{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,16]],"date-time":"2024-09-16T05:11:56Z","timestamp":1726463516475},"reference-count":26,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2000,7,1]],"date-time":"2000-07-01T00:00:00Z","timestamp":962409600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2000,7]]},"DOI":"10.1016\/s0377-2217(99)00380-x","type":"journal-article","created":{"date-parts":[[2002,7,26]],"date-time":"2002-07-26T02:34:39Z","timestamp":1027650879000},"page":"267-282","source":"Crossref","is-referenced-by-count":256,"title":["A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex"],"prefix":"10.1016","volume":"124","author":[{"given":"Lixin","family":"Tang","sequence":"first","affiliation":[]},{"given":"Jiyin","family":"Liu","sequence":"additional","affiliation":[]},{"given":"Aiying","family":"Rong","sequence":"additional","affiliation":[]},{"given":"Zihou","family":"Yang","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(99)00380-X_BIB1","series-title":"Global Steel in the 1990s: Growth or Decline","author":"Hogan","year":"1991"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB2","series-title":"Steel in the 21st Century: Competition Forges a New World Order","author":"Hogan","year":"1994"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB3","unstructured":"State Statistical Bureau, People\u2019s Republic of China, China Statistical Yearbook, China Statistical Publishing House, Beijing, 1998"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB4","doi-asserted-by":"crossref","first-page":"305","DOI":"10.1007\/BF00932613","article-title":"A mixed integer programming model for scheduling order in steel mill","volume":"14","author":"Redwine","year":"1974","journal-title":"Journal of Optimization Theory and Applications"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB5","doi-asserted-by":"crossref","unstructured":"J.R. Wright, M.H. Houck, L.L. Archibald, The application of system engineering to hot mill production scheduling, Report to Bethlehem Steel Corporation, 1984","DOI":"10.1007\/978-3-662-21877-8_75"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB6","doi-asserted-by":"crossref","first-page":"497","DOI":"10.1016\/0305-0548(88)90046-9","article-title":"Optimal inter-process steel production scheduling","volume":"15","author":"Jacobs","year":"1988","journal-title":"Computers and Operational Research"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB7","unstructured":"E. Balas, C. Martin, Combinatorial optimization in steel rolling, in: The DIMACS\/RUTCOR Workshop on Combinatorial Optimization in Science and Technology, Rutgers University, New Brunswick, NJ, 1991"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB8","doi-asserted-by":"crossref","first-page":"1415","DOI":"10.1080\/00207549208942964","article-title":"Inter-process synchronization in steel production","volume":"30","author":"Peterson","year":"1992","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB9","doi-asserted-by":"crossref","first-page":"317","DOI":"10.1016\/0166-3615(92)90069-Y","article-title":"Discrete event sequencing as a traveling salesman problem","volume":"19","author":"Kosiba","year":"1992","journal-title":"Computers in Industry"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB10","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1080\/002075497195858","article-title":"Steel production schedule generation","volume":"35","author":"Assaf","year":"1997","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB11","doi-asserted-by":"crossref","first-page":"539","DOI":"10.1080\/00207547708943148","article-title":"Development of integrated production scheduling system for iron and steel works","volume":"15","author":"Sato","year":"1977","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB12","first-page":"47","article-title":"Expert system for scheduling rolling sequence in plate mill","volume":"10","author":"Arizono","year":"1991","journal-title":"Kobelco Technology Review"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB13","doi-asserted-by":"crossref","unstructured":"O. Lassila, P. Mattila, L. Pesonen, M. Syrjanen, S. Torma, S.-L. Jamsa-Jounela, A.J. Niemi, Applying knowledge-based techniques to the scheduling of steel rolling, in: Proceedings of the IFAC Workshop in Expert Systems in Mineral and Metal Processing, Espoo, Finland, 1992","DOI":"10.1016\/B978-0-08-041704-2.50024-8"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB14","unstructured":"M.S. Fox, Constraint directed search: A case study in job shop scheduling, Ph.D. thesis, Carnegie Mellon University, Computer Science Department, Pittsburgh, USA, 1983"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB15","unstructured":"R. Bisdorff, A. Gabriel, Industrial linear optimization problems solved by constraint logic programming, in: The First International Conference on the Practical Application of Prolog, London, 1992, pp. 1\u201315"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB16","unstructured":"S.Y. Chang, Y.S. Hong, C.Y. Jun, Constraint satisfaction approach to scheduling DHCR process, in: International Conference on Computerized Production Control in Steel Plant, Korea, 1993, pp. 464\u2013470"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB17","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1016\/S0167-9236(97)00052-3","article-title":"Evaluation ordering strategies for constraint satisfaction reactive scheduling","volume":"22","author":"Suh","year":"1998","journal-title":"Decision Support Systems"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB18","unstructured":"K.R. Ryu, The advanced production and product scheduling control system at the Kwangyang works, in: Proceedings of Intentional Conference on Computerized Production Control in Steel Plant, Korea, 1993, pp. 299\u2013308"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB19","unstructured":"G.X. Jin, F.X. Sun, S.B. Bai, Production Management in Baoshan Iron & Steel Complex, Publishing House of Metallurgical Industry, Beijing, 1994, pp. 104\u2013130"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB20","doi-asserted-by":"crossref","first-page":"717","DOI":"10.1057\/jors.1975.151","article-title":"Some simple applications of the traveling salesman problem","volume":"26","author":"Lenstra","year":"1975","journal-title":"Operational Research Quarterly"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB21","doi-asserted-by":"crossref","first-page":"293","DOI":"10.1287\/opre.2.4.393","article-title":"Solution of a large-scale traveling-salesman problem","volume":"2","author":"Dantzig","year":"1954","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB22","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/0377-2217(92)90138-Y","article-title":"The traveling salesman problem: An overview of exact and approximate algorithms","volume":"59","author":"Laporte","year":"1992","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB23","series-title":"Genetic Algorithms in Search Optimization and Machine Learning","author":"Goldberg","year":"1989"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB24","unstructured":"J.J. Grefenstette, R. Gopal, B. Rosmaita, D. Van Gucht, Genetic algorithm for TSP, in: J.J. Grefenstette (Ed.), Proceedings of the First International Conference on Genetic Algorithms and Their Applications, Carnegie-Mellon University, Pittsburgh, PA, 1985, pp. 160\u2013168"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB25","unstructured":"D.E. Goldberg, Alleles, loci and the traveling salesman problem, in: J.J. Grefenstette (Ed.), Proceedings of the First International Conference on Genetic Algorithms and Their Applications, Carnegie-Mellon University, Pittsburgh, PA, 1985, pp. 154\u2013159"},{"key":"10.1016\/S0377-2217(99)00380-X_BIB26","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1016\/0377-2217(82)90015-7","article-title":"A branch and bound algorithm for the symmetric traveling salesman problem based on the 1-tree relaxation","volume":"9","author":"Volgenant","year":"1982","journal-title":"European Journal of Operational Research"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S037722179900380X?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S037722179900380X?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2020,2,5]],"date-time":"2020-02-05T03:36:11Z","timestamp":1580873771000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S037722179900380X"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2000,7]]},"references-count":26,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2000,7]]}},"alternative-id":["S037722179900380X"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(99)00380-x","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2000,7]]}}}