{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,24]],"date-time":"2025-03-24T07:28:18Z","timestamp":1742801298404},"reference-count":23,"publisher":"Elsevier BV","content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Knowledge-Based Systems"],"published-print":{"date-parts":[[2014,2]]},"DOI":"10.1016\/j.knosys.2013.12.011","type":"journal-article","created":{"date-parts":[[2013,12,16]],"date-time":"2013-12-16T02:30:21Z","timestamp":1387161021000},"page":"95-103","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":126,"special_numbering":"C","title":["A novel fruit fly optimization algorithm for the semiconductor final testing scheduling problem"],"prefix":"10.1016","volume":"57","author":[{"given":"Xiao-long","family":"Zheng","sequence":"first","affiliation":[]},{"given":"Ling","family":"Wang","sequence":"additional","affiliation":[]},{"given":"Sheng-yao","family":"Wang","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"issue":"1\u20132","key":"10.1016\/j.knosys.2013.12.011_b0005","doi-asserted-by":"crossref","first-page":"485","DOI":"10.1016\/j.eswa.2007.07.026","article-title":"Modeling semiconductor testing job scheduling and dynamic testing machine configuration","volume":"35","author":"Wu","year":"2008","journal-title":"Expert Syst. Appl."},{"issue":"2","key":"10.1016\/j.knosys.2013.12.011_b0010","doi-asserted-by":"crossref","first-page":"446","DOI":"10.1016\/j.ejor.2011.05.052","article-title":"Semiconductor final test scheduling with Sarsa(\u03bb, k) algorithm","volume":"215","author":"Zhang","year":"2011","journal-title":"Euro. J. Operat. Res."},{"key":"10.1016\/j.knosys.2013.12.011_b0015","doi-asserted-by":"crossref","DOI":"10.1007\/s10845-013-0746-x","article-title":"The cooperative estimation of distribution algorithm: a novel approach for semiconductor final test scheduling problems","author":"Hao","year":"2013","journal-title":"J. Intell. Manuf."},{"issue":"4","key":"10.1016\/j.knosys.2013.12.011_b0020","doi-asserted-by":"crossref","first-page":"270","DOI":"10.1109\/66.97809","article-title":"Production scheduling algorithms for a semiconductor test facility","volume":"4","author":"Uzso","year":"1991","journal-title":"IEEE Trans. Semiconduct. Manuf."},{"key":"10.1016\/j.knosys.2013.12.011_b0025","unstructured":"T.R. Chen, T.C. Hsia, Job shop scheduling with multiple resources and an application to a semiconductor testing facility, in: IEEE Proceedings of the 33rd Conference on Decision and Control, 1994, pp. 1564\u20131570."},{"issue":"4","key":"10.1016\/j.knosys.2013.12.011_b0030","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1007\/BF00170018","article-title":"Decomposition methods for scheduling semiconductor testing facilities","volume":"8","author":"Ovacik","year":"1996","journal-title":"Int. J. Flex. Manuf. Syst."},{"issue":"3","key":"10.1016\/j.knosys.2013.12.011_b0035","doi-asserted-by":"crossref","first-page":"384","DOI":"10.1109\/66.705373","article-title":"Scheduling of semiconductor test facility via Petri nets and hybrid heuristic search","volume":"11","author":"Xiong","year":"1998","journal-title":"IEEE Trans. Semiconduct. Manuf."},{"issue":"4","key":"10.1016\/j.knosys.2013.12.011_b0040","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1109\/66.806130","article-title":"Scheduling semiconductor device test operations on multihead testers","volume":"12","author":"Freed","year":"1999","journal-title":"IEEE Trans. Semiconduct. Manuf."},{"issue":"1","key":"10.1016\/j.knosys.2013.12.011_b0045","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1080\/0020754032000123588","article-title":"Capacity-constrained scheduling for a logic IC final test facility","volume":"42","author":"Lin","year":"2004","journal-title":"Int. J. Product. Res."},{"issue":"6","key":"10.1016\/j.knosys.2013.12.011_b0050","doi-asserted-by":"crossref","first-page":"2255","DOI":"10.1007\/s10845-011-0570-0","article-title":"A novel bi-vector encoding genetic algorithm for the simultaneous multiple resources scheduling problem","volume":"23","author":"Wu","year":"2012","journal-title":"J. Intell. Manuf."},{"key":"10.1016\/j.knosys.2013.12.011_b0055","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1016\/j.knosys.2011.07.001","article-title":"A new fruit fly optimization algorithm: taking the financial distress model as an example","volume":"26","author":"Pan","year":"2012","journal-title":"Knowl.-Based Syst."},{"key":"10.1016\/j.knosys.2013.12.011_b0060","doi-asserted-by":"crossref","first-page":"783","DOI":"10.1007\/s00521-011-0769-1","article-title":"Analysis of service satisfaction in web auction logistics service using a combination of fruit fly optimization algorithm and general regression neural network","volume":"22","author":"Lin","year":"2013","journal-title":"Neural Comput. Appl."},{"issue":"2\u20133","key":"10.1016\/j.knosys.2013.12.011_b0065","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1080\/09540091.2013.854735","article-title":"Using modified fruit fly optimisation algorithm to perform the function test and case studies","volume":"25","author":"Pan","year":"2013","journal-title":"Connect. Sci."},{"key":"10.1016\/j.knosys.2013.12.011_b0070","doi-asserted-by":"crossref","first-page":"69","DOI":"10.4156\/jcit.vol7.issue16.9","article-title":"A novel modified fly optimization algorithm for designing the self-tuning proportional integral derivative controller","volume":"7","author":"Li","year":"2012","journal-title":"J. Converge. Inform. Technol."},{"issue":"1\u20132","key":"10.1016\/j.knosys.2013.12.011_b0075","doi-asserted-by":"crossref","first-page":"611","DOI":"10.1007\/s11071-013-0814-y","article-title":"Fruit fly optimization algorithm based fractional order fuzzy-PID controller for electronic throttle","volume":"73","author":"Sheng","year":"2013","journal-title":"Nonlin. Dynam."},{"issue":"4","key":"10.1016\/j.knosys.2013.12.011_b0080","doi-asserted-by":"crossref","first-page":"917","DOI":"10.1016\/j.cie.2011.12.014","article-title":"A bi-population based estimation of distribution algorithm for the flexible job-shop scheduling problem","volume":"62","author":"Wang","year":"2012","journal-title":"Comput. Indust. Eng."},{"issue":"12","key":"10.1016\/j.knosys.2013.12.011_b0085","doi-asserted-by":"crossref","first-page":"3574","DOI":"10.1080\/00207543.2012.752588","article-title":"A Pareto-based estimation of distribution algorithm for the multi-objective flexible job-shop scheduling problem","volume":"51","author":"Wang","year":"2013","journal-title":"Int. J. Product. Res."},{"issue":"1\u20134","key":"10.1016\/j.knosys.2013.12.011_b0090","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1007\/s00170-011-3610-1","article-title":"An effective artificial bee colony algorithm for the flexible job-shop scheduling problem","volume":"60","author":"Wang","year":"2012","journal-title":"Int. J. Advan. Manuf. Technol."},{"issue":"3","key":"10.1016\/j.knosys.2013.12.011_b0095","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/S0925-5273(03)00186-5","article-title":"A case study on the multistage IC final testing scheduling problem with reentry","volume":"88","author":"Pearn","year":"2004","journal-title":"Int. J. Product. Econ."},{"issue":"1","key":"10.1016\/j.knosys.2013.12.011_b0100","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1109\/4235.585892","article-title":"LM, Ant colony system: a cooperative learning approach to the traveling salesman problem","volume":"1","author":"Dorigo","year":"1997","journal-title":"IEEE Trans. Evolution. Comput."},{"key":"10.1016\/j.knosys.2013.12.011_b0105","doi-asserted-by":"crossref","unstructured":"X.S. Yang, Firefly algorithms for multimodal optimization, in: Stochastic Algorithms: Foundations and Applications, SAGA 2009, Lecture Notes in Computer Sciences, vol. 5792, 2009, pp. 169\u2013178.","DOI":"10.1007\/978-3-642-04944-6_14"},{"issue":"5\u20138","key":"10.1016\/j.knosys.2013.12.011_b0110","doi-asserted-by":"crossref","first-page":"757","DOI":"10.1007\/s00170-010-2642-2","article-title":"A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem","volume":"51","author":"Wang","year":"2010","journal-title":"Int. J. Advan. Manuf. Technol."},{"key":"10.1016\/j.knosys.2013.12.011_b0115","series-title":"Design and Analysis of Experiments","author":"Montgomery","year":"2005"}],"container-title":["Knowledge-Based Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0950705113003912?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0950705113003912?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2018,10,8]],"date-time":"2018-10-08T01:51:57Z","timestamp":1538963517000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0950705113003912"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,2]]},"references-count":23,"alternative-id":["S0950705113003912"],"URL":"https:\/\/doi.org\/10.1016\/j.knosys.2013.12.011","relation":{},"ISSN":["0950-7051"],"issn-type":[{"value":"0950-7051","type":"print"}],"subject":[],"published":{"date-parts":[[2014,2]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"A novel fruit fly optimization algorithm for the semiconductor final testing scheduling problem","name":"articletitle","label":"Article Title"},{"value":"Knowledge-Based Systems","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.knosys.2013.12.011","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2013 Elsevier B.V. All rights reserved.","name":"copyright","label":"Copyright"}]}}