{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,2]],"date-time":"2024-09-02T19:47:18Z","timestamp":1725306438247},"reference-count":10,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,12]]},"DOI":"10.1109\/wsc.2014.7020099","type":"proceedings-article","created":{"date-parts":[[2015,1,27]],"date-time":"2015-01-27T15:30:56Z","timestamp":1422372656000},"source":"Crossref","is-referenced-by-count":2,"title":["Evaluations on scheduling in semiconductor manufacturing by backward simulation"],"prefix":"10.1109","author":[{"given":"Wolfgang","family":"Scholl","sequence":"first","affiliation":[]},{"given":"Christoph","family":"Laroque","sequence":"additional","affiliation":[]},{"given":"Gerald","family":"Weigert","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref4","article-title":"Backward Simulation with Multiple Objectives Control","author":"huang","year":"2009","journal-title":"Proceeedings of the International Multi Conference of Engineers and Computer Scientists 2009"},{"key":"ref3","first-page":"1741","article-title":"Simulation Based Scheduling System in a Semiconductor Backend Facility","author":"horn","year":"2006","journal-title":"Proceedings of the Winter Simulation Conference"},{"key":"ref10","first-page":"1008","article-title":"Order Release Planning in a Job Shop using a Bidirectional Simulation Algorithm","author":"ying","year":"0","journal-title":"Proceedings of the 26th Conference on Winter Simulation"},{"key":"ref6","author":"law","year":"2000","journal-title":"Simulation Modeling and Analysis"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1145\/268437.268622"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1145\/256563.256886"},{"key":"ref7","first-page":"5","article-title":"Der Modellbildungsprozess in der Simulation","author":"schumacher","year":"2000","journal-title":"Referenzmodelle für die Simulation in Produktion und Logistik"},{"key":"ref2","article-title":"Backward Simulation in Food Industry for Facility Planning and Daily Scheduling","author":"graupner","year":"0","journal-title":"16th European Simulation Symposium"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1145\/268437.268621"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1111\/1475-3995.00347"}],"event":{"name":"2014 Winter Simulation Conference - (WSC 2014)","location":"Savanah, GA, USA","start":{"date-parts":[[2014,12,7]]},"end":{"date-parts":[[2014,12,10]]}},"container-title":["Proceedings of the Winter Simulation Conference 2014"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7002492\/7019868\/07020099.pdf?arnumber=7020099","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,24]],"date-time":"2017-03-24T05:04:31Z","timestamp":1490331871000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7020099\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12]]},"references-count":10,"URL":"https:\/\/doi.org\/10.1109\/wsc.2014.7020099","relation":{},"subject":[],"published":{"date-parts":[[2014,12]]}}}