,14]]},"references-count":66,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2019,2]]}},"alternative-id":["10.1111\/mice.12391"],"URL":"https:\/\/doi.org\/10.1111\/mice.12391","archive":["Portico"],"relation":{},"ISSN":["1093-9687","1467-8667"],"issn-type":[{"value":"1093-9687","type":"print"},{"value":"1467-8667","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,8,14]]},"assertion":[{"value":"2018-08-14","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}