{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,4,16]],"date-time":"2025-04-16T05:56:24Z","timestamp":1744782984041},"reference-count":54,"publisher":"Elsevier","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2003]]},"DOI":"10.1016\/s0927-0507(03)11005-5","type":"book-chapter","created":{"date-parts":[[2005,4,18]],"date-time":"2005-04-18T19:58:53Z","timestamp":1113854333000},"page":"199-226","source":"Crossref","is-referenced-by-count":58,"title":["Design for Postponement"],"prefix":"10.1016","author":[{"given":"Jayashankar M.","family":"Swaminathan","sequence":"first","affiliation":[]},{"given":"Hau L.","family":"Lee","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0927-0507(03)11005-5_BIB1","unstructured":"Alderson, W., Marketing Efficiency and the Principle of Postponement, Cost and Profit Outlook, September 1950"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB2","unstructured":"Anand, K., ]H. Mendelson, Postponement and Information in a Supply Chain, Technical Report, Northwestern University, July 1998"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB3","series-title":"Quantitative Models for Supply Chain Management","first-page":"553","article-title":"The Benefits of Design for Postponement","author":"Aviv","year":"1999"},{"issue":"8","key":"10.1016\/S0927-0507(03)11005-5_BIB4","doi-asserted-by":"crossref","first-page":"982","DOI":"10.1287\/mnsc.32.8.982","article-title":"The Effect of Commonality on Safety Stock in a Simple Inventory Model","volume":"32","author":"Baker","year":"1986","journal-title":"Management Science"},{"issue":"4","key":"10.1016\/S0927-0507(03)11005-5_BIB5","doi-asserted-by":"crossref","first-page":"632","DOI":"10.1287\/opre.47.4.632","article-title":"Single Period Multiproduct Inventory Model with Substitution","volume":"47","author":"Bassok","year":"1999","journal-title":"Operations Research"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB6","unstructured":"Benjafer, S., D. Gupta, Make-to-Order, Make-to-Stock or Delay Product Differentiation? \u2013 A Common Framework for Modeling and Analysis, Working Paper, Department of Mechanical Engineering, University of Minnesota, Minneapolis, MN, 2000"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB7","doi-asserted-by":"crossref","unstructured":"Brown, A.O., H.L. Lee, R. Petrakian, Xilinx Improves its Semiconductor Supply Chain using Product and Process Postponement, Interfaces, 30(4), July\u2013August 2000, 65\u201380","DOI":"10.1287\/inte.30.4.65.11650"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB8","doi-asserted-by":"crossref","first-page":"26","DOI":"10.2307\/3149333","article-title":"Postponement, Speculation and the Structure of the Distribution Channel","volume":"2","author":"Bucklin","year":"1965","journal-title":"Journal of Marketing Research"},{"issue":"11","key":"10.1016\/S0927-0507(03)11005-5_BIB9","doi-asserted-by":"crossref","first-page":"1296","DOI":"10.1287\/mnsc.28.11.1296","article-title":"Aggregate Safety Stocks and Component Part Commonality","volume":"28","author":"Collier","year":"1982","journal-title":"Management Science"},{"issue":"6","key":"10.1016\/S0927-0507(03)11005-5_BIB10","doi-asserted-by":"crossref","first-page":"7","DOI":"10.1108\/EUM0000000000416","article-title":"Benetton \u2013 Global Logistics in Action","volume":"22","author":"Dapiran","year":"1992","journal-title":"International Journal of Physical Distribution and Logistics Management"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB11","unstructured":"Eppen, G., L. Schrage, Centralized Ordering Policies in a Multi-Warehouse System with Lead Times and Random Demand, Multi-Level Production Inventory Control Systems: Theory and Practice (ed. L.B. Schwartz), North Holland, Amsterdam, 1981, 51\u201358"},{"issue":"3","key":"10.1016\/S0927-0507(03)11005-5_BIB12","doi-asserted-by":"crossref","first-page":"381","DOI":"10.1287\/mnsc.36.3.381","article-title":"Optimal centralized ordering policies in multi-echelon inventory systems with correlated demands","volume":"36","author":"Erkip","year":"1990","journal-title":"Management Science"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB13","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1080\/07408179608966255","article-title":"Component Commonality Effects on Inventory Costs","volume":"28","author":"Eynan","year":"1996","journal-title":"IIE Transactions"},{"issue":"1","key":"10.1016\/S0927-0507(03)11005-5_BIB14","first-page":"116","article-title":"Mass Customization at Hewlett-Packard: the Power of Postponement","volume":"75","author":"Feitzinger","year":"1997","journal-title":"Harvard Business Review"},{"issue":"3","key":"10.1016\/S0927-0507(03)11005-5_BIB15","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1287\/mnsc.45.3.297","article-title":"Component Sharing in the Management of Product Variety: A Study of the Automotive Braking System","volume":"45","author":"Fisher","year":"1999","journal-title":"Management Science"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB16","unstructured":"Fraiman, N., M. Singh, \u201cZara,\u201d Columbia Business School Case, 2002"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB17","doi-asserted-by":"crossref","first-page":"417","DOI":"10.1080\/07408179908969845","article-title":"An Application of Designing Products and Processes for Supply Chain Management","volume":"31","author":"Garg","year":"1999","journal-title":"IIE Transactions"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB18","unstructured":"Garg, A., H.L. Lee, Effecting Postponement through Standardization and Process Sequencing, IBM Research Report RC 20726, IBM T.J. Watson Research Center, Yorktown Heights, NY, 1996"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB19","series-title":"Quantitative Models for Supply Chain Management","first-page":"467","article-title":"Managing Product Variety: An Operational Perspective","author":"Garg","year":"1998"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB20","doi-asserted-by":"crossref","first-page":"641","DOI":"10.1080\/07408179708966374","article-title":"On Postponement Strategies for Product Families with Multiple Points of Differentiation","volume":"29","author":"Garg","year":"1997","journal-title":"IIE Transactions"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB21","unstructured":"Gavirneni S., S. Tayur, Delayed Product Differentiation and Information Sharing, Working Paper, GSIA, Carnegie Mellon University, 1999"},{"issue":"3","key":"10.1016\/S0927-0507(03)11005-5_BIB22","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1016\/0167-6377(86)90089-1","article-title":"An Inventory Model with Component Commonality","volume":"5","author":"Gerchak","year":"1986","journal-title":"Operations Research Letters"},{"issue":"6","key":"10.1016\/S0927-0507(03)11005-5_BIB23","doi-asserted-by":"crossref","first-page":"753","DOI":"10.1287\/mnsc.34.6.753","article-title":"Component Commonality with Service Level Requirements","volume":"34","author":"Gerchak","year":"1988","journal-title":"Management Science"},{"issue":"3","key":"10.1016\/S0927-0507(03)11005-5_BIB24","doi-asserted-by":"crossref","first-page":"340","DOI":"10.1111\/j.1937-5956.2002.tb00190.x","article-title":"A Numerical Analysis of Capacitated Postponement","volume":"11","author":"Graman","year":"2002","journal-title":"Production and Operations Management"},{"issue":"10","key":"10.1016\/S0927-0507(03)11005-5_BIB25","doi-asserted-by":"crossref","first-page":"933","DOI":"10.1080\/07408179808966547","article-title":"Product Family Based Assembly Design Sequencing Methodology","volume":"30","author":"Gupta","year":"1998","journal-title":"IIE Transactions"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB26","unstructured":"Harle N., M. Pich, L. Van der Hayden, Mark & Spencer and Zara: Process Competition in the Textile Apparel Industry, INSEAD case, 2001"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB27","unstructured":"Hoyt D. and E. Lopez-Tello, Lucent Technologies \u2013 Provisioning and Postponement, Stanford University Case No. GS-02, 2001"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB28","doi-asserted-by":"crossref","first-page":"284","DOI":"10.1287\/mnsc.15.5.284","article-title":"Optimality of Myopic Inventory Policies for Several Substitute Products","volume":"15","author":"Ignall","year":"1969","journal-title":"Management Science"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB29","doi-asserted-by":"crossref","first-page":"579","DOI":"10.1287\/mnsc.41.4.577","article-title":"Principles on the Benefits of Manufacturing Process Flexibility","volume":"41","author":"Jordan","year":"1995","journal-title":"Management Science"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB30","doi-asserted-by":"crossref","unstructured":"Kapuscinski R., S. Tayur, Variance vs. Standard Deviation: Variability Reduction through Operations, Management Science, 45(5), 765\u2013767","DOI":"10.1287\/mnsc.45.5.765"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB31","series-title":"Perspectives in Operations Management","article-title":"Design for Supply Chain Management: Concepts and Examples","author":"Lee","year":"1993"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB32","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1287\/opre.44.1.151","article-title":"Effective Management of Inventory and Service Through Product and Process Redesign","volume":"44","author":"Lee","year":"1996","journal-title":"Operations Research"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB33","unstructured":"Lee H.L., \u201cHewlett-Packard Company: Network Printer Design for Universality,\u201d Stanford University Case, 1997"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB34","series-title":"Strategic Supply Chain Alignment","first-page":"77","article-title":"Postponement for Mass Customization: Satisfying Customer Demands for Tailor-made Products","author":"Lee","year":"1998"},{"issue":"4","key":"10.1016\/S0927-0507(03)11005-5_BIB35","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/inte.23.4.1","article-title":"Hewlett Packard Gains Control of Inventory and Service through Design for Localization","volume":"23","author":"Lee","year":"1993","journal-title":"Interfaces"},{"issue":"2","key":"10.1016\/S0927-0507(03)11005-5_BIB36","first-page":"8","article-title":"Getting Ahead of Your Competition Through Design for Mass Customization","volume":"13","author":"Lee","year":"1997","journal-title":"Target"},{"issue":"3","key":"10.1016\/S0927-0507(03)11005-5_BIB37","doi-asserted-by":"crossref","first-page":"270","DOI":"10.1080\/09537289508930279","article-title":"Product Universality and Design for Supply Chain Management","volume":"6","author":"Lee","year":"1995","journal-title":"Production Planning and Control: Special Issue on Supply Chain Management"},{"issue":"1","key":"10.1016\/S0927-0507(03)11005-5_BIB38","doi-asserted-by":"crossref","first-page":"40","DOI":"10.1287\/mnsc.43.1.40","article-title":"Modeling the Costs and Benefits of Delayed Product Differentiation","volume":"43","author":"Lee","year":"1997","journal-title":"Management Science"},{"issue":"2","key":"10.1016\/S0927-0507(03)11005-5_BIB39","doi-asserted-by":"crossref","first-page":"162","DOI":"10.1287\/mnsc.44.2.162","article-title":"Variability Reduction through Operations Reversal","volume":"44","author":"Lee","year":"1998","journal-title":"Management Science"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB40","series-title":"Product Variety Management: Research Advances","first-page":"66","article-title":"Value of Postponement from Variability Reduction Through Uncertainty Resolution and Forecast Improvement","author":"Lee","year":"1998"},{"issue":"11","key":"10.1016\/S0927-0507(03)11005-5_BIB41","doi-asserted-by":"crossref","first-page":"1496","DOI":"10.1287\/mnsc.45.11.1496","article-title":"On the Relationship between Inventory Costs and Variety Benefits in Retail Assortments","volume":"45","author":"Mahajan","year":"1999","journal-title":"Management Science"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB42","doi-asserted-by":"crossref","unstructured":"Martin M., W. Hausman, K. Ishii, Design for Variety, Product Variety Management: Research Advances (ed. T. Ho and C. Tang), Kluwer Academic Publishers, 1998, 103\u2013122","DOI":"10.1007\/978-1-4615-5579-7_6"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB43","series-title":"Concurrent Design of Products and Processes: A Strategy for the Next Generation in Manufacturing","author":"Nevins","year":"1989"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB44","unstructured":"Rao U.S., J.M. Swaminathan, J. Zhang, A Multi-Product Inventory Problem with Set-up Costs and Downward Substitution, 2002, to appear, IIE Transactions"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB45","unstructured":"Swaminathan J.M., Optimizing Commonality for Postponement, Working Paper, University of California, Berkeley, 1999"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB46","doi-asserted-by":"crossref","unstructured":"Swaminathan J.M., Enabling Customization using Standardized Operations, California Management Review, 43(3), Spring 2001, 125\u2013135","DOI":"10.2307\/41166092"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB47","unstructured":"Swaminathan J.M., S. Kukukyavuz, A Perishable Inventory Problem with Postponement and Substitution, Working Paper, University of California, Berkeley, 2000"},{"issue":"12.2","key":"10.1016\/S0927-0507(03)11005-5_BIB48","doi-asserted-by":"crossref","first-page":"S161","DOI":"10.1287\/mnsc.44.12.S161","article-title":"Managing Broader Product Lines through Delayed Differentiation using Vanilla Boxes","volume":"44","author":"Swaminathan","year":"1998","journal-title":"Management Science"},{"issue":"4","key":"10.1016\/S0927-0507(03)11005-5_BIB49","first-page":"1015","article-title":"Managing Design of Assembly Sequences for Product Lines that Delay Product Differentiation","volume":"31","author":"Swaminathan","year":"1998","journal-title":"IIE Transactions"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB50","series-title":"Quantitative Models for Supply Chain Management","first-page":"485","article-title":"Stochastic Programming Models for Managing Product Variety","author":"Swaminathan","year":"1999"},{"issue":"1","key":"10.1016\/S0927-0507(03)11005-5_BIB51","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/opre.48.1.1.12445","article-title":"Optimal Commonality in Component Design","volume":"48","author":"Thonemann","year":"2000","journal-title":"Operations Research"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB52","unstructured":"Van Mieghem J., Component Commonality Strategies: Value Drivers and Equivalence with Flexible Capacity Strategies, Working Paper, Kellogg School of Management, Northwestern University, 2002"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB53","doi-asserted-by":"crossref","unstructured":"Van Mieghem J., M. Dada, Price versus Product Postponement: Capacity and Competition, Management Science, 45(12), 1631\u20131649","DOI":"10.1287\/mnsc.45.12.1631"},{"key":"10.1016\/S0927-0507(03)11005-5_BIB54","doi-asserted-by":"crossref","unstructured":"Zinn W., D.J. Bowersox, Planning Physical Distribution with the Principle of Postponement, Journal of Business Logistics, 9, 1988, 117\u2013136. Optimal centralized ordering policies in multi-echelon inventory systems with correlated demands, Management Science, 36(3), 1990, 381\u2013392","DOI":"10.1287\/mnsc.36.3.381"}],"container-title":["Handbooks in Operations Research and Management Science","Supply Chain Management: Design, Coordination and Operation"],"original-title":[],"deposited":{"date-parts":[[2020,4,6]],"date-time":"2020-04-06T23:52:15Z","timestamp":1586217135000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0927050703110055"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003]]},"references-count":54,"URL":"https:\/\/doi.org\/10.1016\/s0927-0507(03)11005-5","relation":{},"ISSN":["0927-0507"],"issn-type":[{"value":"0927-0507","type":"print"}],"subject":[],"published":{"date-parts":[[2003]]}}}