{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,11]],"date-time":"2024-07-11T17:22:40Z","timestamp":1720718560803},"reference-count":19,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2015,8,21]],"date-time":"2015-08-21T00:00:00Z","timestamp":1440115200000},"content-version":"vor","delay-in-days":232,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Procedia Computer Science"],"published-print":{"date-parts":[[2015]]},"DOI":"10.1016\/j.procs.2015.08.489","type":"journal-article","created":{"date-parts":[[2015,9,15]],"date-time":"2015-09-15T00:18:29Z","timestamp":1442276309000},"page":"265-273","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":2,"special_numbering":"C","title":["Redundancy Resource Allocation for Reliable Project Scheduling: A Game-theoretical Approach"],"prefix":"10.1016","volume":"64","author":[{"given":"M.","family":"Rohaninejad","sequence":"first","affiliation":[]},{"given":"R.","family":"Tavakkoli-Moghaddam","sequence":"additional","affiliation":[]},{"given":"B.","family":"Vahedi-Nouri","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"issue":"5","key":"10.1016\/j.procs.2015.08.489_bib0005","doi-asserted-by":"crossref","first-page":"3126","DOI":"10.1016\/j.apm.2012.07.028","article-title":"Minimizing the total completion time on a single machine with the learning effect and multiple availability constraints","volume":"37","author":"Vahedi-Nouri Behdin","year":"2013","journal-title":"Applied Mathematical Modelling"},{"issue":"5","key":"10.1016\/j.procs.2015.08.489_bib0010","doi-asserted-by":"crossref","first-page":"470","DOI":"10.1080\/0951192X.2014.880808","article-title":"Two hybrid tabu search\u2013firefly algorithms for the capacitated job shop scheduling problem with sequence-dependent setup cost","volume":"28","author":"Rohaninejad Mohammad","year":"2015","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"1\u20134","key":"10.1016\/j.procs.2015.08.489_bib0015","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1007\/s00170-014-6415-1","article-title":"A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem","volume":"77","author":"Rohaninejad Mohamad","year":"2015","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"1\u20134","key":"10.1016\/j.procs.2015.08.489_bib0020","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s00170-014-6598-5","article-title":"Simultaneous lot-sizing and scheduling in flexible job shop problems","volume":"78","author":"Rohaninejad Mohammad","year":"2015","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"10.1016\/j.procs.2015.08.489_bib0025","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/j.ejor.2004.04.002","article-title":"Project scheduling under uncertainty: Survey and research potentials","volume":"165","author":"Herroelen Willy","year":"2005","journal-title":"European journal of operational research"},{"issue":"3","key":"10.1016\/j.procs.2015.08.489_bib0030","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1016\/S0377-2217(02)00499-X","article-title":"Rescheduling of identical parallel machines under machine eligibility constraints","volume":"149","author":"Alag\u00f6z O\u011fuzhan","year":"2003","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.procs.2015.08.489_bib0035","unstructured":"Fang, Chen, Rainer Kolisch, Ling Wang, and Chundi Mu. \u201cAn estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem.\u201d Flexible Services and Manufacturing Journal (2012): 1-21."},{"key":"10.1016\/j.procs.2015.08.489_bib0040","doi-asserted-by":"crossref","unstructured":"Wang, Juite. \u201cA fuzzy robust scheduling approach for product development projects.\u201d European Journal of Operational Research 152, no. 1 (2004): 180-194.","DOI":"10.1016\/S0377-2217(02)00701-4"},{"key":"10.1016\/j.procs.2015.08.489_bib0045","unstructured":"Lamas, Patricio, and Erik Demeulemeester. \u201cA purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations.\u201d Journal of Scheduling (2014): 1-20."},{"key":"10.1016\/j.procs.2015.08.489_bib0050","doi-asserted-by":"crossref","unstructured":"Penz, Bernard, Christophe Rapine, and Denis Trystram. \u201cSensitivity analysis of scheduling algorithms.\u201d European Journal of Operational Research 134, no. 3 (2001): 606-615.","DOI":"10.1016\/S0377-2217(00)00281-2"},{"key":"10.1016\/j.procs.2015.08.489_bib0055","unstructured":"Br\u010di\u0107, Mario, Damir Kalpi\u0107, and Kre\u0161imir Fertalj. \u201cResource constrained project scheduling under uncertainty: a survey.\u201d In 23rd Central European Conference on Information and Intelligent Systems. 2012."},{"key":"10.1016\/j.procs.2015.08.489_bib0060","doi-asserted-by":"crossref","unstructured":"Chaari, Tarak, Sondes Chaabane, Nassima Aissani, and Damien Trentesaux. \u201cScheduling under uncertainty: Survey and research directions.\u201d In Advanced Logistics and Transport (ICALT), 2014 International Conference on, pp. 229-234. IEEE, 2014.","DOI":"10.1109\/ICAdLT.2014.6866316"},{"key":"10.1016\/j.procs.2015.08.489_bib0065","doi-asserted-by":"crossref","unstructured":"Lin, Xiaoxia, Stacy L. Janak, and Christodoulos A. Floudas. \u201cA new robust optimization approach for scheduling under uncertainty:: I. Bounded uncertainty.\u201d Computers & chemical engineering 28, no. 6 (2004): 1069-1085.","DOI":"10.1016\/j.compchemeng.2003.09.020"},{"key":"10.1016\/j.procs.2015.08.489_bib0070","doi-asserted-by":"crossref","unstructured":"Lambrechts, Olivier, Erik Demeulemeester, and Willy Herroelen. \u201cProactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities.\u201d Journal of scheduling 11, no. 2 (2008): 121-136.","DOI":"10.1007\/s10951-007-0021-0"},{"key":"10.1016\/j.procs.2015.08.489_bib0075","doi-asserted-by":"crossref","unstructured":"Lambrechts, Olivier, Erik Demeulemeester, and Willy Herroelen. \u201cA tabu search procedure for developing robust predictive project schedules.\u201d International Journal of Production Economics 111, no. 2 (2008): 493-508.","DOI":"10.1016\/j.ijpe.2007.02.003"},{"key":"10.1016\/j.procs.2015.08.489_bib0080","doi-asserted-by":"crossref","unstructured":"Lambrechts, Olivier, Erik Demeulemeester, and Willy Herroelen. \u201cTime slack-based techniques for robust project scheduling subject to resource uncertainty.\u201d Annals of Operations Research 186, no. 1 (2011): 443-464.","DOI":"10.1007\/s10479-010-0777-z"},{"key":"10.1016\/j.procs.2015.08.489_bib0085","doi-asserted-by":"crossref","unstructured":"Ji, Xiaoyu, and Kai Yao. \u201cUncertain project scheduling problem with resource constraints.\u201d Journal of Intelligent Manufacturing (2014): 1-6.","DOI":"10.1007\/s10845-014-0980-x"},{"key":"10.1016\/j.procs.2015.08.489_bib0090","doi-asserted-by":"crossref","unstructured":"Fu, Na, Hoong Chuin Lau, and Pradeep Varakantham. \u201cRobust execution strategies for project scheduling with unreliable resources and stochastic durations.\u201d Journal of Scheduling (2015): 1-16.","DOI":"10.1007\/s10951-015-0425-1"},{"key":"10.1016\/j.procs.2015.08.489_bib0095","unstructured":"Kallenberg, Olav. Foundations of modern probability. Springer Science & Business Media, 2006."}],"container-title":["Procedia Computer Science"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1877050915026241?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1877050915026241?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2018,9,19]],"date-time":"2018-09-19T07:27:44Z","timestamp":1537342064000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S1877050915026241"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"references-count":19,"alternative-id":["S1877050915026241"],"URL":"https:\/\/doi.org\/10.1016\/j.procs.2015.08.489","relation":{},"ISSN":["1877-0509"],"issn-type":[{"value":"1877-0509","type":"print"}],"subject":[],"published":{"date-parts":[[2015]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Redundancy Resource Allocation for Reliable Project Scheduling: A Game-theoretical Approach","name":"articletitle","label":"Article Title"},{"value":"Procedia Computer Science","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.procs.2015.08.489","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2015 The Authors. Published by Elsevier B.V.","name":"copyright","label":"Copyright"}]}}