{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,5]],"date-time":"2024-08-05T13:22:17Z","timestamp":1722864137529},"reference-count":46,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2019,7,1]],"date-time":"2019-07-01T00:00:00Z","timestamp":1561939200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"funder":[{"DOI":"10.13039\/501100005416","name":"Norwegian Research Council","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100005416","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2019,7]]},"DOI":"10.1016\/j.ejor.2019.01.023","type":"journal-article","created":{"date-parts":[[2019,1,16]],"date-time":"2019-01-16T16:46:31Z","timestamp":1547657191000},"page":"495-509","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":30,"title":["Optimizing vessel fleet size and mix to support maintenance operations at offshore wind farms"],"prefix":"10.1016","volume":"276","author":[{"given":"Magnus","family":"St\u00e5lhane","sequence":"first","affiliation":[]},{"given":"Elin E.","family":"Halvorsen-Weare","sequence":"additional","affiliation":[]},{"given":"Lars Magne","family":"Non\u00e5s","sequence":"additional","affiliation":[]},{"ORCID":"http:\/\/orcid.org\/0000-0001-5028-0475","authenticated-orcid":false,"given":"Giovanni","family":"Pantuso","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.ejor.2019.01.023_bib0001","first-page":"93","article-title":"Robust fleet sizing and deployment for industrial and independent bulk ocean shipping companies","volume":"49","author":"Alvarez","year":"2011","journal-title":"INFOR: Information Systems and Operational Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0002","doi-asserted-by":"crossref","first-page":"60","DOI":"10.1016\/j.tre.2014.09.010","article-title":"A stochastic programming formulation for strategic fleet renewal in shipping","volume":"72","author":"Bakkehaug","year":"2014","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"key":"10.1016\/j.ejor.2019.01.023_bib0003","doi-asserted-by":"crossref","first-page":"894","DOI":"10.1016\/j.ejor.2017.05.043","article-title":"A mixed-method optimisation and simulation framework for supporting logistical decisions during offshore wind farm installations","volume":"264","author":"Barlow","year":"2018","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0004","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s11750-007-0009-0","article-title":"Static pickup and delivery problems: A classification scheme and survey","volume":"15","author":"Berbeglia","year":"2007","journal-title":"TOP"},{"key":"10.1016\/j.ejor.2019.01.023_bib0005","unstructured":"BSH (2012). Bundesamt f\u00fcr seeschifffahrt und hydrographie (BSH) FINO \u2013 Datenbank. http:\/\/fino.bsh.de accessed: Dec 3, 2016."},{"key":"10.1016\/j.ejor.2019.01.023_bib0006","unstructured":"van Bussel, G., Henderson, A., Morgan, C., Smith, B., Barthelmie, R., Argyriadis, K., et\u00a0al., (2001). State of the art and technology trends for offshore wind energy: Operation and maintenance issues. In Proceedings of the EWEA special topic conference on offshore wind energy (pp. 10\u201312)."},{"key":"10.1016\/j.ejor.2019.01.023_bib0007","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1260\/0309-524X.39.1.15","article-title":"Routing and scheduling of maintenance fleet for offshore wind farms","volume":"39","author":"Dai","year":"2015","journal-title":"Wind Engineering"},{"key":"10.1016\/j.ejor.2019.01.023_bib0008","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/j.oceaneng.2015.04.040","article-title":"Advanced logistics planning for offshore wind farm operation and maintenance activities","volume":"101","author":"Dalgic","year":"2015","journal-title":"Ocean Engineering"},{"key":"10.1016\/j.ejor.2019.01.023_bib0009","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1016\/j.egypro.2015.11.407","article-title":"Cost benefit analysis of mothership concept and investigation of optimum chartering strategy for offshore wind farms","volume":"80","author":"Dalgic","year":"2015","journal-title":"Energy Procedia"},{"key":"10.1016\/j.ejor.2019.01.023_bib0010","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1260\/0309-524X.39.1.31","article-title":"Investigation of optimum crew transfer vessel fleet for offshore wind farm maintenance operations","volume":"39","author":"Dalgic","year":"2015","journal-title":"Wind Engineering"},{"key":"10.1016\/j.ejor.2019.01.023_bib0011","doi-asserted-by":"crossref","first-page":"106","DOI":"10.1016\/j.oceaneng.2014.12.011","article-title":"Investigation of optimum jack-up vessel chartering strategy for offshore wind farm o&m activities","volume":"95","author":"Dalgic","year":"2015","journal-title":"Ocean Engineering"},{"key":"10.1016\/j.ejor.2019.01.023_bib0012","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1260\/0309-524X.39.1.1","article-title":"Reference cases for verification of operation and maintenance simulation models for offshore wind farms","volume":"39","author":"Dinwoodie","year":"2015","journal-title":"Wind Engineering"},{"key":"10.1016\/j.ejor.2019.01.023_bib0013","series-title":"Proceedings of the winter simulation conference 2014","first-page":"1712","article-title":"Marine logistics decision support for operation and maintenance of offshore wind parks with a multi method simulation model","author":"Endrerud","year":"2014"},{"key":"10.1016\/j.ejor.2019.01.023_bib0014","doi-asserted-by":"crossref","first-page":"917","DOI":"10.1016\/j.ejor.2017.07.061","article-title":"Optimizing wind farm cable routing considering power losses","volume":"270","author":"Fischetti","year":"2018","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0015","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1016\/j.trc.2015.01.005","article-title":"A stochastic fleet size and mix model for maintenance operations at offshore wind farms","volume":"52","author":"Gundegjerde","year":"2015","journal-title":"Transportation Research Part C: Emerging Technologies"},{"key":"10.1016\/j.ejor.2019.01.023_bib0016","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1016\/j.egypro.2013.07.170","article-title":"Vessel fleet analysis for maintenance operations at offshore wind farms","volume":"35","author":"Halvorsen-Weare","year":"2013","journal-title":"Energy Procedia"},{"key":"10.1016\/j.ejor.2019.01.023_bib0017","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1016\/j.egypro.2017.10.382","article-title":"A metaheuristic solution method for optimizing vessel fleet size and mix for maintenance operations at offshore wind farms under uncertainty","volume":"137","author":"Halvorsen-Weare","year":"2017","journal-title":"Energy Procedia"},{"key":"10.1016\/j.ejor.2019.01.023_sbref0016","series-title":"Wind turbine reliability: A database and analysis approach","author":"Hill","year":"2008"},{"key":"10.1016\/j.ejor.2019.01.023_bib0019","doi-asserted-by":"crossref","first-page":"2041","DOI":"10.1016\/j.cor.2010.03.015","article-title":"Industrial aspects and literature survey: Fleet composition and routing","volume":"37","author":"Hoff","year":"2010","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0020","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1260\/0309-524X.35.1.1","article-title":"A review of decision support models for offshore wind farms with an emphasis on operation and maintenance strategies","volume":"35","author":"Hofmann","year":"2011","journal-title":"Wind Engineering"},{"key":"10.1016\/j.ejor.2019.01.023_bib0021","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/j.egypro.2013.07.171","article-title":"NOWIcob \u2013 A tool for reducing the maintenance costs of offshore wind farms","volume":"35","author":"Hofmann","year":"2013","journal-title":"Energy Procedia"},{"key":"10.1016\/j.ejor.2019.01.023_bib0022","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1016\/j.ejor.2016.05.059","article-title":"Optimisation of maintenance routing and scheduling for offshore wind farms","volume":"256","author":"Irawan","year":"2017","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0023","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1016\/j.ejor.2016.09.032","article-title":"Layout optimisation for an installation port of an offshore wind farm","volume":"259","author":"Irawan","year":"2017","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0024","series-title":"Column generation GERAD 25th anniversary series","first-page":"33","article-title":"Shortest path problems with resource constraints","author":"Irnich","year":"2005"},{"key":"10.1016\/j.ejor.2019.01.023_sbref0023","series-title":"Springer series in operations research and financial engineering chapter","doi-asserted-by":"crossref","DOI":"10.1007\/978-0-387-87817-1_4","article-title":"Scenario-tree generation: With Michael Kaut","author":"King","year":"2012"},{"key":"10.1016\/j.ejor.2019.01.023_bib0026","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1080\/03088839.2010.486635","article-title":"A chance constrained programming model for short-term liner ship fleet planning problems","volume":"37","author":"Meng","year":"2010","journal-title":"Maritime Policy & Management"},{"key":"10.1016\/j.ejor.2019.01.023_bib0027","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.ejor.2012.06.025","article-title":"Short-term liner ship fleet planning with container transshipment and uncertain container shipment demand","volume":"223","author":"Meng","year":"2012","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0028","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/j.omega.2016.03.007","article-title":"Maximizing the rate of return on the capital employed in shipping capacity renewal","volume":"67","author":"M\u00f8rch","year":"2017","journal-title":"Omega"},{"key":"10.1016\/j.ejor.2019.01.023_bib0029","doi-asserted-by":"crossref","first-page":"341","DOI":"10.1016\/j.ejor.2013.04.058","article-title":"A survey on maritime fleet size and mix problems","volume":"235","author":"Pantuso","year":"2014","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0030","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1287\/ijoc.2014.0612","article-title":"Solving hierarchical stochastic programs: Application to the maritime fleet renewal problem","volume":"27","author":"Pantuso","year":"2015","journal-title":"INFORMS Journal on Computing"},{"key":"10.1016\/j.ejor.2019.01.023_bib0031","doi-asserted-by":"crossref","first-page":"390","DOI":"10.1287\/trsc.2014.0566","article-title":"Uncertainty in fleet renewal: A case from maritime transportation","volume":"50","author":"Pantuso","year":"2016","journal-title":"Transportation Science"},{"key":"10.1016\/j.ejor.2019.01.023_bib0032","doi-asserted-by":"crossref","first-page":"346","DOI":"10.1016\/j.trc.2015.04.019","article-title":"The fleet renewal problem with regional emission limitations: Case study from roll-on\/roll-off shipping","volume":"56","author":"Patricksson","year":"2015","journal-title":"Transportation Research Part C: Emerging Technologies"},{"key":"10.1016\/j.ejor.2019.01.023_sbref0031","series-title":"A guide to UK offshore wind operations and maintenance","author":"Phillips","year":"2013"},{"key":"10.1016\/j.ejor.2019.01.023_sbref0032","series-title":"Optimisation of maintenance strategies for offshore wind farms \u2013 A case study performed with the OMCE-calculator","author":"van de Pieterman","year":"2011"},{"key":"10.1016\/j.ejor.2019.01.023_sbref0033","series-title":"Tools for estimating operation and maintenance costs of offshore wind farms: State of the art","author":"Rademakers","year":"2008"},{"key":"10.1016\/j.ejor.2019.01.023_bib0036","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1287\/trsc.1090.0272","article-title":"Branch-and-cut-and-price for the pickup and delivery problem with time windows","volume":"43","author":"Ropke","year":"2009","journal-title":"Transportation Science"},{"key":"10.1016\/j.ejor.2019.01.023_bib0037","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/j.cor.2018.05.019","article-title":"Coordinating technician allocation and maintenance routing for offshore wind farms","volume":"98","author":"Schrotenboer","year":"2018","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0038","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1016\/j.renene.2014.11.045","article-title":"Maintenance logistics organization for offshore wind energy: Current progress and future perspectives","volume":"77","author":"Shafiee","year":"2015","journal-title":"Renewable Energy"},{"key":"10.1016\/j.ejor.2019.01.023_bib0039","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/j.egypro.2014.07.231","article-title":"A comparison of single- and multi-parameter wave criteria for accessing wind turbines in strategic maintenance and logistics models for offshore wind farms","volume":"53","author":"Sperstad","year":"2014","journal-title":"Energy Procedia"},{"key":"10.1016\/j.ejor.2019.01.023_bib0040","doi-asserted-by":"crossref","first-page":"334","DOI":"10.1016\/j.oceaneng.2017.09.009","article-title":"Testing the robustness of optimal access vessel fleet selection for operation and maintenance of offshore wind farms","volume":"145","author":"Sperstad","year":"2017","journal-title":"Ocean Engineering"},{"key":"10.1016\/j.ejor.2019.01.023_bib0041","doi-asserted-by":"crossref","first-page":"3361","DOI":"10.1016\/j.cor.2012.04.021","article-title":"A branch-price-and-cut method for a ship routing and scheduling problem with split loads","volume":"39","author":"St\u00e5lhane","year":"2012","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0042","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1016\/j.egypro.2015.11.411","article-title":"Optimization of routing and scheduling of vessels to perform maintenance at offshore wind farms","volume":"80","author":"St\u00e5lhane","year":"2015","journal-title":"Energy Procedia"},{"key":"10.1016\/j.ejor.2019.01.023_bib0043","doi-asserted-by":"crossref","first-page":"877","DOI":"10.1016\/j.ejor.2017.12.021","article-title":"Probabilistic forecasting of wave height for offshore wind turbine maintenance","volume":"267","author":"Taylor","year":"2018","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0044","doi-asserted-by":"crossref","first-page":"703","DOI":"10.1016\/j.ejor.2016.08.057","article-title":"A benders decomposition approach for solving the offshore wind farm installation planning at the North Sea","volume":"258","author":"Ursavas","year":"2017","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2019.01.023_bib0045","unstructured":"WindEurope (2018). Offshore wind in Europe \u2013 key trends and statistics 2017. https:\/\/windeurope.org\/wp-content\/uploads\/files\/about-wind\/statistics\/WindEurope-Annual-Offshore-Statistics-2017.pdf."},{"key":"10.1016\/j.ejor.2019.01.023_bib0046","doi-asserted-by":"crossref","first-page":"479","DOI":"10.1016\/j.ejor.2017.03.019","article-title":"Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems","volume":"262","author":"Zhang","year":"2017","journal-title":"European Journal of Operational Research"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221719300426?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221719300426?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,8,8]],"date-time":"2019-08-08T01:40:56Z","timestamp":1565228456000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221719300426"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,7]]},"references-count":46,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2019,7]]}},"alternative-id":["S0377221719300426"],"URL":"https:\/\/doi.org\/10.1016\/j.ejor.2019.01.023","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2019,7]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Optimizing vessel fleet size and mix to support maintenance operations at offshore wind farms","name":"articletitle","label":"Article Title"},{"value":"European Journal of Operational Research","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.ejor.2019.01.023","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2019 Elsevier B.V. All rights reserved.","name":"copyright","label":"Copyright"}]}}