{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,29]],"date-time":"2024-10-29T17:22:29Z","timestamp":1730222549377,"version":"3.28.0"},"reference-count":20,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1109\/fuzz.2003.1206631","type":"proceedings-article","created":{"date-parts":[[2004,3,22]],"date-time":"2004-03-22T09:34:28Z","timestamp":1079948068000},"page":"1374-1379","source":"Crossref","is-referenced-by-count":1,"title":["Constructing a job-shop scheduling model based on imprecise data"],"prefix":"10.1109","volume":"2","author":[{"family":"Feng-Tse Lin","sequence":"first","affiliation":[]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/ROBOT.1991.131689"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/91.649907"},{"article-title":"Sequencing and Scheduling: An introduction to the Mathematics of the Job-Shop","year":"1982","author":"french","key":"ref12"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1287\/moor.1.2.117"},{"article-title":"Genetic Algorithms & Engineering Design","year":"1997","author":"gen","key":"ref14"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/0165-0114(92)90372-B"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/0165-0114(94)90210-0"},{"article-title":"Research issues and challenges in fuzzy scheduling","year":"1994","author":"kerr","key":"ref17"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/21.391290"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(92)90119-T"},{"article-title":"OR-Library","year":"0","author":"beasley","key":"ref4"},{"article-title":"Introduction to Sequencing and Scheduling","year":"1974","author":"baker","key":"ref3"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1080\/00207548208947745"},{"article-title":"Mathematical Aspects of Scheduling and Applications","year":"1982","author":"bellman","key":"ref5"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/0305-0548(93)E0015-L"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(96)00047-2"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.3.2.149"},{"key":"ref1","first-page":"391","article-title":"The shifting bottleneck procedure for job shop scheduling","volume":"34","author":"adams","year":"1987","journal-title":"International Journal of Flexible Manufacturing Systems"},{"article-title":"Computer and Job-Shop Scheduling Theory","year":"1976","author":"coffman","key":"ref9"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1287\/opre.40.1.113"}],"event":{"name":"12th International Fuzzy Systems Conference","acronym":"FUZZY-03","location":"St Louis, MO, USA"},"container-title":["The 12th IEEE International Conference on Fuzzy Systems, 2003. FUZZ '03."],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/8573\/27148\/01206631.pdf?arnumber=1206631","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,13]],"date-time":"2017-03-13T13:44:28Z","timestamp":1489412668000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/1206631\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"references-count":20,"URL":"https:\/\/doi.org\/10.1109\/fuzz.2003.1206631","relation":{},"subject":[]}}