{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,23]],"date-time":"2024-07-23T05:13:47Z","timestamp":1721711627595},"reference-count":37,"publisher":"EDP Sciences","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["RAIRO-Oper. Res."],"published-print":{"date-parts":[[2016,7]]},"DOI":"10.1051\/ro\/2015049","type":"journal-article","created":{"date-parts":[[2015,11,18]],"date-time":"2015-11-18T07:40:46Z","timestamp":1447832446000},"page":"587-609","source":"Crossref","is-referenced-by-count":14,"title":["Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops"],"prefix":"10.1051","volume":"50","author":[{"given":"Mohammad","family":"Rohaninejad","sequence":"first","affiliation":[]},{"given":"Rashed","family":"Sahraeian","sequence":"additional","affiliation":[]},{"given":"Behdin Vahedi","family":"Nouri","sequence":"additional","affiliation":[]}],"member":"250","published-online":{"date-parts":[[2016,7,20]]},"reference":[{"key":"R1","unstructured":"Absi N. and Kedad-Sidhoum S., MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs.RAIRO: OR41(2007) 171\u2013192."},{"key":"R2","doi-asserted-by":"crossref","unstructured":"Akrami B., Karimi B. and Hosseini Moattar S.M., Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: The finite horizon case.Appl. Math. Comput.183(2006) 634\u2013645.","DOI":"10.1016\/j.amc.2006.05.106"},{"key":"R3","unstructured":"Arabameri S. and Salmasi N., Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem.Comput. Ind. Eng.64(2013) 902\u2013916."},{"key":"R4","unstructured":"Beraldi P., Ghiani G., Grieco A. and Guerriero E., Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs.Comput. Oper. Res.35(2008) 3644\u20133656."},{"key":"R5","doi-asserted-by":"crossref","unstructured":"K. Deb, Multi-objective Optimization Using Evolutionary Algorithms. Vol. 2012. John Wiley & Sons, Chichester (2001).","DOI":"10.1007\/978-0-85729-652-8_1"},{"key":"R6","doi-asserted-by":"crossref","unstructured":"Deb K., Pratap A., Agarwal S. and Meyarivan T.A.M.T., A fast and elitist multi-objective genetic algorithm: NSGA-II.IEEE Trans. Evol. Comput.6(2002) 182\u2013197.","DOI":"10.1109\/4235.996017"},{"key":"R7","unstructured":"Deleplanque S., Kedad-Sidhoum S. and Quilliot A., Lagrangean Heuristic for a Multi\u2013Plant Lot\u2013Sizing Problem with Transfer and Storage Capacities.RAIRO: OR47(2013) 429\u2013443."},{"key":"R8","unstructured":"Dye C.Y. and Ouyang L.Y., A particle swarm optimization for solving joint pricing and lot-sizing problem with fluctuating demand and trade credit financing.Comput. Ind. Eng.60(2011) 127\u2013137."},{"key":"R9","doi-asserted-by":"crossref","unstructured":"Fandel G. and Stammen\u2013Hegene C., Simultaneous lot sizing and scheduling for multi-product multi-level production.Int. J. Prod. Econ.104(2006) 308\u2013316.","DOI":"10.1016\/j.ijpe.2005.04.011"},{"key":"R10","doi-asserted-by":"crossref","unstructured":"G\u00f3mez Urrutia E.D., Aggoune R. and Dauz\u00e8re-P\u00e9r\u00e8s S., Solving the integrated lot-sizing and job-shop scheduling problem.Int. J. Prod. Res.52(2014) 5236\u20135254.","DOI":"10.1080\/00207543.2014.902156"},{"key":"R11","doi-asserted-by":"crossref","unstructured":"Haase K. and Kimms A., Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities.Int. J. Prod. Econ.66(2000) 159\u2013169.","DOI":"10.1016\/S0925-5273(99)00119-X"},{"key":"R12","unstructured":"Han Y., Tang J., Kaku I. and Mu L., Solving uncapacitated multilevel lot-sizing problems using a particle swarm optimization with flexible inertial weight.Comput. Math. Appl.57(2009) 1748\u20131755."},{"key":"R13","doi-asserted-by":"crossref","unstructured":"C.L. Hwang and K. Yoon, Multiple Attributes Decision Making.Lect. Notes Econ. Math. Syst.Springer, Heidelberg (1981).","DOI":"10.1007\/978-3-642-48318-9"},{"key":"R14","unstructured":"Jenabi M., FatemiGhomi S.M.T., Torabi S.A. and Karimi B., Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines.Appl. Math. Comput.186(2007) 230\u2013245."},{"key":"R15","doi-asserted-by":"crossref","unstructured":"Kaczmarczyk W., Proportional lot-sizing and scheduling problem with identical parallel machines.Int. J. Prod. Res.49(2011) 2605\u20132623.","DOI":"10.1080\/00207543.2010.532929"},{"key":"R16","unstructured":"Karimi B., Fatemi Ghomi S.M.T. and Wilson J.M., The capacitated lot sizing problem: a review of models and algorithms.Omega31(2003) 365\u2013378."},{"key":"R17","doi-asserted-by":"crossref","unstructured":"Karimi-Nasab M., Seyedhoseini S.M., Modarres M. and Heidari M., Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures.Int. J. Prod. Res.51(2013) 6229\u20136246.","DOI":"10.1080\/00207543.2013.825743"},{"key":"R18","unstructured":"Karmarkar U.S. and Schrage L., The deterministic dynamic product cycling problem.Oper. Res.33(1985) 326\u2013345."},{"key":"R19","unstructured":"Kashan A.H. and Karimi B., A discrete particle swarm optimization algorithm for scheduling parallel machines.Comput. Ind. Eng.56(2009) 216\u2013223."},{"key":"R20","doi-asserted-by":"crossref","unstructured":"Kov\u00e1cs A., Brown K.N. and Tarim S.A., An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups.Int. J. Prod. Econ.118(2009) 282\u2013291.","DOI":"10.1016\/j.ijpe.2008.08.033"},{"key":"R21","doi-asserted-by":"crossref","unstructured":"Maes J., McClain J.O. and Van Wassenhove L.N., Multilevel capacitated lot-sizing complexity and LP-based heuristics.Eur. J. Oper. Res.53(1991) 131\u2013148.","DOI":"10.1016\/0377-2217(91)90130-N"},{"key":"R22","unstructured":"Mahdieh M., Bijari M. and Clark A., Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line.J. Ind. Syst. Eng.5(2011) 107\u2013119."},{"key":"R23","unstructured":"Ozt\u00fcrk C. and Ornek A.M., Capacitated lot sizing with linked lots for general product structures in job shops.Comput. Ind. Eng.58(2010) 151\u2013164."},{"key":"R24","unstructured":"Petrovic S., Fayad C., Petrovic D., Burke E. and Kendall G., Fuzzy job shop scheduling with lot-sizing.Ann. Oper. Res.159(2008) 275\u2013292."},{"key":"R25","unstructured":"Ramezanian R. and Saidi-Mehrabad M., Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system.Appl. Math. Model.37(2013) 5134\u20135147."},{"key":"R26","doi-asserted-by":"crossref","unstructured":"Ramezanian R., Saidi-Mehrabad M. and Fattahi P., MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints.J. Manufact. Syst.32(2013) 392\u2013401.","DOI":"10.1016\/j.jmsy.2013.01.002"},{"key":"R27","doi-asserted-by":"crossref","unstructured":"Ramezanian R., Saidi-Mehrabad M. and Fattahi P., Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system.Int. J. Comput. Integr. Manufact.26(2013) 681\u2013695.","DOI":"10.1080\/0951192X.2012.749534"},{"key":"R28","doi-asserted-by":"crossref","unstructured":"M. Rohaninejad, A. Kheirkhah, P. Fattahi and B. Vahedi-Nouri, A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem.Int. J. Adv. Manufact. Technol.(2014) 1\u201316.","DOI":"10.1007\/s00170-014-6415-1"},{"key":"R29","doi-asserted-by":"crossref","unstructured":"Rohaninejad M., Kheirkhah A.S., Vahedi Nouri B. and Fattahi P., Two hybrid tabu search\u2013firefly algorithms for the capacitated job shop scheduling problem with sequence-dependent setup cost.Int. J. Comput. Integr. Manufact.28(2015) 470\u2013487.","DOI":"10.1080\/0951192X.2014.880808"},{"key":"R30","unstructured":"J.D. Schaffer, Multiple objective optimization with vector evaluated genetic algorithms. InProc. of the 1st international Conference on Genetic Algorithms. L. Erlbaum Associates Inc. (1985) 93\u2013100."},{"key":"R31","unstructured":"Seeanner F., Almada-Lobo B. and Meyr H., Combining the principles of variable neighborhood decomposition search and the fix & optimize heuristic to solve multi-level lot-sizing and scheduling problems.Comput. Oper. Res.40(2013) 303\u2013317."},{"key":"R32","unstructured":"Sikora R., A genetic algorithm for integrating lot-sizing and sequencing in scheduling a capacitated flow line.Comput. Ind. Eng.30(1996) 969\u2013981."},{"key":"R33","doi-asserted-by":"crossref","unstructured":"Stadtler H., Multi-level single machine lot-sizing and scheduling with zero lead times.Eur. J. Oper. Res.,209(2011) 241\u2013252.","DOI":"10.1016\/j.ejor.2010.09.022"},{"key":"R34","doi-asserted-by":"crossref","unstructured":"Weidenhiller A. and Jodlbauer H., Equivalence classes of problem instances for a continuous-time lot sizing and scheduling problem.Eur. J. Oper. Res.199(2009) 139\u2013149.","DOI":"10.1016\/j.ejor.2008.11.006"},{"key":"R35","unstructured":"C.J. Wu and M.S. Hamada, Experiments: Planning, Analysis, and Optimization. Wiley (2011)."},{"key":"R36","doi-asserted-by":"crossref","unstructured":"Zhao F., Tang J., Wang J. and Jonrinaldi J., An improved particle swarm optimisation with a linearly decreasing disturbance term for flow shop scheduling with limited buffers.Int. J. Comput. Integr. Manufact.27(2014) 488\u2013499.","DOI":"10.1080\/0951192X.2013.814165"},{"key":"R37","unstructured":"E. Zitzler, M. Laumanns and L. Theile,SPEA2: Improving the strength Pareto evolutionary algorithm. Technical Report (2001)."}],"container-title":["RAIRO - Operations Research"],"original-title":[],"link":[{"URL":"http:\/\/www.rairo-ro.org\/10.1051\/ro\/2015049\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,26]],"date-time":"2022-05-26T12:37:46Z","timestamp":1653568666000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.rairo-ro.org\/10.1051\/ro\/2015049"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,7]]},"references-count":37,"journal-issue":{"issue":"3"},"alternative-id":["ro151061"],"URL":"https:\/\/doi.org\/10.1051\/ro\/2015049","relation":{},"ISSN":["0399-0559","1290-3868"],"issn-type":[{"value":"0399-0559","type":"print"},{"value":"1290-3868","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,7]]}}}