{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,23]],"date-time":"2024-10-23T08:12:04Z","timestamp":1729671124704,"version":"3.28.0"},"reference-count":8,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,11]]},"DOI":"10.1109\/3pgcic.2014.33","type":"proceedings-article","created":{"date-parts":[[2015,2,5]],"date-time":"2015-02-05T17:30:11Z","timestamp":1423157411000},"page":"28-33","source":"Crossref","is-referenced-by-count":0,"title":["A Method to Predict the Intermittent Power by Classification Model"],"prefix":"10.1109","author":[{"given":"Hang","family":"Yang","sequence":"first","affiliation":[]},{"given":"Fuzheng","family":"Zhang","sequence":"additional","affiliation":[]},{"given":"Aidong","family":"Xu","sequence":"additional","affiliation":[]},{"given":"Cai","family":"Yuan","sequence":"additional","affiliation":[]},{"given":"Chuanlin","family":"Chen","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"3","first-page":"13","article-title":"Dynamic economic dispatch in wind power integrated system","volume":"29","author":"zhou","year":"2009","journal-title":"Proceedings of the CSEE"},{"key":"2","first-page":"1","article-title":"Review of power system load forecasting and its development","volume":"28","author":"kand","year":"2004","journal-title":"Automation of Electric Power Systems"},{"key":"1","first-page":"22","article-title":"Fuzzy modeling and optimization algorithm on dynamic economic dispatch in wind power integrated system","volume":"30","author":"chen","year":"2006","journal-title":"Automation of Electric Power Systems"},{"key":"7","first-page":"178","author":"liu","year":"2008","journal-title":"Uncertainty Planning and Applications"},{"key":"6","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/S0142-0615(02)00017-0","article-title":"Modeling and transient stability of large wind farms","volume":"25","author":"akhmatov","year":"2003","journal-title":"International Journal of Electrical Power and Energy Systems"},{"key":"5","first-page":"58","article-title":"Ding kun. Problems and consideration to the construction of large-scale wind power base","volume":"32","author":"jin","year":"2011","journal-title":"Electric Power Construction"},{"key":"4","first-page":"1","article-title":"A proposal for planning and constructing a national integrated energy base combined with large scale photovoltaic power and hydropower in qinghai province","volume":"29","author":"yan","year":"2010","journal-title":"Advanced Technology of Electrical Engineering and Energy"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1109\/ISGT.2010.5434781"}],"event":{"name":"2014 Ninth International Conference on P2P, Parallel, Grid, Cloud and Internet Computing (3PGCIC)","start":{"date-parts":[[2014,11,8]]},"location":"Guangdong, China","end":{"date-parts":[[2014,11,10]]}},"container-title":["2014 Ninth International Conference on P2P, Parallel, Grid, Cloud and Internet Computing"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7002489\/7024297\/07024554.pdf?arnumber=7024554","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,23]],"date-time":"2017-06-23T05:01:22Z","timestamp":1498194082000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7024554\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,11]]},"references-count":8,"URL":"https:\/\/doi.org\/10.1109\/3pgcic.2014.33","relation":{},"subject":[],"published":{"date-parts":[[2014,11]]}}}