{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,10]],"date-time":"2024-07-10T23:13:38Z","timestamp":1720653218863},"reference-count":37,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2017,5,1]],"date-time":"2017-05-01T00:00:00Z","timestamp":1493596800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Robotics and Autonomous Systems"],"published-print":{"date-parts":[[2017,5]]},"DOI":"10.1016\/j.robot.2017.01.009","type":"journal-article","created":{"date-parts":[[2017,1,30]],"date-time":"2017-01-30T14:31:36Z","timestamp":1485786696000},"page":"210-225","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":22,"special_numbering":"C","title":["Scheduling of two-machine robotic rework cells: In-process, post-process and in-line inspection scenarios"],"prefix":"10.1016","volume":"91","author":[{"given":"Mehdi","family":"Foumani","sequence":"first","affiliation":[]},{"given":"Kate","family":"Smith-Miles","sequence":"additional","affiliation":[]},{"given":"Indra","family":"Gunawan","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.robot.2017.01.009_b1","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1007\/s10845-007-0042-8","article-title":"A clustering approach for minimizing intercell trips in cell formation","volume":"19","author":"Wei","year":"2008","journal-title":"J. Intell. Manuf."},{"key":"10.1016\/j.robot.2017.01.009_b2","doi-asserted-by":"crossref","first-page":"2480","DOI":"10.1016\/j.dam.2008.03.021","article-title":"Identical part production in cyclic robotic cells: concepts, overview and open questions","volume":"156","author":"Brauner","year":"2008","journal-title":"Discrete Appl. Math."},{"key":"10.1016\/j.robot.2017.01.009_b3","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1016\/j.cor.2007.10.003","article-title":"Scheduling of coupled tasks and one-machine no-wait robotic cells","volume":"36","author":"Brauner","year":"2009","journal-title":"Comput. Oper. Res."},{"key":"10.1016\/j.robot.2017.01.009_b4","doi-asserted-by":"crossref","first-page":"1850","DOI":"10.1016\/j.cor.2011.06.002","article-title":"Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines","volume":"39","author":"Zhou","year":"2012","journal-title":"Comput. Oper. Res."},{"key":"10.1016\/j.robot.2017.01.009_b5","doi-asserted-by":"crossref","first-page":"700","DOI":"10.1016\/j.jmsy.2013.09.005","article-title":"A new optimization approach for nozzle selection and component allocation in multi-head beam-type fSMDg placement machines","volume":"32","author":"Torabi","year":"2013","journal-title":"J. Manuf. Syst."},{"key":"10.1016\/j.robot.2017.01.009_b6","doi-asserted-by":"crossref","first-page":"506","DOI":"10.1016\/j.robot.2013.12.007","article-title":"Rescheduling policies for large-scale task allocation of autonomous straddle carriers under uncertainty at automated container terminals","volume":"62","author":"Cai","year":"2014","journal-title":"Robot. Auton. Syst."},{"key":"10.1016\/j.robot.2017.01.009_b7","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/S0925-5273(98)00120-0","article-title":"Cost and performance analysis of a robotic rework cell","volume":"58","author":"Geren","year":"1999","journal-title":"Int. J. Prod. Econ."},{"key":"10.1016\/j.robot.2017.01.009_b8","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1016\/S0377-2217(99)00258-1","article-title":"Scheduling no-wait robotic cells with two and three machines","volume":"123","author":"Agnetis","year":"2000","journal-title":"Eur. J. Oper. Res."},{"key":"10.1016\/j.robot.2017.01.009_b9","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1007\/s10951-005-2861-9","article-title":"Sequencing and scheduling in robotic cells: recent developments","volume":"8","author":"Dawande","year":"2005","journal-title":"J. Sched."},{"key":"10.1016\/j.robot.2017.01.009_b10","doi-asserted-by":"crossref","first-page":"1420","DOI":"10.1016\/j.cor.2012.09.006","article-title":"Two-machine robotic cell scheduling problem with sequence-dependent setup times","volume":"40","author":"Zarandi","year":"2013","journal-title":"Comput. Oper. Res."},{"key":"10.1016\/j.robot.2017.01.009_b11","doi-asserted-by":"crossref","first-page":"921","DOI":"10.1007\/s00170-015-7073-7","article-title":"Precise alignment method of the large-scale crankshaft during non-circular grinding","volume":"80","author":"Shen","year":"2015","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"10.1016\/j.robot.2017.01.009_b12","doi-asserted-by":"crossref","first-page":"821","DOI":"10.1109\/TII.2014.2371334","article-title":"Notes on feasibility and optimality conditions of small-scale multi-function robotic cell scheduling problems with pick up restrictions","volume":"11","author":"Foumani","year":"2015","journal-title":"IEEE Trans. Indust. Inform."},{"key":"10.1016\/j.robot.2017.01.009_b13","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/j.procir.2014.03.186","article-title":"Design and evaluation of in-line product repair strategies for defect reduction in the production of electric drives","volume":"21","author":"Colledani","year":"2014","journal-title":"Procedia CIRP"},{"key":"10.1016\/j.robot.2017.01.009_b14","doi-asserted-by":"crossref","first-page":"808","DOI":"10.1016\/j.protcy.2014.09.054","article-title":"In-line inspection of roundness using machine vision","volume":"15","author":"Ayub","year":"2014","journal-title":"Procedia Technol."},{"key":"10.1016\/j.robot.2017.01.009_b15","doi-asserted-by":"crossref","first-page":"1551","DOI":"10.1016\/j.ress.2007.06.002","article-title":"Modeling of machine failures in a flexible manufacturing cell with two machines served by a robot","volume":"120","author":"Savsar","year":"2008","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"10.1016\/j.robot.2017.01.009_b16","doi-asserted-by":"crossref","first-page":"3910","DOI":"10.1016\/j.eswa.2009.11.026","article-title":"Modeling a flexible manufacturing cell using stochastic petri nets with fuzzy parameters","volume":"37","author":"Tuysuz","year":"2010","journal-title":"Expert Syst. Appl."},{"key":"10.1016\/j.robot.2017.01.009_b17","doi-asserted-by":"crossref","first-page":"600","DOI":"10.1016\/j.cie.2005.09.002","article-title":"A stochastic model for the analysis of a two-machine flexible manufacturing cell","volume":"49","author":"Aldaihani","year":"2005","journal-title":"Comput. Ind. Eng."},{"key":"10.1016\/j.robot.2017.01.009_b18","doi-asserted-by":"crossref","first-page":"6651","DOI":"10.1080\/00207540802372298","article-title":"Productivity analysis in a robotic cell","volume":"47","author":"Monfared","year":"2009","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.robot.2017.01.009_b19","doi-asserted-by":"crossref","first-page":"897","DOI":"10.1080\/0740817X.2010.491505","article-title":"Robotic cells with stochastic processing times","volume":"42","author":"Geismar","year":"2010","journal-title":"IIE Trans."},{"key":"10.1016\/j.robot.2017.01.009_b20","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1109\/TASE.2010.2046891","article-title":"Optimal scheduling of multicluster tools with constant robot moving times, part i: two-cluster analysis","volume":"38","author":"Chan","year":"2011","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"key":"10.1016\/j.robot.2017.01.009_b21","doi-asserted-by":"crossref","first-page":"1584","DOI":"10.1109\/TSMC.2014.2327051","article-title":"Optimal one-wafer cyclic scheduling of single-arm multicluster tools with two-space buffering modules","volume":"44","author":"Yang","year":"2014","journal-title":"IEEE Trans. Syst. Man Cybern. Syst."},{"key":"10.1016\/j.robot.2017.01.009_b22","doi-asserted-by":"crossref","first-page":"651","DOI":"10.1016\/j.cirp.2011.05.007","article-title":"Mechanical servo press technology for metal forming","volume":"60","author":"Osakada","year":"2011","journal-title":"CIRP Ann. Manuf. Technol."},{"key":"10.1016\/j.robot.2017.01.009_b23","unstructured":"M. Foumani, K. Smith-Miles, I. Gunawan, A. Moeini, Stochastic scheduling of an automated two-machine robotic cell with in-process inspection system, in: 45th International Conference on Computers and Industrial Engineering, 2015, pp. 528\u2013536"},{"key":"10.1016\/j.robot.2017.01.009_b24","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1023\/A:1018995317468","article-title":"Cyclic scheduling in robotic flowshops","volume":"96","author":"Crama","year":"2000","journal-title":"Ann. Oper. Res.: Math. Ind. Syst."},{"key":"10.1016\/j.robot.2017.01.009_b25","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/BF01324886","article-title":"Sequencing of parts and robot moves in a robotic cell","volume":"4","author":"Sethi","year":"1992","journal-title":"Int. J. Flexible Manuf. Syst."},{"key":"10.1016\/j.robot.2017.01.009_b26","doi-asserted-by":"crossref","first-page":"952","DOI":"10.1287\/opre.45.6.952","article-title":"Cyclic scheduling of identical parts in a robotic cell","volume":"45","author":"Crama","year":"1997","journal-title":"Oper. Res."},{"key":"10.1016\/j.robot.2017.01.009_b27","doi-asserted-by":"crossref","first-page":"204","DOI":"10.1016\/j.measurement.2005.07.009","article-title":"In-process dimensional inspection sensors","volume":"38","author":"Vacharanukul","year":"2005","journal-title":"Measurement"},{"key":"10.1016\/j.robot.2017.01.009_b28","doi-asserted-by":"crossref","first-page":"335","DOI":"10.1016\/j.omega.2010.08.002","article-title":"The facility location problem with Bernoulli demands","volume":"39","author":"Sambola","year":"2011","journal-title":"Omega"},{"key":"10.1016\/j.robot.2017.01.009_b29","series-title":"Stochastic Processes","author":"Ross","year":"1996"},{"key":"10.1016\/j.robot.2017.01.009_b30","doi-asserted-by":"crossref","first-page":"220","DOI":"10.1016\/S0278-6125(03)90022-7","article-title":"A graph-theoretic, linear-time scheme to detect and resolve deadlocks in flexible manufacturing cells","volume":"22","author":"Venkatesh","year":"2003","journal-title":"J. Manuf. Syst."},{"key":"10.1016\/j.robot.2017.01.009_b31","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1016\/j.rcim.2013.05.001","article-title":"Compound Fabrication: A multi-functional robotic platform for digital design and fabrication","volume":"29","author":"Keating","year":"2013","journal-title":"Robot. Comput.-Integr. Manuf."},{"key":"10.1016\/j.robot.2017.01.009_b32","doi-asserted-by":"crossref","unstructured":"M. Foumani, Y. Ibrahim, I. Gunawan, Cyclic scheduling in small-scale robotic cells served by a multi-function robot, in: IEEE 39th Annual Conference of Industrial Electronics Society, 2013, pp. 4362\u20134367","DOI":"10.1109\/IECON.2013.6699837"},{"key":"10.1016\/j.robot.2017.01.009_b33","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1016\/j.robot.2013.09.005","article-title":"Constraint optimization model of a scheduling problem for a robotic arm in automatic systems","volume":"62","author":"Kolakowska","year":"2014","journal-title":"Robot. Auton. Syst."},{"key":"10.1016\/j.robot.2017.01.009_b34","doi-asserted-by":"crossref","first-page":"4037","DOI":"10.1080\/00207543.2014.883471","article-title":"Scheduling rotationally arranged robotic cells served by a multi-function robot","volume":"52","author":"Foumani","year":"2014","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.robot.2017.01.009_b35","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/j.rcim.2016.02.004","article-title":"Towards industrial internet of things: crankshaft monitoring, traceability and tracking using RFID","volume":"41","author":"Velandia","year":"2016","journal-title":"Robot. Comput.-Integr. Manuf."},{"key":"10.1016\/j.robot.2017.01.009_b36","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/j.rcim.2015.09.001","article-title":"Sensitivity-analysis based method in single-robot cells cost-effective design and optimization","volume":"38","author":"Zhang","year":"2016","journal-title":"Robot. Comput.-Integr. Manuf."},{"key":"10.1016\/j.robot.2017.01.009_b37","doi-asserted-by":"crossref","unstructured":"W.-K. Chan, J. Yi, S. Ding, D. Song, Optimal scheduling of k-unit production of cluster tools with single-blade robots, in: IEEE International Conference Automation Science and Engineering, 2008, pp. 335\u2013340","DOI":"10.1109\/COASE.2007.4341844"}],"container-title":["Robotics and Autonomous Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0921889016302573?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0921889016302573?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2022,7,22]],"date-time":"2022-07-22T21:35:33Z","timestamp":1658525733000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0921889016302573"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,5]]},"references-count":37,"alternative-id":["S0921889016302573"],"URL":"https:\/\/doi.org\/10.1016\/j.robot.2017.01.009","relation":{},"ISSN":["0921-8890"],"issn-type":[{"value":"0921-8890","type":"print"}],"subject":[],"published":{"date-parts":[[2017,5]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Scheduling of two-machine robotic rework cells: In-process, post-process and in-line inspection scenarios","name":"articletitle","label":"Article Title"},{"value":"Robotics and Autonomous Systems","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.robot.2017.01.009","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2017 Elsevier B.V. All rights reserved.","name":"copyright","label":"Copyright"}]}}