{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,16]],"date-time":"2024-09-16T09:58:48Z","timestamp":1726480728702},"reference-count":16,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[2005,1,1]],"date-time":"2005-01-01T00:00:00Z","timestamp":1104537600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Operations Research Letters"],"published-print":{"date-parts":[[2005,1]]},"DOI":"10.1016\/j.orl.2004.02.006","type":"journal-article","created":{"date-parts":[[2004,4,28]],"date-time":"2004-04-28T18:18:59Z","timestamp":1083176339000},"page":"81-89","source":"Crossref","is-referenced-by-count":133,"title":["Transport risk models for hazardous materials: revisited"],"prefix":"10.1016","volume":"33","author":[{"given":"Erhan","family":"Erkut","sequence":"first","affiliation":[]},{"given":"Armann","family":"Ingolfsson","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.orl.2004.02.006_BIB1","first-page":"30","article-title":"Selecting criteria for designating hazardous materials highway routes","volume":"1333","author":"Abkowitz","year":"1992","journal-title":"Transp. Res. Rec"},{"key":"10.1016\/j.orl.2004.02.006_BIB2","unstructured":"ALK Associates, ALK's PC\u2217HazRoute (Version 2.0), ALK Associates Inc., 1994."},{"key":"10.1016\/j.orl.2004.02.006_BIB3","first-page":"4","article-title":"Risk-based transportation planning practice: overall methodology and a case example","volume":"33","author":"Alp","year":"1995","journal-title":"INFOR"},{"key":"10.1016\/j.orl.2004.02.006_BIB4","series-title":"Dynamic Programming and Optimal Control, 2nd Edition, Vol. II","author":"Bertsekas","year":"2001"},{"key":"10.1016\/j.orl.2004.02.006_BIB5","first-page":"114","article-title":"Linear versus nonlinear models for hazardous materials routing","volume":"33","author":"Boffey","year":"1995","journal-title":"INFOR"},{"key":"10.1016\/j.orl.2004.02.006_BIB6","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1016\/0167-6377(95)00030-N","article-title":"On the credibility of the conditional risk model for routing hazardous materials","volume":"18","author":"Erkut","year":"1995","journal-title":"Oper. Res. Lett"},{"key":"10.1016\/j.orl.2004.02.006_BIB7","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1287\/trsc.34.2.165.12303","article-title":"Catastrophe avoidance models for hazardous materials route planning","volume":"34","author":"Erkut","year":"2000","journal-title":"Transp. Sci"},{"key":"10.1016\/j.orl.2004.02.006_BIB8","series-title":"Facility Location: A Survey of Applications and Methods","article-title":"Hazardous materials logistics","author":"Erkut","year":"1995"},{"key":"10.1016\/j.orl.2004.02.006_BIB9","doi-asserted-by":"crossref","first-page":"625","DOI":"10.1287\/opre.46.5.625","article-title":"Modeling of transport risk for hazardous materials","volume":"46","author":"Erkut","year":"1998","journal-title":"Oper. Res"},{"key":"10.1016\/j.orl.2004.02.006_BIB10","unstructured":"Frontline Systems, Premium Solver Platform (Version 3.5), Frontline Systems, 1999."},{"key":"10.1016\/j.orl.2004.02.006_BIB11","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1061\/(ASCE)0733-947X(1993)119:2(189)","article-title":"Procedure for developing truck accident and release rates for hazmat routing","volume":"119","author":"Harwood","year":"1993","journal-title":"J. Transp. Eng"},{"key":"10.1016\/j.orl.2004.02.006_BIB12","doi-asserted-by":"crossref","first-page":"138","DOI":"10.1287\/trsc.25.2.138","article-title":"Simultaneous siting and routing in the disposal of hazardous wastes","volume":"25","author":"ReVelle","year":"1991","journal-title":"Transp. Sci"},{"key":"10.1016\/j.orl.2004.02.006_BIB13","first-page":"12","article-title":"Economic evaluation of routing strategies for hazardous road shipments","volume":"1020","author":"Saccomanno","year":"1985","journal-title":"Transp. Res. Rec"},{"key":"10.1016\/j.orl.2004.02.006_BIB14","series-title":"Transportation of Dangerous Goods: Assessing the Risks, Institute for Risk Research","article-title":"Establishing credible risk criteria for transporting extremely dangerous hazardous materials","author":"Sivakumar","year":"1993"},{"key":"10.1016\/j.orl.2004.02.006_BIB15","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/0167-6377(93)90034-E","article-title":"A network-based model for transporting extremely hazardous materials","volume":"13","author":"Sivakumar","year":"1993","journal-title":"Oper. Res. Lett"},{"key":"10.1016\/j.orl.2004.02.006_BIB16","unstructured":"The Mathworks, Matlab (Version 6.5), The Mathworks, 2002."}],"container-title":["Operations Research Letters"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0167637704000410?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0167637704000410?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,2,9]],"date-time":"2019-02-09T20:27:30Z","timestamp":1549744050000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0167637704000410"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005,1]]},"references-count":16,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2005,1]]}},"alternative-id":["S0167637704000410"],"URL":"https:\/\/doi.org\/10.1016\/j.orl.2004.02.006","relation":{},"ISSN":["0167-6377"],"issn-type":[{"value":"0167-6377","type":"print"}],"subject":[],"published":{"date-parts":[[2005,1]]}}}