{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,16]],"date-time":"2024-09-16T07:30:19Z","timestamp":1726471819274},"reference-count":13,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2005,1,1]],"date-time":"2005-01-01T00:00:00Z","timestamp":1104537600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2013,8,22]],"date-time":"2013-08-22T00:00:00Z","timestamp":1377129600000},"content-version":"vor","delay-in-days":3155,"URL":"https:\/\/www.elsevier.com\/open-access\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Discrete Applied Mathematics"],"published-print":{"date-parts":[[2005,1]]},"DOI":"10.1016\/j.dam.2004.02.012","type":"journal-article","created":{"date-parts":[[2004,8,13]],"date-time":"2004-08-13T14:20:05Z","timestamp":1092406805000},"page":"334-348","source":"Crossref","is-referenced-by-count":37,"title":["Robotic cell scheduling with operational flexibility"],"prefix":"10.1016","volume":"145","author":[{"given":"M.Selim","family":"Akturk","sequence":"first","affiliation":[]},{"given":"Hakan","family":"Gultekin","sequence":"additional","affiliation":[]},{"given":"Oya Ekin","family":"Karasan","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"issue":"2","key":"10.1016\/j.dam.2004.02.012_BIB1","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1016\/S0377-2217(99)00258-1","article-title":"Scheduling no-wait robotic cells with two and three machines","volume":"123","author":"Agnetis","year":"2000","journal-title":"European J. Oper. Res"},{"key":"10.1016\/j.dam.2004.02.012_BIB2","unstructured":"N. Brauner, G. Finke, Final results on the one-cycle conjecture in robotic cells, Internal note, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France, 1997."},{"year":"1996","series-title":"Production Management Systems","author":"Browne","key":"10.1016\/j.dam.2004.02.012_BIB3"},{"key":"10.1016\/j.dam.2004.02.012_BIB4","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1023\/A:1018995317468","article-title":"Cyclic scheduling in robotic flowshops","volume":"96","author":"Crama","year":"2000","journal-title":"Ann. Oper. Res"},{"issue":"6","key":"10.1016\/j.dam.2004.02.012_BIB5","doi-asserted-by":"crossref","first-page":"952","DOI":"10.1287\/opre.45.6.952","article-title":"Cyclic scheduling of identical parts in a robotic cell","volume":"45","author":"Crama","year":"1997","journal-title":"Oper. Res"},{"key":"10.1016\/j.dam.2004.02.012_BIB6","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1002\/(SICI)1099-1425(199901\/02)2:1<35::AID-JOS15>3.0.CO;2-J","article-title":"Cyclic scheduling in 3-machine robotic flow shops","volume":"4","author":"Crama","year":"1999","journal-title":"J. Scheduling"},{"year":"1976","series-title":"Computers and Intractability: A Guide to the Theory of NP-Completeness","author":"Garey","key":"10.1016\/j.dam.2004.02.012_BIB7"},{"issue":"3","key":"10.1016\/j.dam.2004.02.012_BIB8","doi-asserted-by":"crossref","first-page":"421","DOI":"10.1287\/opre.45.3.421","article-title":"Scheduling in robotic cells: classification, two and three machine cells","volume":"45","author":"Hall","year":"1997","journal-title":"Oper. Res"},{"key":"10.1016\/j.dam.2004.02.012_BIB9","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/S0166-218X(00)00316-4","article-title":"Makespan minimization for flow-shop problems with transportation times and a single robot","volume":"112","author":"Hurink","year":"2001","journal-title":"Discrete Appl. Math"},{"key":"10.1016\/j.dam.2004.02.012_BIB10","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1002\/jos.92","article-title":"Cyclic scheduling in a robotic production line","volume":"5","author":"Kats","year":"2002","journal-title":"J. Scheduling"},{"key":"10.1016\/j.dam.2004.02.012_BIB11","doi-asserted-by":"crossref","first-page":"3447","DOI":"10.1080\/00207549608905099","article-title":"Sequencing of robot activities and parts in two-machine robotic cells","volume":"34","author":"Logendran","year":"1996","journal-title":"Internat. J. Production Res"},{"key":"10.1016\/j.dam.2004.02.012_BIB12","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/BF01324886","article-title":"Sequencing of parts and robot moves in a robotic cell","volume":"4","author":"Sethi","year":"1992","journal-title":"Internat. J. Flexible Manufacturing Systems"},{"key":"10.1016\/j.dam.2004.02.012_BIB13","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1023\/A:1018952722784","article-title":"Scheduling large robotic cells without buffers","volume":"76","author":"Sriskandarajah","year":"1998","journal-title":"Ann. Oper. Res"}],"container-title":["Discrete Applied Mathematics"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0166218X0400126X?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0166218X0400126X?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,2,4]],"date-time":"2019-02-04T23:28:13Z","timestamp":1549322893000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0166218X0400126X"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005,1]]},"references-count":13,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2005,1]]}},"alternative-id":["S0166218X0400126X"],"URL":"https:\/\/doi.org\/10.1016\/j.dam.2004.02.012","relation":{},"ISSN":["0166-218X"],"issn-type":[{"type":"print","value":"0166-218X"}],"subject":[],"published":{"date-parts":[[2005,1]]}}}