{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T21:09:01Z","timestamp":1729631341819,"version":"3.28.0"},"reference-count":29,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,4]]},"DOI":"10.1109\/scis.2013.6613250","type":"proceedings-article","created":{"date-parts":[[2013,10,2]],"date-time":"2013-10-02T22:33:20Z","timestamp":1380753200000},"page":"36-43","source":"Crossref","is-referenced-by-count":4,"title":["Coordination mechanism of maintenance scheduling using modified PSO in a restructured power market"],"prefix":"10.1109","author":[{"given":"Kaliyamoorthy","family":"Suresh","sequence":"first","affiliation":[]},{"given":"Narayanan","family":"Kumarappan","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"doi-asserted-by":"publisher","key":"19","DOI":"10.5370\/JEET.2011.6.4.431"},{"doi-asserted-by":"publisher","key":"17","DOI":"10.1049\/iet-gtd.2008.0427"},{"doi-asserted-by":"publisher","key":"18","DOI":"10.1109\/POWERI.2006.1632614"},{"doi-asserted-by":"publisher","key":"15","DOI":"10.1109\/TPWRS.2009.2036469"},{"doi-asserted-by":"publisher","key":"16","DOI":"10.1109\/TPWRS.2005.846078"},{"doi-asserted-by":"publisher","key":"13","DOI":"10.1109\/TPWRS.2007.913295"},{"doi-asserted-by":"publisher","key":"14","DOI":"10.1049\/ip-gtd:20030401"},{"doi-asserted-by":"publisher","key":"11","DOI":"10.1109\/TPWRS.2003.821616"},{"doi-asserted-by":"publisher","key":"12","DOI":"10.1109\/59.932294"},{"doi-asserted-by":"publisher","key":"21","DOI":"10.1109\/POWERI.2006.1632515"},{"doi-asserted-by":"publisher","key":"20","DOI":"10.1109\/MED.2007.4433766"},{"doi-asserted-by":"publisher","key":"22","DOI":"10.1109\/PMAPS.2010.5528314"},{"doi-asserted-by":"publisher","key":"23","DOI":"10.1109\/TPWRS.2008.2002296"},{"doi-asserted-by":"publisher","key":"24","DOI":"10.1049\/iet-gtd:20070126"},{"doi-asserted-by":"publisher","key":"25","DOI":"10.1016\/j.epsr.2007.01.006"},{"doi-asserted-by":"publisher","key":"26","DOI":"10.1016\/j.enpol.2009.08.060"},{"key":"27","first-page":"1010","article-title":"The ieee reliability test system-1996","volume":"14","year":"1999","journal-title":"IEEE Trans Power Syst"},{"doi-asserted-by":"publisher","key":"28","DOI":"10.1016\/j.swevo.2012.11.003"},{"year":"2005","journal-title":"PJM White Paper Section 12","article-title":"Generation adequacy. Analysis technical methods","key":"29"},{"doi-asserted-by":"publisher","key":"3","DOI":"10.1007\/978-1-4615-4473-9"},{"doi-asserted-by":"publisher","key":"2","DOI":"10.1007\/978-1-4615-7731-7"},{"doi-asserted-by":"publisher","key":"10","DOI":"10.1109\/ICPST.2008.4745384"},{"year":"1994","author":"wang","journal-title":"Modern Power System Planning","key":"1"},{"key":"7","first-page":"1958","article-title":"Particle swarm optimizer with neighborhood operator","volume":"1","author":"suganthan","year":"1999","journal-title":"Proc of IEEE Int Conf on Evolutionary Computation"},{"doi-asserted-by":"publisher","key":"6","DOI":"10.1109\/ICNN.1995.488968"},{"key":"5","doi-asserted-by":"crossref","first-page":"771","DOI":"10.1016\/j.epsr.2006.06.012","article-title":"Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches","volume":"77","author":"dahal","year":"2007","journal-title":"Int J Elect Power Syst Research"},{"doi-asserted-by":"publisher","key":"4","DOI":"10.1016\/S0142-0615(99)00062-9"},{"key":"9","first-page":"167","article-title":"Particle swarm optimization based approach for generator maintenance scheduling","volume":"1","author":"aik koay","year":"2003","journal-title":"Proc of Int Conf on Swarm Intelligence Symposium (SIS'03)"},{"key":"8","first-page":"4463","article-title":"Particle swarm optimization with adaptive parameter control and opposition","volume":"7","author":"wang","year":"2011","journal-title":"Int J of Computational Information Systems"}],"event":{"name":"2013 IEEE Symposium on Computational Intelligence in Scheduling (CISched)","start":{"date-parts":[[2013,4,16]]},"location":"Singapore, Singapore","end":{"date-parts":[[2013,4,19]]}},"container-title":["2013 IEEE Symposium on Computational Intelligence in Scheduling (CISched)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6596012\/6613243\/06613250.pdf?arnumber=6613250","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,21]],"date-time":"2017-06-21T23:02:28Z","timestamp":1498086148000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6613250\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,4]]},"references-count":29,"URL":"https:\/\/doi.org\/10.1109\/scis.2013.6613250","relation":{},"subject":[],"published":{"date-parts":[[2013,4]]}}}