{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,11]],"date-time":"2024-07-11T17:22:55Z","timestamp":1720718575401},"reference-count":21,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2015,8,21]],"date-time":"2015-08-21T00:00:00Z","timestamp":1440115200000},"content-version":"vor","delay-in-days":232,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Procedia Computer Science"],"published-print":{"date-parts":[[2015]]},"DOI":"10.1016\/j.procs.2015.08.503","type":"journal-article","created":{"date-parts":[[2015,9,15]],"date-time":"2015-09-15T04:21:03Z","timestamp":1442290863000},"page":"387-394","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":3,"special_numbering":"C","title":["Implementation of Pre-defined Potential Scope Reductions in Projects"],"prefix":"10.1016","volume":"64","author":[{"given":"Nils O.E.","family":"Olsson","sequence":"first","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.procs.2015.08.503_bib0005","doi-asserted-by":"crossref","unstructured":"Chevroulet, T., Giorgi, L., and Reynaud, C. \u201cNew Approach for the Assessment of High-Speed Rail Projects and How to Contain Cost Overruns: Lessons from the EVA-TREN Project.\u201d. J. Infrastruct. Syst. 2012; 18(4), 297-304.","DOI":"10.1061\/(ASCE)IS.1943-555X.0000111"},{"issue":"2","key":"10.1016\/j.procs.2015.08.503_bib0010","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1080\/01944360508976688","article-title":"How (in)accurate are demand forecasts in public works projects","volume":"71","author":"Flyvbjerg","year":"2005","journal-title":"J. Am. Planning Assoc"},{"key":"10.1016\/j.procs.2015.08.503_bib0015","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1016\/j.tranpol.2012.04.002","article-title":"Different cost performance: different determinants?.: The case of cost overruns in Dutch transport infrastructure projects","volume":"22","author":"Cantarelli","year":"2012","journal-title":"Transport Policy"},{"key":"10.1016\/j.procs.2015.08.503_bib0020","unstructured":"Concept (2015). www.concept.ntnu.no."},{"key":"10.1016\/j.procs.2015.08.503_bib0025","doi-asserted-by":"crossref","unstructured":"Olsson, N.O. E., & Magnussen, O.M. Flexibility at different stages in the life cycle of projects: an empirical illustration of the \u201cfreedom to maneuver\u201d. PMJ; 2007. p. 25-32.","DOI":"10.1002\/pmj.20015"},{"key":"10.1016\/j.procs.2015.08.503_bib0030","doi-asserted-by":"crossref","unstructured":"Cui, Y., and Olsson, N.O. E. Project flexibility in practice: an empirical study of reduction lists in large governmental projects. International journal of project management; 2009. p. 447-455.","DOI":"10.1016\/j.ijproman.2008.07.007"},{"issue":"4","key":"10.1016\/j.procs.2015.08.503_bib0035","first-page":"17","article-title":"Cost reduction idea for a LNG project","volume":"81","author":"Gilbert","year":"1985","journal-title":"Chem Eng Prog"},{"issue":"1","key":"10.1016\/j.procs.2015.08.503_bib0040","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1108\/JEDT-03-2013-0021","article-title":"Value management and innovation: A historical perspective and review of the evidence","volume":"13","author":"Jay","year":"2015","journal-title":"Journal of Engineering Design and Technology"},{"issue":"4","key":"10.1016\/j.procs.2015.08.503_bib0045","first-page":"171","article-title":"Value engineering part I. Eng. Manage. J","volume":"3","author":"Webb","year":"1993"},{"key":"10.1016\/j.procs.2015.08.503_bib0050","doi-asserted-by":"crossref","unstructured":"Younker, D.L. Value Engineering: Analysis And Methodology. Marcel Dekker; 2003.","DOI":"10.1201\/9780203912751"},{"key":"10.1016\/j.procs.2015.08.503_bib0055","doi-asserted-by":"crossref","unstructured":"Palmer, A., Kelly, J. and Male, S. Holistic appraisal of value engineering in construction in United States, Journal of Construction Engineering and Management 1996:122(4);324-328.","DOI":"10.1061\/(ASCE)0733-9364(1996)122:4(324)"},{"key":"10.1016\/j.procs.2015.08.503_bib0060","unstructured":"Thiry, M. Value Management Practice, Project Management Institute, Newtown Square PA; 1997."},{"key":"10.1016\/j.procs.2015.08.503_bib0065","unstructured":"Kelly, J., Male, S. Value Management in Design and Construction: The Economic Management of Projects, E & FN Spon, London; 1993."},{"key":"10.1016\/j.procs.2015.08.503_bib0070","doi-asserted-by":"crossref","unstructured":"Kwok,ECS., Anderson,PM., and Ng, SHS. Value engineering for railway construction projects: cost driver analysis Proc. IMechE 2010; 224 Part F: J. Rail and Rapid Transit.","DOI":"10.1243\/09544097JRRT291"},{"key":"10.1016\/j.procs.2015.08.503_bib0075","unstructured":"FTA. The Fort Worth Transportation Authority. Value Engineering on Transit Projects. January 5, 1996 http:\/\/www.fta.dot.gov\/printer_friendly\/12840_9647.html."},{"issue":"4","key":"10.1016\/j.procs.2015.08.503_bib0080","first-page":"72","volume":"47","author":"Hennessey","year":"2002","journal-title":"Value engineering results in successful precast railroad bridge solution P.C.I.J."},{"key":"10.1016\/j.procs.2015.08.503_bib0085","doi-asserted-by":"crossref","unstructured":"Bennett, R. and Adams, M. Port of Tacoma Engineering Estimate Validations on Large Projects. Ports 2010: Building on the Past, Respecting the Future. Edited by Thomas Ward, P.E., S.E.; and Bruce I. Ostbo, P.E., S.E. 12th Triannual International Conference on Ports. Jacksonville, Florida, United States; 2010. p. 1145-1152.","DOI":"10.1061\/41098(368)118"},{"key":"10.1016\/j.procs.2015.08.503_bib0090","doi-asserted-by":"crossref","unstructured":"Chan, DWM., Lam, PTI., Chan, APC, Wong, JMW. Achieving better performance through target cost contracts, Facilities . 2010; 28(5\/6):261-277.","DOI":"10.1108\/02632771011031501"},{"issue":"4","key":"10.1016\/j.procs.2015.08.503_bib0095","doi-asserted-by":"crossref","first-page":"883","DOI":"10.1080\/002075498193444","article-title":"Product life cycle cost analysis: State of the art review","volume":"36","author":"Asiedu","year":"1998","journal-title":"International Journal of Production Research"},{"key":"10.1016\/j.procs.2015.08.503_bib0100","doi-asserted-by":"crossref","unstructured":"Geissenheimer, H.H. PART 4: Rail Transit: New Vehicle Options for Lower-Cost Rail Mobility: Using Diesel or Dual-Powered Light Rail Cars as a Transfer of Technology Journal. Transportation Research Record: Journal of the Transportation Research Board . Volume 1571\/1997 Public Transit 1997: Bus, Paratransit, Intermodal, and Rail, 123-133. Transportation Research Board of the National Academies.","DOI":"10.3141\/1571-16"},{"key":"10.1016\/j.procs.2015.08.503_bib0105","unstructured":"Volden, G.H. Samset, K. (2013) Etterevaluering av statlige investeringsprosjekter. Konklusjoner, erfaringer og r\u00e5d basert p\u00e5 pilotevaluering av fire prosjekter. Concept rapport nr 30. Norges Teknisk- Naturvitenskapelige universitet. http:\/\/www.concept.ntnu.no\/Publikasjoner\/Rapportserie\/Nr.%2030_webutgave30_norsk.pdf."}],"container-title":["Procedia Computer Science"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1877050915026381?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1877050915026381?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2022,5,21]],"date-time":"2022-05-21T20:55:54Z","timestamp":1653166554000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S1877050915026381"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"references-count":21,"alternative-id":["S1877050915026381"],"URL":"https:\/\/doi.org\/10.1016\/j.procs.2015.08.503","relation":{},"ISSN":["1877-0509"],"issn-type":[{"value":"1877-0509","type":"print"}],"subject":[],"published":{"date-parts":[[2015]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Implementation of Pre-defined Potential Scope Reductions in Projects","name":"articletitle","label":"Article Title"},{"value":"Procedia Computer Science","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.procs.2015.08.503","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2015 The Authors. Published by Elsevier B.V.","name":"copyright","label":"Copyright"}]}}