{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,23]],"date-time":"2024-10-23T00:54:05Z","timestamp":1729644845040,"version":"3.28.0"},"reference-count":11,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2007]]},"DOI":"10.1109\/icnc.2007.739","type":"proceedings-article","created":{"date-parts":[[2008,8,27]],"date-time":"2008-08-27T18:00:48Z","timestamp":1219860048000},"page":"170-174","source":"Crossref","is-referenced-by-count":2,"title":["The Research of Network Planning Risk Element Transmission Theory Based on Genetic Algorithm"],"prefix":"10.1109","author":[{"given":"Cunbin","family":"Li","sequence":"first","affiliation":[]},{"given":"Kecheng","family":"Wang","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"3","first-page":"14","article-title":"The Optimum Route Algorithm for Dynamic Network Based on Genetic Algorithms","volume":"5","author":"liu","year":"2004","journal-title":"Journal of Information Engineering University"},{"key":"2","first-page":"53","article-title":"Application on the economic and risk analysis mode of the irrigation project","volume":"22","author":"li","year":"2004","journal-title":"Joural Of Economics of Water Resouces"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1080\/014461996373511"},{"year":"0","key":"1"},{"key":"7","first-page":"13","author":"lei","year":"1991","journal-title":"MATLAB Toolbox and Application of Genetic Algorithms"},{"key":"6","first-page":"831","article-title":"Principles of Risk Minimization for Learning Theory","author":"vapnikjv","year":"1991","journal-title":"NJPS"},{"key":"5","first-page":"228","author":"tian","year":"2001","journal-title":"Research and Application of Artificial Neural Networks"},{"key":"4","first-page":"142","article-title":"Shortest Path Routing Optimization Algorithms Based on Genetic Algorithms","volume":"31","author":"sun","year":"2005","journal-title":"Eng Comput"},{"key":"9","doi-asserted-by":"crossref","first-page":"446","DOI":"10.1061\/(ASCE)0733-9364(1995)121:4(446)","article-title":"Construction Time-cost Trade-off Analysis Using LP\/IP","volume":"121","author":"liu","year":"1995","journal-title":"Journal of Construction Engineering and Management"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(1997)11:3(184)"},{"key":"11","first-page":"77","article-title":"Time-cost Tradeoff Optimization of Construction Projects Using Genetic Algorithms","volume":"8","author":"luo","year":"2005","journal-title":"Industrial Engineering Journal"}],"event":{"name":"Third International Conference on Natural Computation (ICNC 2007)","start":{"date-parts":[[2007,8,24]]},"location":"Haikou, China","end":{"date-parts":[[2007,8,27]]}},"container-title":["Third International Conference on Natural Computation (ICNC 2007)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4344133\/4344625\/04344664.pdf?arnumber=4344664","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,18]],"date-time":"2017-06-18T07:16:24Z","timestamp":1497770184000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/4344664\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007]]},"references-count":11,"URL":"https:\/\/doi.org\/10.1109\/icnc.2007.739","relation":{},"subject":[],"published":{"date-parts":[[2007]]}}}