{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,13]],"date-time":"2024-08-13T16:55:21Z","timestamp":1723568121858},"reference-count":13,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2005,5,1]],"date-time":"2005-05-01T00:00:00Z","timestamp":1114905600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Operations Research Letters"],"published-print":{"date-parts":[[2005,5]]},"DOI":"10.1016\/j.orl.2003.10.012","type":"journal-article","created":{"date-parts":[[2004,10,21]],"date-time":"2004-10-21T14:48:22Z","timestamp":1098370102000},"page":"274-284","source":"Crossref","is-referenced-by-count":24,"title":["A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line"],"prefix":"10.1016","volume":"33","author":[{"given":"Ada","family":"Che","sequence":"first","affiliation":[]},{"given":"Chengbin","family":"Chu","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.orl.2003.10.012_bib1","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/S0167-6377(00)00046-8","article-title":"Part sequencing in three-machine no-wait robotic cells","volume":"27\/4","author":"Agnetis","year":"2000","journal-title":"Oper. Res. Lett."},{"key":"10.1016\/j.orl.2003.10.012_bib2","first-page":"69","article-title":"Multicyclic hoist scheduling with constant processing times","volume":"18\/1","author":"Che","year":"2002","journal-title":"IEEE Trans. Robot. Automat."},{"key":"10.1016\/j.orl.2003.10.012_bib3","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1016\/S0377-2217(02)00175-3","article-title":"A polynomial algorithm for 2-degree cyclic robotic scheduling","volume":"145","author":"Che","year":"2003","journal-title":"Eur. J. Oper. Res."},{"key":"10.1016\/j.orl.2003.10.012_bib4","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1109\/70.660860","article-title":"Cyclic scheduling of a hoist with time window constraints","volume":"14\/1","author":"Chen","year":"1998","journal-title":"IEEE Trans. Robot. Automat."},{"key":"10.1016\/j.orl.2003.10.012_bib5","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1016\/S0167-6377(97)00036-9","article-title":"A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling","volume":"21\/4","author":"Kats","year":"1997","journal-title":"Oper. Res. Lett."},{"key":"10.1016\/j.orl.2003.10.012_bib6","doi-asserted-by":"crossref","first-page":"704","DOI":"10.1109\/70.781993","article-title":"Multiple-part cyclic hoist scheduling using a sieve method","volume":"15\/4","author":"Kats","year":"1999","journal-title":"IEEE Trans. Robot. Automat."},{"key":"10.1016\/j.orl.2003.10.012_bib7","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1080\/07408179408966593","article-title":"Determining optimal cyclic hoist schedules in a single-hoist electroplating line","volume":"26\/2","author":"Lei","year":"1994","journal-title":"IIE Trans."},{"key":"10.1016\/j.orl.2003.10.012_bib8","unstructured":"L. Lei, T.J. Wang, A proof: the cyclic hoist scheduling problem is NP-hard, Working Paper #89-0016, Rutgers University, 1989."},{"key":"10.1016\/j.orl.2003.10.012_bib9","doi-asserted-by":"crossref","first-page":"500","DOI":"10.1016\/S0377-2217(96)00272-X","article-title":"An improved algorithm for cyclic scheduling in a robotic cell","volume":"97","author":"Levner","year":"1997","journal-title":"Eur. J. Oper. Res."},{"key":"10.1016\/j.orl.2003.10.012_bib10","doi-asserted-by":"crossref","first-page":"905","DOI":"10.1080\/07408170208928921","article-title":"Cyclic scheduling of a single hoist in extended electroplating lines","volume":"34","author":"Liu","year":"2002","journal-title":"IIE Trans."},{"key":"10.1016\/j.orl.2003.10.012_bib11","doi-asserted-by":"crossref","first-page":"681","DOI":"10.1016\/0360-8352(95)98201-K","article-title":"Determining the optimal number of duplicate process tanks in a single-hoist circuit board production line","volume":"28\/4","author":"Ng","year":"1995","journal-title":"Comput. Ind. Eng."},{"key":"10.1016\/j.orl.2003.10.012_bib12","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1080\/05695557608975070","article-title":"Mathematical programming solution of a hoist scheduling program","volume":"8\/2","author":"Phillips","year":"1976","journal-title":"AIIE Trans."},{"key":"10.1016\/j.orl.2003.10.012_bib13","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1080\/07408178808966165","article-title":"Hoist scheduling for a PCB electroplating facility","volume":"20\/2","author":"Shapiro","year":"1988","journal-title":"IIE Trans."}],"container-title":["Operations Research Letters"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0167637704001233?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0167637704001233?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,2,2]],"date-time":"2019-02-02T19:22:30Z","timestamp":1549135350000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0167637704001233"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005,5]]},"references-count":13,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2005,5]]}},"alternative-id":["S0167637704001233"],"URL":"https:\/\/doi.org\/10.1016\/j.orl.2003.10.012","relation":{},"ISSN":["0167-6377"],"issn-type":[{"value":"0167-6377","type":"print"}],"subject":[],"published":{"date-parts":[[2005,5]]}}}