{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,11,19]],"date-time":"2024-11-19T16:22:10Z","timestamp":1732033330967},"reference-count":76,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Reliability Engineering & System Safety"],"published-print":{"date-parts":[[2011,1]]},"DOI":"10.1016\/j.ress.2010.06.001","type":"journal-article","created":{"date-parts":[[2010,6,9]],"date-time":"2010-06-09T08:51:44Z","timestamp":1276073504000},"page":"64-74","source":"Crossref","is-referenced-by-count":238,"title":["Some considerations on the treatment of uncertainties in risk assessment for practical decision making"],"prefix":"10.1016","volume":"96","author":[{"given":"Terje","family":"Aven","sequence":"first","affiliation":[]},{"given":"Enrico","family":"Zio","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.ress.2010.06.001_bib1","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/j.ress.2009.09.010","article-title":"Some reflections on uncertainty analysis and management","volume":"95","author":"Aven","year":"2010","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib2","series-title":"Understanding risk: informing decisions in a democratic society","author":"National Research Council","year":"1996"},{"key":"10.1016\/j.ress.2010.06.001_bib3","series-title":"Risk management and political culture","author":"Jasanoff","year":"1986"},{"key":"10.1016\/j.ress.2010.06.001_bib4","series-title":"Science at the bar","author":"Jasanoff","year":"1995"},{"key":"10.1016\/j.ress.2010.06.001_bib5","doi-asserted-by":"crossref","first-page":"1359","DOI":"10.1126\/science.2255906","article-title":"The concept of probability in safety assessments of technological systems","volume":"250","author":"Apostolakis","year":"1990","journal-title":"Science"},{"key":"10.1016\/j.ress.2010.06.001_bib6","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1016\/S0951-8320(96)00071-3","article-title":"Different methods are needed to propage ignorance and variability","volume":"54","author":"Ferson","year":"1996","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib7","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1007\/BF02562676","article-title":"An overview of robust Bayesian analysis","volume":"3","author":"Berger","year":"1994","journal-title":"Test"},{"key":"10.1016\/j.ress.2010.06.001_bib8","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1214\/aoms\/1177698950","article-title":"Upper and lower probabilities induced by a multivalued mapping","volume":"38","author":"Dempster","year":"1967","journal-title":"Annals of Mathematical Statistics"},{"key":"10.1016\/j.ress.2010.06.001_bib9","series-title":"A mathematical theory of evidence","author":"Shafer","year":"1976"},{"key":"10.1016\/j.ress.2010.06.001_bib10","series-title":"Possibility theory","author":"Dubois","year":"1988"},{"key":"10.1016\/j.ress.2010.06.001_bib11","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1016\/j.csda.2006.04.015","article-title":"Possibility theory and statistical reasoning","volume":"51","author":"Dubois","year":"2006","journal-title":"Computational Statistics & Data Analysis"},{"issue":"5","key":"10.1016\/j.ress.2010.06.001_bib12","doi-asserted-by":"crossref","first-page":"763","DOI":"10.1111\/j.1539-6924.1999.tb00446.x","article-title":"Historical relationship between performance assessment for radioactive waste disposal and other types of risk assessment","volume":"19","author":"Rechard","year":"1999","journal-title":"Risk Analysis"},{"issue":"3","key":"10.1016\/j.ress.2010.06.001_bib13","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1016\/S0951-8320(00)00023-5","article-title":"Historical background on performance assessment for the waste isolation pilot plant","volume":"69","author":"Rechard","year":"2000","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib14","unstructured":"NRC. Reactor safety study, an assessment of accident risks. Wash 1400. Report NUREG-75\/014. U.S. Nuclear Regulatory Commission, Washington, DC, 1975."},{"key":"10.1016\/j.ress.2010.06.001_bib15","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1016\/j.ress.2008.06.002","article-title":"Reliability engineering: old problems and new challenges","volume":"94","author":"Zio","year":"2009","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib16","unstructured":"Apostolakis GE. PRA\/QRA: an historical perspective. In: 2006 Probabilistic\/quantitative risk assessment workshop, Taiwan, 29\u201330 November 2006."},{"key":"10.1016\/j.ress.2010.06.001_bib17","unstructured":"Farmer FR. The growth of reactor safety criteria in the United Kingdom. In: Anglo-Spanish power symposium, Madrid, 1964."},{"key":"10.1016\/j.ress.2010.06.001_bib18","volume":"1967","author":"Garrick","year":"1967"},{"key":"10.1016\/j.ress.2010.06.001_bib19","unstructured":"NRC. Severe accident risks: an assessment for five U.S. nuclear power plants. NUREG-1150, vols. 1\u20133. Washington, DC: U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, Division of Systems Research; 1990\u20131991."},{"issue":"1","key":"10.1016\/j.ress.2010.06.001_bib20","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0029-5493(92)90300-K","article-title":"Summary description of the methods used in the probabilistic risk assessments for NUREG-1150","volume":"135","author":"Breeding","year":"1992","journal-title":"Nuclear Engineering and Design"},{"key":"10.1016\/j.ress.2010.06.001_bib21","series-title":"Probabilistic risk assessment procedures guide for NASA managers and practitioners","author":"NASA","year":"2002"},{"key":"10.1016\/j.ress.2010.06.001_bib22","series-title":"Foundations of risk analysis","author":"Aven","year":"2003"},{"key":"10.1016\/j.ress.2010.06.001_bib23","series-title":"Probabilistic risk analysis. Foundations and methods","author":"Bedford","year":"2001"},{"key":"10.1016\/j.ress.2010.06.001_bib24","series-title":"Probabilistic risk assessment","author":"Henley","year":"1992"},{"key":"10.1016\/j.ress.2010.06.001_bib25","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1111\/j.1539-6924.1981.tb01350.x","article-title":"On the quantitative definition of risk","volume":"1","author":"Kaplan","year":"1981","journal-title":"Risk Analysis"},{"key":"10.1016\/j.ress.2010.06.001_bib26","series-title":"Reliability and risk analysis","author":"McCormick","year":"1981"},{"key":"10.1016\/j.ress.2010.06.001_bib27","unstructured":"NUREG. PRA procedures guide. NUREG\/CR-2300, vols. 1&2, January 1983."},{"issue":"2009","key":"10.1016\/j.ress.2010.06.001_bib28","doi-asserted-by":"crossref","first-page":"1000","DOI":"10.1016\/j.ress.2008.11.006","article-title":"Incorporating organizational factors into probabilistic risk assessment (PRA) of complex socio-technical systems: a hybrid technique formalization","volume":"94","author":"Mohaghegh","year":"2009","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib29","first-page":"258","article-title":"Fondamenti logici del ragionamento probabilistico","volume":"9","author":"de Finetti","year":"1930","journal-title":"Bollettinodell\u2019Unione Matematica Italiana"},{"key":"10.1016\/j.ress.2010.06.001_bib30","series-title":"Reliability and risk. A Bayesian perspective","author":"Singpurwalla","year":"2006"},{"issue":"3","key":"10.1016\/j.ress.2010.06.001_bib31","doi-asserted-by":"crossref","first-page":"293","DOI":"10.1111\/1467-9884.00238","article-title":"The philosophy of statistics","volume":"49","author":"Lindley","year":"2000","journal-title":"The Statistician"},{"key":"10.1016\/j.ress.2010.06.001_bib32","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1111\/j.1539-6924.2010.01362.x","article-title":"Comments on Aven\u2019s paper","volume":"30","author":"North","year":"2010","journal-title":"Risk Analysis"},{"issue":"3","key":"10.1016\/j.ress.2010.06.001_bib33","doi-asserted-by":"crossref","first-page":"354","DOI":"10.1111\/j.1539-6924.2009.01314.x","article-title":"On the need for restricting the probabilistic analysis in risk assessments to variability","volume":"30","author":"Aven","year":"2010","journal-title":"Risk Analysis. With Discussion"},{"key":"10.1016\/j.ress.2010.06.001_bib34","doi-asserted-by":"crossref","first-page":"483","DOI":"10.1111\/j.1539-6924.1994.tb00266.x","article-title":"Treatment of uncertainty in performance assessments for complex systems","volume":"14","author":"Helton","year":"1994","journal-title":"Risk Analysis"},{"key":"10.1016\/j.ress.2010.06.001_bib35","doi-asserted-by":"crossref","first-page":"1175","DOI":"10.1016\/j.ress.2005.11.017","article-title":"Survey of sampling-based methods for uncertainty and sensitivity analysis","volume":"91","author":"Helton","year":"2006","journal-title":"Reliability Engineering & System Safety"},{"issue":"3","key":"10.1016\/j.ress.2010.06.001_bib36","doi-asserted-by":"crossref","first-page":"204","DOI":"10.13182\/04-54CR","article-title":"Comparative review of sensitivity and uncertainty analysis of large-scale systems\u2014II: Statistical methods","volume":"147","author":"Cacuci","year":"2004","journal-title":"Nuclear Science and Engineering"},{"key":"10.1016\/j.ress.2010.06.001_bib37","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1016\/S0951-8320(02)00239-9","article-title":"Models and model uncertainty in the context of risk analysis","volume":"79","author":"Nilsen","year":"2003","journal-title":"Reliability Engineering & Systems Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib38","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1016\/S0951-8320(97)00137-3","article-title":"Model uncertainty and model inaccuracy","volume":"59","author":"Devooght","year":"1998","journal-title":"Reliab Engng Syst Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib39","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1016\/S0951-8320(96)00078-6","article-title":"Two methods for the structured assessment of model uncertainty by experts in performance assessments of radioactive waste repositories","volume":"54","author":"Zio","year":"1996","journal-title":"Reliab Engng Syst Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib40","unstructured":"Parry, G, Drouin, MT. Risk-informed regulatory decision-making at the U.S. NRC: dealing with model uncertainty. Nuclear Regulatory Commission, 2009."},{"issue":"1","key":"10.1016\/j.ress.2010.06.001_bib41","first-page":"28","article-title":"Characterization and evaluation of uncertainty in probabilistic risk analysis","volume":"22","author":"Parry","year":"1981","journal-title":"Nuclear Safety"},{"issue":"5","key":"10.1016\/j.ress.2010.06.001_bib42","doi-asserted-by":"crossref","first-page":"707","DOI":"10.1111\/j.1539-6924.1994.tb00281.x","article-title":"Propagation of uncertainty in risk assessments: the need to distinguish between uncertainty due to lack of knowledge and uncertainty due to variability","volume":"14","author":"Hoffman","year":"1994","journal-title":"Risk Analysis"},{"key":"10.1016\/j.ress.2010.06.001_bib43","first-page":"1","volume":"85","year":"2004"},{"key":"10.1016\/j.ress.2010.06.001_bib44","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ress.2004.03.001","article-title":"Guest editorial: alternative representation of uncertainty","volume":"85","author":"Helton","year":"2004","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib45","series-title":"Theory of probability","author":"de Finetti","year":"1974"},{"key":"10.1016\/j.ress.2010.06.001_bib46","series-title":"Bayesian theory","author":"Bernardo","year":"1994"},{"issue":"2\u20133","key":"10.1016\/j.ress.2010.06.001_bib47","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1016\/S0951-8320(96)00067-1","article-title":"Uncertainties in risk analysis: six levels of treatment","volume":"54","author":"Pat\u00e9-Cornell","year":"1996","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib48","series-title":"Safety, reliability and risk analysis. Theory, methods and applications. Proceedings of the European safety and reliability conference 2009 (ESREL 2009)","first-page":"2081","article-title":"Alternative representations of uncertainty in reliability and risk analysis \u2013 review and discussion","author":"Flage","year":"2009"},{"key":"10.1016\/j.ress.2010.06.001_bib49","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1111\/j.1539-6924.2010.01359.x","article-title":"Representation, propagation and decision issues in risk analysis under incomplete probabilistic information","volume":"30","author":"Dubois","year":"2010","journal-title":"Risk Analysis"},{"key":"10.1016\/j.ress.2010.06.001_bib50","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1016\/S0951-8320(96)00070-1","article-title":"Uncertainty in probabilistic risk assessment","volume":"85","author":"Winkler","year":"1996","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib51","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1080\/07408170802322713","article-title":"Conceptualistic pragmatism: a framework for Bayesian analysis?","volume":"41","author":"Bergman","year":"2009","journal-title":"IIE Transactions"},{"key":"10.1016\/j.ress.2010.06.001_bib52","doi-asserted-by":"crossref","first-page":"1862","DOI":"10.1016\/j.ress.2009.06.003","article-title":"Reliability and validity of risk analysis","volume":"94","author":"Aven","year":"2009","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib53","series-title":"Engineering safety","first-page":"138","article-title":"Acceptable risk","author":"Reid","year":"1992"},{"key":"10.1016\/j.ress.2010.06.001_bib54","first-page":"309","article-title":"Science, precaution and risk assessment: towards more measured and constructive policy debate","volume":"8","author":"Stirling","year":"2007","journal-title":"European Molecular Biology Organisation Reports"},{"key":"10.1016\/j.ress.2010.06.001_bib55","series-title":"Implementing the precautionary principle","article-title":"The role of science and precaution in environmental and public health policy","author":"Tickner","year":"2006"},{"issue":"1","key":"10.1016\/j.ress.2010.06.001_bib56","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1080\/136698798377321","article-title":"Three decades of risk research: accomplishments and new challenges","volume":"1","author":"Renn","year":"1998","journal-title":"Journal of Risk Research"},{"issue":"1\u20133","key":"10.1016\/j.ress.2010.06.001_bib57","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/j.ress.2004.03.025","article-title":"An exploration of alternative approaches to the representation of uncertainty in model predictions","volume":"85","author":"Helton","year":"2004","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib58","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1016\/j.ijar.2004.09.001","article-title":"Foundations of probabilistic inference with uncertain evidence","volume":"39","author":"Groen","year":"2005","journal-title":"International Journal of Approximate Reasoning"},{"key":"10.1016\/j.ress.2010.06.001_bib59","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1109\/TFUZZ.2006.876720","article-title":"Joint propagation of probabilistic and possibilistic information in risk assessment","volume":"14","author":"Baudrit","year":"2006","journal-title":"IEEE Transactions on Fuzzy Systems"},{"issue":"5","key":"10.1016\/j.ress.2010.06.001_bib60","doi-asserted-by":"crossref","first-page":"1309","DOI":"10.1111\/j.1539-6924.2008.01085.x","article-title":"A combined Monte Carlo and possibilistic approach to uncertainty propagation in event tree analysis","volume":"28","author":"Baraldi","year":"2008","journal-title":"Risk Analysis"},{"key":"10.1016\/j.ress.2010.06.001_bib61","series-title":"Reliability, risk and safety: theory and applications. supplement proceedings of the European safety and reliability conference 2009 (ESREL 2009)","first-page":"1761","article-title":"Handling epistemic uncertainties in fault tree analysis by probabilistic and possibilistic approaches","author":"Flage","year":"2010"},{"key":"10.1016\/j.ress.2010.06.001_bib62","unstructured":"Flage R, Baraldi P, Zio E, Aven T. Probabilistic and possibilistic treatment of epistemic uncertainties in fault tree analysis. Submitted for publication."},{"key":"10.1016\/j.ress.2010.06.001_bib63","series-title":"Risk analysis","author":"Aven","year":"2008"},{"key":"10.1016\/j.ress.2010.06.001_bib64","doi-asserted-by":"crossref","first-page":"768","DOI":"10.1016\/j.ress.2007.03.025","article-title":"A semi-quantitative approach to risk analysis, as an alternative to QRAs","volume":"93","author":"Aven","year":"2008","journal-title":"Reliability Engineering and System Safety."},{"issue":"6","key":"10.1016\/j.ress.2010.06.001_bib65","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1016\/j.ress.2010.01.011","article-title":"On how to define, understand and describe risk","volume":"95","author":"Aven","year":"2010","journal-title":"Reliability Engineering and System Safety."},{"key":"10.1016\/j.ress.2010.06.001_bib66","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1111\/j.0272-4332.2004.00455.x","article-title":"How useful is quantitative risk assessment?","volume":"24","author":"Apostolakis","year":"2004","journal-title":"Risk Analysis"},{"key":"10.1016\/j.ress.2010.06.001_bib67","series-title":"Misconceptions of risk","author":"Aven","year":"2010"},{"key":"10.1016\/j.ress.2010.06.001_bib68","series-title":"Global sensitivity analysis: the primer","author":"Saltelli","year":"2008"},{"issue":"3","key":"10.1016\/j.ress.2010.06.001_bib69","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1111\/0272-4332.00039","article-title":"Identification and review of sensitivity analysis methods","volume":"22","author":"Frey","year":"2002","journal-title":"Risk Analysis"},{"key":"10.1016\/j.ress.2010.06.001_bib70","series-title":"Statistical reasoning with imprecise probabilities","author":"Walley","year":"1991"},{"key":"10.1016\/j.ress.2010.06.001_bib71","series-title":"Understanding uncertainty","author":"Lindley","year":"2006"},{"key":"10.1016\/j.ress.2010.06.001_bib72","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1016\/0888-613X(90)90012-Q","article-title":"Perspectives on the theory and practice of belief functions","volume":"4","author":"Shafer","year":"1990","journal-title":"International Journal of Approximate Reasoning"},{"issue":"2\u20133","key":"10.1016\/j.ress.2010.06.001_bib73","article-title":"Specuial issue on treatment of aleatory and epistemic uncertainty","volume":"54","author":"Helton","year":"1996","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/j.ress.2010.06.001_bib74","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1109\/3468.487956","article-title":"Uncertaity about probability: a reconciliation with the subjectivist viewpoint","volume":"26","author":"Mosleh","year":"1996","journal-title":"IEEE Trans. on Systems. Man and Cyber. Part A: Systems ansd Humans"},{"key":"10.1016\/j.ress.2010.06.001_bib75","unstructured":"Coolen FPA, Utkin LV. Imprecise probability: a concise overview. In: Aven T, Vinnem JE. edtors. Risk, reliability and societal safety: proceedings of the European safety and reliability conference (ESREL), Stavanger, Norway, 25\u201327 June 2007. London: Taylor & Francis, 1959\u201366."},{"key":"10.1016\/j.ress.2010.06.001_bib76","doi-asserted-by":"crossref","first-page":"753","DOI":"10.1007\/s12046-008-0032-3","article-title":"Determination of bounds on failure probability in the presence of hybrid uncertainties","volume":"33","author":"Anoop","year":"2008","journal-title":"Sadhana"}],"container-title":["Reliability Engineering & System Safety"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0951832010001286?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0951832010001286?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2023,6,1]],"date-time":"2023-06-01T13:42:37Z","timestamp":1685626957000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0951832010001286"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,1]]},"references-count":76,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2011,1]]}},"alternative-id":["S0951832010001286"],"URL":"https:\/\/doi.org\/10.1016\/j.ress.2010.06.001","relation":{},"ISSN":["0951-8320"],"issn-type":[{"value":"0951-8320","type":"print"}],"subject":[],"published":{"date-parts":[[2011,1]]}}}