{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,15]],"date-time":"2024-07-15T11:16:59Z","timestamp":1721042219723},"reference-count":17,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2006,3,1]],"date-time":"2006-03-01T00:00:00Z","timestamp":1141171200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2006,3]]},"DOI":"10.1016\/j.ejor.2004.09.056","type":"journal-article","created":{"date-parts":[[2005,3,16]],"date-time":"2005-03-16T12:14:06Z","timestamp":1110975246000},"page":"751-760","source":"Crossref","is-referenced-by-count":22,"title":["Johnson\u2019s problem with stochastic processing times and optimal service level"],"prefix":"10.1016","volume":"169","author":[{"given":"Victor","family":"Portougal","sequence":"first","affiliation":[]},{"given":"Dan","family":"Trietsch","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.ejor.2004.09.056_bib1","doi-asserted-by":"crossref","first-page":"2475","DOI":"10.1155\/S016117120321019X","article-title":"Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times","volume":"39","author":"Allahverdi","year":"2003","journal-title":"International Journal of Mathematics and Mathematical Sciences"},{"key":"10.1016\/j.ejor.2004.09.056_bib2","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/0895-7177(94)90202-X","article-title":"Two-machine ordered flowshop scheduling under random breakdowns","volume":"20","author":"Allahverdi","year":"1994","journal-title":"Mathematical and Computer Modelling"},{"key":"10.1016\/j.ejor.2004.09.056_bib3","doi-asserted-by":"crossref","first-page":"376","DOI":"10.1016\/0377-2217(93)E0318-R","article-title":"Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function","volume":"81","author":"Allahverdi","year":"1995","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2004.09.056_bib4","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1111\/1475-3995.00393","article-title":"Two-machine flowshop minimum length scheduling problem with random and bounded processing times","volume":"10","author":"Allahverdi","year":"2003","journal-title":"International Transactions in Operational Research"},{"key":"10.1016\/j.ejor.2004.09.056_bib5","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1287\/opre.9.2.145","article-title":"The greatest of a finite set of random variables","volume":"9","author":"Clark","year":"1961","journal-title":"Operations Research"},{"key":"10.1016\/j.ejor.2004.09.056_bib6","doi-asserted-by":"crossref","first-page":"829","DOI":"10.1016\/0305-0548(95)00083-6","article-title":"Determining the optimal sequences and the distributional properties of their completion times in stochastic flow shops","volume":"23","author":"Dodin","year":"1996","journal-title":"Computers in Operations Research"},{"key":"10.1016\/j.ejor.2004.09.056_bib7","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1080\/07408179908969849","article-title":"The two-machine stochastic flowshop problem with arbitrary processing time distributions","volume":"31","author":"Elmaghraby","year":"1999","journal-title":"IIE Transactions"},{"key":"10.1016\/j.ejor.2004.09.056_bib8","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","article-title":"Optimal two- and three-stage production schedules with setup times included","volume":"1","author":"Johnson","year":"1954","journal-title":"Naval Research Logistics Quarterly"},{"key":"10.1016\/j.ejor.2004.09.056_bib9","doi-asserted-by":"crossref","first-page":"304","DOI":"10.1016\/S0377-2217(97)00424-4","article-title":"Stochastically minimizing the makespan in two-machine flow shops without blocking","volume":"112","author":"Kamburowski","year":"1999","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2004.09.056_bib10","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1287\/opre.34.1.130","article-title":"On Johnson\u2019s two-machine flow shop with random processing times","volume":"34","author":"Ku","year":"1986","journal-title":"Operations Research"},{"key":"10.1016\/j.ejor.2004.09.056_bib11","series-title":"Approximation and Weak Convergence Methods for Random Processes, with Applications to Random Systems Theory","author":"Kushner","year":"1984"},{"key":"10.1016\/j.ejor.2004.09.056_bib12","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1287\/opre.30.1.148","article-title":"Minimizing the expected makespan in stochastic flow shops","volume":"30","author":"Pinedo","year":"1982","journal-title":"Operations Research"},{"key":"10.1016\/j.ejor.2004.09.056_bib13","series-title":"Scheduling: Theory, Algorithms, and Systems","author":"Pinedo","year":"2001"},{"key":"10.1016\/j.ejor.2004.09.056_bib14","doi-asserted-by":"crossref","first-page":"1188","DOI":"10.1057\/palgrave.jors.2600639","article-title":"Makespan-related criteria for comparing schedules in stochastic environments","volume":"49","author":"Portougal","year":"1998","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/j.ejor.2004.09.056_bib15","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1057\/palgrave.jors.2601063","article-title":"Stochastic scheduling with optimal customer service","volume":"52","author":"Portougal","year":"2001","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/j.ejor.2004.09.056_bib16","doi-asserted-by":"crossref","first-page":"450","DOI":"10.1016\/S0377-2217(98)00003-4","article-title":"Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs","volume":"113","author":"Soroush","year":"1999","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2004.09.056_bib17","series-title":"Manufacturing Planning and Control Systems","author":"Vollman","year":"1997"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221705001414?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221705001414?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,1,28]],"date-time":"2019-01-28T02:52:37Z","timestamp":1548643957000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221705001414"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,3]]},"references-count":17,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2006,3]]}},"alternative-id":["S0377221705001414"],"URL":"https:\/\/doi.org\/10.1016\/j.ejor.2004.09.056","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2006,3]]}}}