{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,11,19]],"date-time":"2024-11-19T17:56:33Z","timestamp":1732038993673},"reference-count":55,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2020,7,1]],"date-time":"2020-07-01T00:00:00Z","timestamp":1593561600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computers & Operations Research"],"published-print":{"date-parts":[[2020,7]]},"DOI":"10.1016\/j.cor.2020.104917","type":"journal-article","created":{"date-parts":[[2020,2,21]],"date-time":"2020-02-21T18:53:38Z","timestamp":1582311218000},"page":"104917","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":39,"special_numbering":"C","title":["Attaining flexibility in seru production system by means of Shojinka: An optimization model and solution approaches"],"prefix":"10.1016","volume":"119","author":[{"ORCID":"http:\/\/orcid.org\/0000-0002-6202-4011","authenticated-orcid":false,"given":"\u00d6mer Faruk","family":"Y\u0131lmaz","sequence":"first","affiliation":[]}],"member":"78","reference":[{"issue":"2","key":"10.1016\/j.cor.2020.104917_bib0001","first-page":"143","article-title":"Comparing the performance of different meta-heuristics for unweighted parallel machine scheduling","volume":"26","author":"Adamu","year":"2015","journal-title":"S. Afr. J. Ind. Eng."},{"issue":"1\u20132","key":"10.1016\/j.cor.2020.104917_bib0002","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1016\/j.mcm.2009.09.004","article-title":"A multi-level genetic algorithm for a multi-stage space allocation problem","volume":"51","author":"Adewumi","year":"2010","journal-title":"Math. Comput. Model."},{"issue":"1","key":"10.1016\/j.cor.2020.104917_bib0003","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1016\/j.ijpe.2009.07.010","article-title":"Modeling job rotation in manufacturing systems: the study of employee\u2019s boredom and skill variations","volume":"123","author":"Azizi","year":"2010","journal-title":"Int. J. Product. Econ."},{"key":"10.1016\/j.cor.2020.104917_bib0004","doi-asserted-by":"crossref","first-page":"294","DOI":"10.1016\/j.eswa.2016.05.009","article-title":"A population initialization method for evolutionary algorithms based on clustering and Cauchy deviates","volume":"60","author":"Bajer","year":"2016","journal-title":"Expert Syst. Appl."},{"key":"10.1016\/j.cor.2020.104917_bib0005","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1016\/j.cie.2018.09.035","article-title":"Bi-level genetic algorithms for a two-stage assembly flow-shop scheduling problem with batch delivery system","volume":"126","author":"Basir","year":"2018","journal-title":"Comp. Ind. Eng."},{"issue":"24","key":"10.1016\/j.cor.2020.104917_bib0006","doi-asserted-by":"crossref","first-page":"7293","DOI":"10.1080\/00207543.2010.537385","article-title":"Minimising utility work and utility worker transfers for a mixed-model assembly line","volume":"49","author":"Cevikcan","year":"2011","journal-title":"Int. J. Product. Res."},{"issue":"10","key":"10.1016\/j.cor.2020.104917_bib0007","doi-asserted-by":"crossref","first-page":"13232","DOI":"10.1016\/j.eswa.2011.04.140","article-title":"Integrating parts design characteristics and scheduling on parallel machines","volume":"38","author":"Cevikcan","year":"2011","journal-title":"Expert Syst. Appl."},{"issue":"9","key":"10.1016\/j.cor.2020.104917_bib0008","doi-asserted-by":"crossref","first-page":"2696","DOI":"10.1080\/00207543.2014.883469","article-title":"Joint optimization of a flow-shop group scheduling with sequence dependent set-up times and skilled workforce assignment","volume":"52","author":"Costa","year":"2014","journal-title":"Int. J. Product. Res."},{"key":"10.1016\/j.cor.2020.104917_bib0009","first-page":"327","author":"Durmusoglu","year":"2017"},{"key":"10.1016\/j.cor.2020.104917_bib0010","doi-asserted-by":"crossref","DOI":"10.1016\/j.ijpe.2019.01.004","article-title":"Industry 4.0 technologies: implementation patterns in manufacturing companies","author":"Frank","year":"2019","journal-title":"Int. J. Product. Econ."},{"issue":"5","key":"10.1016\/j.cor.2020.104917_bib0011","first-page":"56","article-title":"An overview of methods maintaining diversity in genetic algorithms","volume":"2","author":"Gupta","year":"2012","journal-title":"Int. J. Emerg. Technol. Adv. Eng."},{"issue":"1","key":"10.1016\/j.cor.2020.104917_bib0012","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1038\/scientificamerican0792-66","article-title":"Genetic algorithms","volume":"267","author":"Holland","year":"1992","journal-title":"Sci. Am."},{"issue":"1","key":"10.1016\/j.cor.2020.104917_bib0013a","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1287\/mnsc.1030.0166","article-title":"Benefits of skill chaining in serial production lines with cross-trained workers","volume":"50","author":"Hopp","year":"2004","journal-title":"Manage Sci"},{"issue":"2","key":"10.1016\/j.cor.2020.104917_bib0013","first-page":"160","article-title":"A mathematical model for converting conveyor assembly line to cellular manufacturing","volume":"7","author":"Kaku","year":"2008","journal-title":"Ind. Eng. Manag. Syst."},{"issue":"8","key":"10.1016\/j.cor.2020.104917_bib0014","doi-asserted-by":"crossref","first-page":"2055","DOI":"10.1080\/00207540802275889","article-title":"Modeling and numerical analysis of line-cell conversion problems","volume":"47","author":"Kaku","year":"2009","journal-title":"Int. J. Product. Res."},{"issue":"1","key":"10.1016\/j.cor.2020.104917_bib0015","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1504\/EJIE.2008.016327","article-title":"A study on human-task-related performances in converting conveyor assembly line to cellular manufacturing","volume":"2","author":"Kaku","year":"2008","journal-title":"Eur. J. Ind. Eng."},{"issue":"2","key":"10.1016\/j.cor.2020.104917_bib0016","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1016\/0377-2217(95)00357-6","article-title":"Serial and parallel resource-constrained project scheduling methods revisited: theory and computation","volume":"90","author":"Kolisch","year":"1996","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"10.1016\/j.cor.2020.104917_bib0017","first-page":"4","article-title":"The aim of the special issue on seru manufacturing","volume":"45","author":"Kono","year":"2004","journal-title":"IE Review"},{"key":"10.1016\/j.cor.2020.104917_bib0018","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.engappai.2018.08.011","article-title":"A review of applications of genetic algorithms in operations management","volume":"76","author":"Lee","year":"2018","journal-title":"Eng. Appl. Artif. Intell."},{"key":"10.1016\/j.cor.2020.104917_bib0019","doi-asserted-by":"crossref","first-page":"366","DOI":"10.1016\/j.cie.2018.02.035","article-title":"A multi-skilled worker assignment problem in seru production systems considering the worker heterogeneity","volume":"118","author":"Lian","year":"2018","journal-title":"Comput. Ind. Eng."},{"key":"10.1016\/j.cor.2020.104917_bib0020","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1016\/j.jclepro.2014.03.033","article-title":"Production planning of multi-stage multi-option seru production systems with sustainable measures","volume":"105","author":"Liu","year":"2015","journal-title":"J. Clean. Prod."},{"issue":"3","key":"10.1016\/j.cor.2020.104917_bib0021","doi-asserted-by":"crossref","first-page":"312","DOI":"10.1016\/j.jmsy.2012.02.003","article-title":"Reconfiguration of assembly systems: from conveyor assembly line to serus","volume":"31","author":"Liu","year":"2012","journal-title":"J. Manuf. Syst."},{"issue":"2","key":"10.1016\/j.cor.2020.104917_bib0022","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1080\/19761597.2010.9668694","article-title":"Seru Seisan\u2010an innovation of the production management Mode in Japan","volume":"18","author":"Liu","year":"2010","journal-title":"Asian J. Technol. Innov."},{"issue":"5\u20138","key":"10.1016\/j.cor.2020.104917_bib0023","doi-asserted-by":"crossref","first-page":"937","DOI":"10.1007\/s00170-013-5027-5","article-title":"Training and assignment of multi-skilled workers for implementing seru production systems","volume":"69","author":"Liu","year":"2013","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"10.1016\/j.cor.2020.104917_bib0024","series-title":"Industrial Engineering and Engineering Management (IEEM), 2016 IEEE International Conference on","first-page":"1055","article-title":"Seru loading with worker-operation assignment in single period","author":"Luo","year":"2016"},{"issue":"3","key":"10.1016\/j.cor.2020.104917_bib0025","first-page":"193","article-title":"Genetic algorithms, tournament selection, and the effects of noise","volume":"9","author":"Miller","year":"1995","journal-title":"Complex Syst."},{"key":"10.1016\/j.cor.2020.104917_bib0026","series-title":"Production Innovation in Japan (in Japanese)","author":"Noguchi","year":"2003"},{"issue":"6","key":"10.1016\/j.cor.2020.104917_bib0027","first-page":"341","article-title":"Is japanese cell manufacturing a new system?: a comparative study between japanese cell manufacturing and cellular manufacturing (< special english issue>production and logistics)","volume":"55","author":"Sakazume","year":"2005","journal-title":"J. Jpn. Ind. Manag. Assoc."},{"issue":"1","key":"10.1016\/j.cor.2020.104917_bib0028","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1016\/S0272-6963(98)00028-X","article-title":"On theory in operations management","volume":"17","author":"Schmenner","year":"1998","journal-title":"J. Oper. Manag."},{"key":"10.1016\/j.cor.2020.104917_bib0029","series-title":"Proceedings of the Tenth International Conference on Management Science and Engineering Management","first-page":"1165","article-title":"Production system performance improvement by assembly line-seru conversion","author":"Shao","year":"2017"},{"key":"10.1016\/j.cor.2020.104917_bib0030","series-title":"Analytical Approaches to Strategic Decision-Making: Interdisciplinary Considerations","first-page":"45","article-title":"Seru production: an extension of just-in-time approach for volatile business environments","author":"Stecke","year":"2014"},{"issue":"1","key":"10.1016\/j.cor.2020.104917_bib0031","doi-asserted-by":"crossref","first-page":"106","DOI":"10.4018\/jsds.2012010104","article-title":"Seru: the organizational extension of JIT for a super-talent factory","volume":"3","author":"Stecke","year":"2012","journal-title":"Int. J. Stra. Dec. Sci. (IJSDS)"},{"key":"10.1016\/j.cor.2020.104917_bib0032","doi-asserted-by":"crossref","DOI":"10.1155\/2016\/9748378","article-title":"Formulations, Features of Solution Space, and Algorithms for Line-Pure Seru System Conversion","volume":"2016","author":"Sun","year":"2016","journal-title":"Math. Probl. Eng."},{"key":"10.1016\/j.cor.2020.104917_bib0033","doi-asserted-by":"crossref","first-page":"5662","DOI":"10.1109\/ACCESS.2018.2889372","article-title":"A cooperative coevolution algorithm for the seru production with minimizing makespan","volume":"7","author":"Sun","year":"2019","journal-title":"IEEE Access"},{"key":"10.1016\/j.cor.2020.104917_bib0034","doi-asserted-by":"crossref","first-page":"956","DOI":"10.1016\/j.proeng.2013.08.172","article-title":"From jit to seru, for a production as lean as possible","volume":"63","author":"Villa","year":"2013","journal-title":"Procedia Eng."},{"key":"10.1016\/j.cor.2020.104917_bib0035","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1016\/j.jmsy.2017.07.004","article-title":"Effective layout designs for the shojinka control problem for a tft-lcd module assembly line","volume":"44","author":"Wang","year":"2017","journal-title":"J. Manuf. Syst."},{"key":"10.1016\/j.cor.2020.104917_bib0036","series-title":"14th International Conference on Services Systems and Services Management, ICSSSM 2017 - Proceedings","article-title":"Multi-objective optimization model for seru production system formation under uncertain condition","author":"Wang","year":"2017"},{"issue":"4","key":"10.1016\/j.cor.2020.104917_bib0037","doi-asserted-by":"crossref","first-page":"519","DOI":"10.1007\/s11518-018-5379-3","article-title":"Cost and service-level-based model for a seru production system formation problem with uncertain demand","volume":"27","author":"Wang","year":"2018","journal-title":"J. Syst. Sci. Syst. Eng."},{"issue":"5","key":"10.1016\/j.cor.2020.104917_bib0038","doi-asserted-by":"crossref","first-page":"1114","DOI":"10.1108\/IMDS-07-2017-0303","article-title":"Cross-trained worker assignment and comparative analysis on throughput of divisional and rotating seru","volume":"118","author":"Wu","year":"2018","journal-title":"Ind. Manag. Data Syst."},{"key":"10.1016\/j.cor.2020.104917_bib0039","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/00207543.2019.1669841","article-title":"Operational strategies for seru production system: a bi-objective optimisation model and solution methods","author":"Y\u0131lmaz","year":"2019","journal-title":"Int. J. Product. Res."},{"key":"10.1016\/j.cor.2020.104917_bib0040","first-page":"143","article-title":"A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment","author":"Yilmaz","year":"2018","journal-title":"J. Ind. Manag. Optim."},{"key":"10.1016\/j.cor.2020.104917_bib0041","doi-asserted-by":"crossref","first-page":"244","DOI":"10.1016\/j.cie.2017.10.018","article-title":"Minimizing average lead time for the coordinated scheduling problem in a two-stage supply chain with multiple customers and multiple manufacturers","volume":"114","author":"Y\u0131lmaz","year":"2017","journal-title":"Comput. Ind. Eng."},{"key":"10.1016\/j.cor.2020.104917_bib0042","series-title":"SAGE Business Cases","article-title":"The evolution of seru production systems throughout canon","author":"Yin","year":"2008"},{"key":"10.1016\/j.cor.2020.104917_bib0043","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1016\/j.jom.2017.01.003","article-title":"Lessons from seru production on manufacturing competitively in a high cost environment","volume":"49","author":"Yin","year":"2017","journal-title":"J. Oper. Manag."},{"issue":"10","key":"10.1016\/j.cor.2020.104917_bib0044","doi-asserted-by":"crossref","first-page":"2978","DOI":"10.1080\/00207543.2016.1277594","article-title":"Minimising total cost for training and assigning multiskilled workers in seru production systems","volume":"55","author":"Ying","year":"2017","journal-title":"Int. J. Product. Res."},{"key":"10.1016\/j.cor.2020.104917_bib0045","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/j.cor.2018.07.025","article-title":"A genetic algorithm for the hybrid flow shop scheduling with unrelated machines and machine eligibility","volume":"100","author":"Yu","year":"2018","journal-title":"Comput. Oper. Res."},{"issue":"2","key":"10.1016\/j.cor.2020.104917_bib0046","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1007\/s42524-019-0028-1","article-title":"Review of seru production","volume":"6","author":"Yu","year":"2019","journal-title":"Front. Eng. Manag."},{"issue":"18","key":"10.1016\/j.cor.2020.104917_bib0047","doi-asserted-by":"crossref","first-page":"5259","DOI":"10.1080\/00207543.2012.693642","article-title":"How to carry out assembly line\u2013cell conversion? A discussion based on factor analysis of system performance improvements","volume":"50","author":"Yu","year":"2012","journal-title":"Int. J. Product. Res."},{"key":"10.1016\/j.cor.2020.104917_bib0048","doi-asserted-by":"crossref","first-page":"282","DOI":"10.1016\/j.cie.2016.11.035","article-title":"Line-hybrid seru system conversion: models, complexities, properties, solutions and insights","volume":"103","author":"Yu","year":"2017","journal-title":"Comput. Ind. Eng."},{"issue":"10","key":"10.1016\/j.cor.2020.104917_bib0049","doi-asserted-by":"crossref","first-page":"2990","DOI":"10.1080\/00207543.2017.1284359","article-title":"Line-seru conversion towards reducing worker (s) without increasing makespan: models, exact and meta-heuristic solutions","volume":"55","author":"Yu","year":"2017","journal-title":"Int. J. Product. Res."},{"issue":"2","key":"10.1016\/j.cor.2020.104917_bib0050","doi-asserted-by":"crossref","first-page":"774","DOI":"10.1016\/j.ejor.2014.01.029","article-title":"Mathematical analysis and solutions for multi-objective line-cell conversion problem","volume":"236","author":"Yu","year":"2014","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"10.1016\/j.cor.2020.104917_bib0051","doi-asserted-by":"crossref","first-page":"799","DOI":"10.1016\/j.ijpe.2013.06.009","article-title":"Reducing worker (s) by converting assembly line into a pure cell system","volume":"145","author":"Yu","year":"2013","journal-title":"Int. J. Prod. Econ."},{"key":"10.1016\/j.cor.2020.104917_bib0052","doi-asserted-by":"crossref","first-page":"318","DOI":"10.1016\/j.cie.2018.05.048","article-title":"Seru system balancing: definition, formulation, and exact solution","volume":"122","author":"Yu","year":"2018","journal-title":"Comput. Ind. Eng."},{"issue":"1","key":"10.1016\/j.cor.2020.104917_bib0053","doi-asserted-by":"crossref","first-page":"809","DOI":"10.1186\/s40064-016-2445-5","article-title":"Complexity of line-seru conversion for different scheduling rules and two improved exact algorithms for the multi-objective optimization","volume":"5","author":"Yu","year":"2016","journal-title":"Springerplus"},{"key":"10.1016\/j.cor.2020.104917_bib0054","doi-asserted-by":"crossref","first-page":"290","DOI":"10.1016\/j.omega.2016.01.013","article-title":"Effects of key enabling technologies for seru production on sustainable performance","volume":"66","author":"Zhang","year":"2017","journal-title":"Omega"}],"container-title":["Computers & Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054820300344?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054820300344?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2020,4,12]],"date-time":"2020-04-12T22:09:33Z","timestamp":1586729373000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0305054820300344"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,7]]},"references-count":55,"alternative-id":["S0305054820300344"],"URL":"https:\/\/doi.org\/10.1016\/j.cor.2020.104917","relation":{},"ISSN":["0305-0548"],"issn-type":[{"value":"0305-0548","type":"print"}],"subject":[],"published":{"date-parts":[[2020,7]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Attaining flexibility in seru production system by means of Shojinka: An optimization model and solution approaches","name":"articletitle","label":"Article Title"},{"value":"Computers & Operations Research","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.cor.2020.104917","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2020 Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}],"article-number":"104917"}}