{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T07:17:31Z","timestamp":1725866251269},"reference-count":181,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T00:00:00Z","timestamp":1567296000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computers & Industrial Engineering"],"published-print":{"date-parts":[[2019,9]]},"DOI":"10.1016\/j.cie.2019.06.002","type":"journal-article","created":{"date-parts":[[2019,6,7]],"date-time":"2019-06-07T20:10:04Z","timestamp":1559938204000},"page":"286-298","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":13,"special_numbering":"C","title":["A review on optimization methods for workforce planning in electrical distribution utilities"],"prefix":"10.1016","volume":"135","author":[{"given":"Bruno S.M.C.","family":"Borba","sequence":"first","affiliation":[]},{"given":"Marcio Z.","family":"Fortes","sequence":"additional","affiliation":[]},{"given":"Leonardo A.","family":"Bitencourt","sequence":"additional","affiliation":[]},{"given":"Vitor H.","family":"Ferreira","sequence":"additional","affiliation":[]},{"given":"Renan S.","family":"Maciel","sequence":"additional","affiliation":[]},{"given":"Marcio A.R.","family":"Guimaraens","sequence":"additional","affiliation":[]},{"given":"Gilson B.A.","family":"Lima","sequence":"additional","affiliation":[]},{"given":"Eduardo U.","family":"Barboza","sequence":"additional","affiliation":[]},{"given":"Henrique O.","family":"Henriques","sequence":"additional","affiliation":[]},{"given":"Nissia C.R.","family":"Bergiante","sequence":"additional","affiliation":[]},{"given":"Bernardo S.","family":"Moreira","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.cie.2019.06.002_b0005","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.wasman.2016.05.018","article-title":"Forecasting municipal solid waste generation using artificial intelligence modelling approaches","volume":"56","author":"Abbasi","year":"2016","journal-title":"Waste Management"},{"key":"10.1016\/j.cie.2019.06.002_b0010","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/j.cie.2017.08.007","article-title":"New mathematical models and a hybrid Grouping Evolution Strategy algorithm for optimal helicopter routing and crew pickup and delivery","volume":"112","author":"Abbasi-Pooya","year":"2017","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2019.06.002_b0015","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1016\/j.ress.2012.10.011","article-title":"Application of fault tree analysis for customer reliability assessment of a distribution power system","volume":"111","author":"Abdul Rahman","year":"2013","journal-title":"Reliability Engineering & System Safety"},{"key":"10.1016\/j.cie.2019.06.002_b0020","doi-asserted-by":"crossref","unstructured":"Adiba, E. E., Aahmed, E. A., & Youssef, B. (2014, June). The green capacitated vehicle routing problem: Optimizing of emissions of greenhouse gas (pp. 161\u2013167). https:\/\/doi.org\/10.1109\/GOL.2014.6887434.","DOI":"10.1109\/GOL.2014.6887434"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0025","doi-asserted-by":"crossref","first-page":"1359","DOI":"10.1049\/oap-cired.2017.0085","article-title":"Optimal reclosing time to improve transient stability in distribution system","volume":"2017","author":"Adly","year":"2017","journal-title":"CIRED - Open Access Proceedings Journal"},{"key":"10.1016\/j.cie.2019.06.002_b0030","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/j.endm.2017.03.012","article-title":"A variable neighborhood search approach for the crew pairing problem","volume":"58","author":"Agustin","year":"2017","journal-title":"Electronic Notes in Discrete Mathematics"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0035","doi-asserted-by":"crossref","first-page":"04017113","DOI":"10.1061\/(ASCE)CO.1943-7862.0001434","article-title":"Dynamic programming approach toward optimization of workforce planning decisions","volume":"144","author":"Ahmadian Fard Fini","year":"2018","journal-title":"Journal of Construction Engineering and Management"},{"key":"10.1016\/j.cie.2019.06.002_b0040","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/j.energy.2016.02.088","article-title":"A multiyear DG-incorporated framework for expansion planning of distribution networks using binary chaotic shark smell optimization algorithm","volume":"102","author":"Ahmadigorji","year":"2016","journal-title":"Energy"},{"key":"10.1016\/j.cie.2019.06.002_b0045","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1016\/j.ress.2014.03.004","article-title":"Establishment of a maintenance plan based on quantitative analysis in the context of RCM in a JIT production scenario","volume":"127","author":"Alebrant Mendes","year":"2014","journal-title":"Reliability Engineering & System Safety"},{"issue":"1\u20134","key":"10.1016\/j.cie.2019.06.002_b0050","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1023\/B:ANOR.0000019088.98647.e2","article-title":"Survey, categorization, and comparison of recent tour scheduling literature","volume":"127","author":"Alfares","year":"2004","journal-title":"Annals of Operations Research"},{"key":"10.1016\/j.cie.2019.06.002_b0055","doi-asserted-by":"crossref","first-page":"639","DOI":"10.1109\/ACCESS.2016.2523545","article-title":"Electric power grid restoration considering disaster economics","volume":"4","author":"Arab","year":"2016","journal-title":"IEEE Access"},{"key":"10.1016\/j.cie.2019.06.002_b0060","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1109\/SmartGridComm.2014.7007627","article-title":"Dynamic maintenance scheduling for power systems incorporating hurricane effects","volume":"2014","author":"Arab","year":"2014","journal-title":"IEEE International Conference on Smart Grid Communications (SmartGridComm)"},{"issue":"5","key":"10.1016\/j.cie.2019.06.002_b0065","doi-asserted-by":"crossref","first-page":"4109","DOI":"10.1109\/TSG.2017.2650917","article-title":"Power distribution system outage management with co-optimization of repairs, reconfiguration, and DG dispatch","volume":"9","author":"Arif","year":"2018","journal-title":"IEEE Transactions on Smart Grid"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0070","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1016\/j.asoc.2012.08.012","article-title":"A hybrid meta-heuristic algorithm for optimization of crew scheduling","volume":"13","author":"Azadeh","year":"2013","journal-title":"Applied Soft Computing"},{"key":"10.1016\/j.cie.2019.06.002_b0075","doi-asserted-by":"crossref","first-page":"591","DOI":"10.1016\/j.cie.2019.01.008","article-title":"A bi-objective model for location planning of electric vehicle charging stations with GPS trajectory data","volume":"128","author":"Bai","year":"2019","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0080","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1057\/jors.1976.30","article-title":"Workforce allocation in cyclical scheduling problems: A survey","volume":"27","author":"Baker","year":"1976","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/j.cie.2019.06.002_b0085","doi-asserted-by":"crossref","first-page":"478","DOI":"10.1016\/j.ijepes.2013.05.005","article-title":"Rebuilding of three-phase load voltage during single-phase auto reclosing in medium voltage distribution lines","volume":"53","author":"Basu","year":"2013","journal-title":"International Journal of Electrical Power & Energy Systems"},{"key":"10.1016\/j.cie.2019.06.002_b0090","doi-asserted-by":"crossref","unstructured":"Bazargan-Lari, M., Gupta, P., & Young, S. (2003). A simulation approach to manpower planning (pp. 1677\u20131685). https:\/\/doi.org\/10.1109\/WSC.2003.1261619.","DOI":"10.1109\/WSC.2003.1261619"},{"key":"10.1016\/j.cie.2019.06.002_b0095","unstructured":"Belfiore, P., & F\u00e1vero, L. P. (2012). Pesquisa operacional: para cursos de engenharia. Retrieved from https:\/\/www.elsevier.com\/books\/pesquisa-operacional-para-cursos-de-engenharia\/belfiore\/978-85-352-4893-7."},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0100","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/s10288-006-0006-4","article-title":"Exact and heuristic methodologies for scheduling in hospitals: Problems, formulations and algorithms","volume":"5","author":"Beli\u00ebn","year":"2007","journal-title":"4OR"},{"key":"10.1016\/j.cie.2019.06.002_b0105","doi-asserted-by":"crossref","unstructured":"Berg, A., & Haubrich, H.-J. (2008, May). Calculation of cost-minimal resources for the operation of electrical networks (pp. 1\u20135). https:\/\/doi.org\/10.1109\/EEM.2008.4579017.","DOI":"10.1109\/EEM.2008.4579017"},{"key":"10.1016\/j.cie.2019.06.002_b0110","doi-asserted-by":"crossref","unstructured":"Biabani, M., Aliakbar Golkar, M., & Sajadi, A. (2012, May). Operation of a Multi-Agent System for Load management in smart power distribution system (pp. 525\u2013530). https:\/\/doi.org\/10.1109\/EEEIC.2012.6221433.","DOI":"10.1109\/EEEIC.2012.6221433"},{"key":"10.1016\/j.cie.2019.06.002_b0115","doi-asserted-by":"crossref","first-page":"769","DOI":"10.1016\/j.rser.2013.06.039","article-title":"Location allocation of solid biomass power plants: Case study of Vojvodina","volume":"26","author":"Boji\u0107","year":"2013","journal-title":"Renewable and Sustainable Energy Reviews"},{"key":"10.1016\/j.cie.2019.06.002_b0120","doi-asserted-by":"crossref","first-page":"971","DOI":"10.1016\/j.jclepro.2017.10.265","article-title":"Location problem of lignocellulosic bioethanol plant \u2013 Case study of Serbia","volume":"172","author":"Bojic","year":"2018","journal-title":"Journal of Cleaner Production"},{"key":"10.1016\/j.cie.2019.06.002_b0125","doi-asserted-by":"crossref","first-page":"485","DOI":"10.1016\/j.ijdrr.2017.01.017","article-title":"Facility location optimization model for emergency humanitarian logistics","volume":"24","author":"Boonmee","year":"2017","journal-title":"International Journal of Disaster Risk Reduction"},{"key":"10.1016\/j.cie.2019.06.002_b0130","doi-asserted-by":"crossref","first-page":"300","DOI":"10.1016\/j.cie.2015.12.007","article-title":"The vehicle routing problem: State of the art classification and review","volume":"99","author":"Braekers","year":"2016","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0135","doi-asserted-by":"crossref","first-page":"479","DOI":"10.1016\/j.ejor.2007.08.043","article-title":"A facility location and installation of resources model for level of repair analysis","volume":"192","author":"Brick","year":"2009","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0140","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1016\/S0377-2217(02)00364-8","article-title":"Ambulance location and relocation models","volume":"147","author":"Brotcorne","year":"2003","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2019.06.002_b0145","series-title":"2016 IEEE international conference on sustainable energy technologies (ICSET)","first-page":"147","article-title":"Optimal microgrid operation considering auto-configuration in islanded mode","author":"Bui","year":"2016"},{"key":"10.1016\/j.cie.2019.06.002_b0150","series-title":"2016 IEEE international conference on sustainable energy technologies (ICSET)","first-page":"142","article-title":"Real-time optimization for microgrid operation based on auto-configuration in grid-connected mode","author":"Bui","year":"2016"},{"issue":"6","key":"10.1016\/j.cie.2019.06.002_b0155","doi-asserted-by":"crossref","first-page":"441","DOI":"10.1023\/B:JOSH.0000046076.75950.0b","article-title":"The state of the art of nurse rostering","volume":"7","author":"Burke","year":"2004","journal-title":"Journal of Scheduling"},{"key":"10.1016\/j.cie.2019.06.002_b0160","article-title":"Assessment of forecasting models for patients arrival at Emergency Department","author":"Carvalho-Silva","year":"2017","journal-title":"Operations Research for Health Care"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0165","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1016\/j.sorms.2016.12.001","article-title":"Network restoration and recovery in humanitarian operations: Framework, literature review, and research directions","volume":"21","author":"\u00c7elik","year":"2016","journal-title":"Surveys in Operations Research and Management Science"},{"key":"10.1016\/j.cie.2019.06.002_b0170","series-title":"2017 International Conference on Applied System Innovation (ICASI)","first-page":"1036","article-title":"A fuzzy color Petri Net for repair scheduling and dispatching of large-scale contingencies in distribution system","author":"Chang","year":"2017"},{"key":"10.1016\/j.cie.2019.06.002_b0175","series-title":"2018 IEEE international conference on communications, control, and computing technologies for smart grids (SmartGridComm)","first-page":"1","article-title":"DER Allocation and Line Repair Scheduling for Storm-induced Failures in Distribution Networks","author":"Chang","year":"2018"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0180","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/j.seps.2012.02.003","article-title":"Locating fire stations: An integrated approach for Belgium","volume":"46","author":"Chevalier","year":"2012","journal-title":"Socio-Economic Planning Sciences"},{"key":"10.1016\/j.cie.2019.06.002_b0185","series-title":"2018 IEEE International Conference on Fuzzy Systems (FUZZ-IEEE)","first-page":"1","article-title":"A big-bang big-crunch type-2 fuzzy logic system for generating interpretable models in workforce optimization","author":"Chimatapu","year":"2018"},{"key":"10.1016\/j.cie.2019.06.002_b0190","unstructured":"Cintula, P., Ferm\u00fcller, C. G., & Noguera, C. (2017). Fuzzy Logic. In E. N. Zalta (Ed.), The Stanford Encyclopedia of Philosophy (Fall 2017). Retrieved from https:\/\/plato.stanford.edu\/archives\/fall2017\/entries\/logic-fuzzy\/."},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0195","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1287\/opre.11.3.331","article-title":"Location-allocation problems","volume":"11","author":"Cooper","year":"1963","journal-title":"Operations Research"},{"key":"10.1016\/j.cie.2019.06.002_b0200","doi-asserted-by":"crossref","first-page":"2230","DOI":"10.1016\/j.procs.2017.05.174","article-title":"Firemap: A dynamic data-driven predictive wildfire modeling and visualization environment","volume":"108","author":"Crawl","year":"2017","journal-title":"Procedia Computer Science"},{"key":"10.1016\/j.cie.2019.06.002_b0205","unstructured":"da Costa, H. H. L. M. (2004). A regula\u00e7\u00e3o da Ind\u00fastria do G\u00e1s Natural no Brasil: Fatos e Desafios (Mestardo, UFRJ). Retrieved from http:\/\/www.ppe.ufrj.br\/images\/publica%C3%A7%C3%B5es\/mestrado\/Heloise_Helena_Lopes_Maia_da_Costa.pdf."},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0210","doi-asserted-by":"crossref","first-page":"80","DOI":"10.1287\/mnsc.6.1.80","article-title":"The truck dispatching problem","volume":"6","author":"Dantzig","year":"1959","journal-title":"Management Science"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0215","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2014.10.038","article-title":"Workforce planning incorporating skills: State of the art","volume":"243","author":"De Bruecker","year":"2015","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"10.1016\/j.cie.2019.06.002_b0220","doi-asserted-by":"crossref","first-page":"840","DOI":"10.1016\/j.ijepes.2010.01.030","article-title":"Optimal reconfiguration and capacitor allocation in radial distribution systems for energy losses minimization","volume":"32","author":"de Oliveira","year":"2010","journal-title":"International Journal of Electrical Power & Energy Systems"},{"key":"10.1016\/j.cie.2019.06.002_b0225","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1016\/j.cie.2017.11.022","article-title":"Evolutionary algorithms for solving the airline crew pairing problem","volume":"115","author":"Deveci","year":"2018","journal-title":"Computers & Industrial Engineering"},{"issue":"5","key":"10.1016\/j.cie.2019.06.002_b0230","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1016\/S0307-904X(98)10009-4","article-title":"A stochastic programming model for scheduling maintenance personnel","volume":"23","author":"Duffuaa","year":"1999","journal-title":"Applied Mathematical Modelling"},{"key":"10.1016\/j.cie.2019.06.002_b0235","doi-asserted-by":"crossref","unstructured":"Elkhyari, A., & Bellabdaoui, A. (2017, April). Combining constraint programming and genetic algorithm for dynamic scheduling problems (pp. 19\u201324). https:\/\/doi.org\/10.1109\/LOGISTIQUA.2017.7962867.","DOI":"10.1109\/LOGISTIQUA.2017.7962867"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0240","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(03)00095-X","article-title":"Staff scheduling and rostering: A review of applications, methods and models","volume":"153","author":"Ernst","year":"2004","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"10.1016\/j.cie.2019.06.002_b0245","doi-asserted-by":"crossref","first-page":"1689","DOI":"10.1016\/j.apm.2009.10.005","article-title":"Multiple criteria facility location problems: A survey","volume":"34","author":"Farahani","year":"2010","journal-title":"Applied Mathematical Modelling"},{"key":"10.1016\/j.cie.2019.06.002_b0250","unstructured":"Ferreira, R. J. P. (2006). Modelos de decis\u00e3o para dimensionamento de equipes de manuten\u00e7\u00e3o (Mestardo, UFPE). Retrieved from https:\/\/repositorio.ufpe.br\/bitstream\/123456789\/5754\/1\/arquivo7331_1.pdf."},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0255","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1016\/j.seps.2011.10.001","article-title":"Incorporating recycling into post-disaster debris disposal","volume":"46","author":"Fetter","year":"2012","journal-title":"Socio-Economic Planning Sciences"},{"key":"10.1016\/j.cie.2019.06.002_b0260","doi-asserted-by":"crossref","first-page":"188","DOI":"10.1016\/j.epsr.2018.04.007","article-title":"Resiliency-based optimization of restoration policies for electric power distribution systems","volume":"161","author":"Figueroa-Candia","year":"2018","journal-title":"Electric Power Systems Research"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0265","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1016\/j.ejor.2016.03.002","article-title":"Benders decomposition without separability: A computational study for capacitated facility location problems","volume":"253","author":"Fischetti","year":"2016","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2019.06.002_b0270","unstructured":"Fogel, L. J., Owens, A. J., & Walsh, M. J. (1966). Artificial Intelligence Through Simulated Evolution. Retrieved from https:\/\/books.google.com.br\/books?id=QMLaAAAAMAAJ."},{"key":"10.1016\/j.cie.2019.06.002_b0275","series-title":"Log\u00edstica Operacional - Aloca\u00e7\u00e3o de bases operacionais em distribui\u00e7\u00e3o de energia el\u00e9trica","author":"Fontana","year":"2015"},{"key":"10.1016\/j.cie.2019.06.002_b0280","doi-asserted-by":"crossref","unstructured":"G. Franzese, L., Fioroni, M., Pinheiro, L., & Eustachio Soares, J. (2006, December). Allocating Field Service Teams with Simulation in Energy\/Utilities Environment (pp. 516\u2013520). https:\/\/doi.org\/10.1109\/WSC.2006.323124.","DOI":"10.1109\/WSC.2006.323124"},{"key":"10.1016\/j.cie.2019.06.002_b0285","doi-asserted-by":"crossref","first-page":"1045","DOI":"10.1016\/j.sbspro.2014.01.139","article-title":"Reliability assessment by coordinating maintenance vehicles in electric power distribution systems","volume":"111","author":"Garcia","year":"2014","journal-title":"Procedia - Social and Behavioral Sciences"},{"key":"10.1016\/j.cie.2019.06.002_b0290","doi-asserted-by":"crossref","unstructured":"Garcia, Vinicius Jacques, Bernardon, D. P., Abaide, A., & Fonini, J. (2014, September). Evaluating multicriteria scenarios to schedule emergency orders in electric distribution utilities (pp. 1\u20136). https:\/\/doi.org\/10.1109\/UPEC.2014.6934780.","DOI":"10.1109\/UPEC.2014.6934780"},{"key":"10.1016\/j.cie.2019.06.002_b0295","doi-asserted-by":"crossref","unstructured":"Garcia, Vinicius Jaques, Bernardon, D. P., De Araujo Bassi, O., Abaide, A., De Melo Reck, W., Gundel, M., & Fernandes, J. (2012, September). Emergency work orders in electric distribution utilities: From business process definition to quantitative improvements (pp. 1\u20135). https:\/\/doi.org\/10.1109\/UPEC.2012.6398676.","DOI":"10.1109\/UPEC.2012.6398676"},{"key":"10.1016\/j.cie.2019.06.002_b0300","doi-asserted-by":"crossref","unstructured":"Garcia, Vinicius Jacques, Pinheiro Bernardon, D., Dhein, G., de Araujo Bassi, O., Abaide, A., Kummer Neto, A. F., \u2026 Boeck Daza, E. F. (2013, September). Multitasked maintenance crews to serve emergency scenarios in electric distribution utilities (pp. 1\u20136). https:\/\/doi.org\/10.1109\/UPEC.2013.6714900.","DOI":"10.1109\/UPEC.2013.6714900"},{"issue":"5","key":"10.1016\/j.cie.2019.06.002_b0305","doi-asserted-by":"crossref","first-page":"798","DOI":"10.1049\/iet-gtd.2013.0663","article-title":"Maintaining balanced three-phase load voltage during single-phase auto-reclosing in medium voltage distribution lines","volume":"8","author":"George","year":"2014","journal-title":"IET Generation, Transmission & Distribution"},{"issue":"7","key":"10.1016\/j.cie.2019.06.002_b0310","doi-asserted-by":"crossref","first-page":"1291","DOI":"10.1016\/j.wasman.2012.02.009","article-title":"Capacitated location of collection sites in an urban waste management system","volume":"32","author":"Ghiani","year":"2012","journal-title":"Waste Management"},{"key":"10.1016\/j.cie.2019.06.002_b0315","doi-asserted-by":"crossref","first-page":"120","DOI":"10.1016\/j.ijepes.2017.10.027","article-title":"Assessing the contribution of automation to the electric distribution network reliability","volume":"97","author":"Gir\u00f3n","year":"2018","journal-title":"International Journal of Electrical Power & Energy Systems"},{"issue":"5","key":"10.1016\/j.cie.2019.06.002_b0320","doi-asserted-by":"crossref","first-page":"563","DOI":"10.1016\/0305-0548(86)90050-X","article-title":"The general employee scheduling problem. An integration of MS and AI","volume":"13","author":"Glover","year":"1986","journal-title":"Computers & Operations Research"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0325","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/j.epsr.2005.01.003","article-title":"Faults locations in automated distribution system","volume":"75","author":"Gohokar","year":"2005","journal-title":"Electric Power Systems Research"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0330","doi-asserted-by":"crossref","first-page":"647","DOI":"10.1007\/s10589-013-9544-9","article-title":"A cutting plane algorithm for the Capacitated Connected Facility Location Problem","volume":"55","author":"Gollowitzer","year":"2013","journal-title":"Computational Optimization and Applications"},{"key":"10.1016\/j.cie.2019.06.002_b0335","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1016\/j.scs.2016.05.010","article-title":"Methodology for real impact assessment of the best location of distributed electric energy storage","volume":"26","author":"Gon\u00e7alves","year":"2016","journal-title":"Sustainable Cities and Society"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0340","doi-asserted-by":"crossref","first-page":"634","DOI":"10.1016\/j.ejor.2014.01.007","article-title":"The aircraft maintenance base location problem","volume":"236","author":"Gopalan","year":"2014","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"10.1016\/j.cie.2019.06.002_b0345","doi-asserted-by":"crossref","first-page":"551","DOI":"10.1016\/S0169-2070(03)00089-X","article-title":"Introduction to crime forecasting","volume":"19","author":"Gorr","year":"2003","journal-title":"International Journal of Forecasting"},{"issue":"4","key":"10.1016\/j.cie.2019.06.002_b0350","doi-asserted-by":"crossref","first-page":"579","DOI":"10.1016\/S0169-2070(03)00092-X","article-title":"Short-term forecasting of crime","volume":"19","author":"Gorr","year":"2003","journal-title":"International Journal of Forecasting"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0355","doi-asserted-by":"crossref","first-page":"450","DOI":"10.1287\/opre.12.3.450","article-title":"Optimum locations of switching centers and the absolute centers and medians of a graph","volume":"12","author":"Hakimi","year":"1964","journal-title":"Operations Research"},{"key":"10.1016\/j.cie.2019.06.002_b0360","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1023\/A:1026110926707","article-title":"Location science research: A review","volume":"123","author":"Hale","year":"2003","journal-title":"Annals of Operations Research"},{"key":"10.1016\/j.cie.2019.06.002_b0365","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1016\/j.tre.2017.09.005","article-title":"Sustainable urban facility location: Minimising noise pollution and network congestion","volume":"107","author":"Hammad","year":"2017","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"key":"10.1016\/j.cie.2019.06.002_b0370","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1016\/j.wasman.2017.10.019","article-title":"Capacitated vehicle-routing problem model for scheduled solid waste collection and route optimization using PSO algorithm","volume":"71","author":"Hannan","year":"2018","journal-title":"Waste Management"},{"key":"10.1016\/j.cie.2019.06.002_b0375","doi-asserted-by":"crossref","first-page":"641","DOI":"10.1016\/j.trc.2017.11.026","article-title":"An optimal charging station location model with the consideration of electric vehicle\u2019s driving range","volume":"86","author":"He","year":"2018","journal-title":"Transportation Research Part C: Emerging Technologies"},{"key":"10.1016\/j.cie.2019.06.002_b0380","series-title":"Presented at the proceedings of the 17th power systems computation conference (PSCC) 2011","article-title":"Vehicle routing for the last mile of power system restoration","author":"Hentenryck Van","year":"2011"},{"key":"10.1016\/j.cie.2019.06.002_b0385","unstructured":"Holecek, J., & Brabec, Z. (2016, December). Infrastructure operator field workforce management systems simulation possibilities (pp. 1\u20136). Retrieved from http:\/\/ieeexplore.ieee.org\/document\/7827851\/."},{"key":"10.1016\/j.cie.2019.06.002_b0390","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/j.epsr.2019.02.013","article-title":"Optimal location-allocation of storage devices and renewable-based DG in distribution systems","volume":"172","author":"Home-Ortiz","year":"2019","journal-title":"Electric Power Systems Research"},{"key":"10.1016\/j.cie.2019.06.002_b0395","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1016\/j.ijepes.2018.11.035","article-title":"Joint reconfiguration of feeders and allocation of capacitor banks in radial distribution systems considering voltage-dependent models","volume":"107","author":"Home-Ortiz","year":"2019","journal-title":"International Journal of Electrical Power & Energy Systems"},{"issue":"8","key":"10.1016\/j.cie.2019.06.002_b0400","doi-asserted-by":"crossref","first-page":"2490","DOI":"10.1016\/j.cor.2008.10.003","article-title":"SimMan\u2014A simulation model for workforce capacity planning","volume":"36","author":"Huang","year":"2009","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.cie.2019.06.002_b0405","series-title":"2018 China international conference on electricity distribution (CICED)","first-page":"901","article-title":"Research on multi-objective power emergency supplies dispatch model considering material and time satisfaction","author":"Huang","year":"2018"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0410","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1590\/S0103-65132008000100004","article-title":"Otimiza\u00e7\u00e3o da localiza\u00e7\u00e3o das bases de ambul\u00e2ncias e do dimensionamento das suas regi\u00f5es de cobertura em rodovias","volume":"18","author":"Iannoni","year":"2008","journal-title":"Production"},{"key":"10.1016\/j.cie.2019.06.002_b0415","doi-asserted-by":"crossref","first-page":"654","DOI":"10.1016\/j.sbspro.2013.08.466","article-title":"Short-term crime forecasting in Kedah","volume":"91","author":"Ismail","year":"2013","journal-title":"Procedia - Social and Behavioral Sciences"},{"key":"10.1016\/j.cie.2019.06.002_b0420","unstructured":"Jaeker, E., Felix, R., Seifert, D., & Epler, T. (2011, June). Multi-criteria Optimization in Workforce Management (pp. 1\u20135). Retrieved from http:\/\/www.cired.net\/publications\/cired2011\/part1\/papers\/CIRED2011_0362_final.pdf."},{"key":"10.1016\/j.cie.2019.06.002_b0425","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.orhc.2015.03.001","article-title":"Forecasting demand for health services: Development of a publicly available toolbox","volume":"5","author":"Jalalpour","year":"2015","journal-title":"Operations Research for Health Care"},{"key":"10.1016\/j.cie.2019.06.002_b0430","series-title":"2015 5th international conference on electric utility deregulation and restructuring and power technologies (DRPT)","first-page":"1016","article-title":"A fault location method based on reclosing in distribution systems","author":"Jia","year":"2015"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0435","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1057\/jors.1995.48","article-title":"Heuristics to schedule service engineers within time windows","volume":"46","author":"Johns","year":"1995","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/j.cie.2019.06.002_b0440","doi-asserted-by":"crossref","first-page":"752","DOI":"10.1016\/j.ijepes.2013.05.040","article-title":"Optimal placement of different type of DG sources in distribution networks","volume":"53","author":"Kansal","year":"2013","journal-title":"International Journal of Electrical Power & Energy Systems"},{"key":"10.1016\/j.cie.2019.06.002_b0445","unstructured":"Kaur, N., Singh, G., Bedi, M. S., & Bhatti, T. (2004). Evaluation of customer interruption cost for reliability planning of power systems in developing economies. Presented at the probabilistic methods applied to power systems. Retrieved from http:\/\/ieeexplore.ieee.org\/abstract\/document\/1378781\/."},{"key":"10.1016\/j.cie.2019.06.002_b0450","doi-asserted-by":"crossref","first-page":"1176","DOI":"10.1016\/j.apenergy.2016.06.125","article-title":"Optimal siting and sizing of distribution system operator owned EV parking lots","volume":"179","author":"Kazemi","year":"2016","journal-title":"Applied Energy"},{"key":"10.1016\/j.cie.2019.06.002_b0455","doi-asserted-by":"crossref","first-page":"591","DOI":"10.1016\/j.trc.2017.10.016","article-title":"Short-term forecasting of passenger demand under on-demand ride services: A spatio-temporal deep learning approach","volume":"85","author":"Ke","year":"2017","journal-title":"Transportation Research Part C: Emerging Technologies"},{"key":"10.1016\/j.cie.2019.06.002_b0460","doi-asserted-by":"crossref","unstructured":"Kellett, N. (2005). The advances of integrated geospatial application in workforce management and field service optimization. 2005, v3-21-v3-21. https:\/\/doi.org\/10.1049\/cp:20051117.","DOI":"10.1049\/cp:20051117"},{"key":"10.1016\/j.cie.2019.06.002_b0465","doi-asserted-by":"crossref","first-page":"471","DOI":"10.1016\/j.renene.2018.08.032","article-title":"Multi-objective stochastic model for joint optimal allocation of DG units and network reconfiguration from DG owner\u2019s and DisCo\u2019s perspectives","volume":"132","author":"Kianmehr","year":"2019","journal-title":"Renewable Energy"},{"key":"10.1016\/j.cie.2019.06.002_b0470","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1016\/j.simpat.2018.05.006","article-title":"Two-phase simulation-based location-allocation optimization of biomass storage distribution","volume":"86","author":"Kim","year":"2018","journal-title":"Simulation Modelling Practice and Theory"},{"key":"10.1016\/j.cie.2019.06.002_b0475","doi-asserted-by":"crossref","first-page":"510","DOI":"10.1016\/j.apm.2018.07.047","article-title":"Network repair crew scheduling for short-term disasters","volume":"64","author":"Kim","year":"2018","journal-title":"Applied Mathematical Modelling"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0480","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1016\/j.ejor.2003.10.031","article-title":"Facility location models for distribution system design","volume":"162","author":"Klose","year":"2005","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2019.06.002_b0485","doi-asserted-by":"crossref","unstructured":"Koc, A., Singhee, A., Haijing Wang, Sabharwal, A., Mueller, R., & Labut, G. (2015, July). Optimal spatio-temporal emergency crew planning for a distribution system (pp. 1\u20135). https:\/\/doi.org\/10.1109\/PESGM.2015.7286168.","DOI":"10.1109\/PESGM.2015.7286168"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0490","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/j.healthpol.2017.12.002","article-title":"The Joint Action on Health Workforce Planning and Forecasting: Results of a European programme to improve health workforce policies","volume":"122","author":"Kroezen","year":"2018","journal-title":"Health Policy"},{"key":"10.1016\/j.cie.2019.06.002_b0495","series-title":"2016 13th international conference on service systems and service management (ICSSSM)","first-page":"1","article-title":"The vehicle routing for power grid material distribution: A case study in China","author":"Lai","year":"2016"},{"key":"10.1016\/j.cie.2019.06.002_b0500","series-title":"Presented at the proc 2nd int workshop successful strategies in supply chain management, Hong Kong","article-title":"Models and methods for emergency response logistics in electric distribution systems","author":"Langevin","year":"2009"},{"key":"10.1016\/j.cie.2019.06.002_b0505","series-title":"2006 international conference on probabilistic methods applied to power systems","first-page":"1","article-title":"Resource management for distribution system maintenance using optimized risk reduction","author":"Li","year":"2006"},{"issue":"10","key":"10.1016\/j.cie.2019.06.002_b0510","doi-asserted-by":"crossref","first-page":"1044","DOI":"10.1016\/j.apenergy.2007.02.012","article-title":"Four-day service-staff work-week in order to complete maintenance operations more effectively in a Nigerian power-generating station","volume":"84","author":"Lilly","year":"2007","journal-title":"Applied Energy"},{"key":"10.1016\/j.cie.2019.06.002_b0515","first-page":"1","article-title":"Solving a location, allocation, and capacity planning problem with dynamic demand and response time service level","volume":"2014","author":"Lin","year":"2014","journal-title":"Mathematical Problems in Engineering"},{"issue":"10","key":"10.1016\/j.cie.2019.06.002_b0520","doi-asserted-by":"crossref","first-page":"987","DOI":"10.1016\/S0305-0548(99)00072-6","article-title":"Development of a workforce management system for a customer hotline service","volume":"27","author":"Lin","year":"2000","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.cie.2019.06.002_b0525","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1109\/APAP.2011.6180425","article-title":"Impacts of DG on automatic reclosing of distribution networks","volume":"2011","author":"Liu","year":"2011","journal-title":"International Conference on Advanced Power System Automation and Protection"},{"key":"10.1016\/j.cie.2019.06.002_b0530","doi-asserted-by":"crossref","first-page":"560","DOI":"10.1016\/j.energy.2018.09.028","article-title":"Allocation optimization of electric vehicle charging station (EVCS) considering with charging satisfaction and distributed renewables integration","volume":"164","author":"Liu","year":"2018","journal-title":"Energy"},{"issue":"4","key":"10.1016\/j.cie.2019.06.002_b0535","doi-asserted-by":"crossref","first-page":"855","DOI":"10.1016\/S0360-8352(99)00168-0","article-title":"A facility location allocation model for reusing carpet materials","volume":"36","author":"Louwers","year":"1999","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0540","first-page":"16","article-title":"Large scale storm outage management","volume":"2004","author":"Lubkeman","year":"2004","journal-title":"IEEE Power Engineering Society General Meeting"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0545","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1108\/13552510210439829","article-title":"An analysis of personnel capacity requirement in the maintenance department by using a simulation method","volume":"8","author":"Mjema","year":"2002","journal-title":"Journal of Quality in Maintenance Engineering"},{"key":"10.1016\/j.cie.2019.06.002_b0550","doi-asserted-by":"crossref","first-page":"40","DOI":"10.1016\/j.tre.2018.01.004","article-title":"Grain silo location-allocation problem with dwell time for optimization of food grain supply chain network","volume":"111","author":"Mogale","year":"2018","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"key":"10.1016\/j.cie.2019.06.002_b0555","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1109\/EPDC.2018.8536269","article-title":"A new heuristic method for distribution network restoration and load elimination using genetic algorithm","volume":"2018","author":"Molaali","year":"2018","journal-title":"Electrical Power Distribution Conference (EPDC)"},{"key":"10.1016\/j.cie.2019.06.002_b0560","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/j.ijepes.2018.07.064","article-title":"Design and real-time implementation of a PMU-based adaptive auto-reclosing scheme for distribution networks","volume":"105","author":"Monadi","year":"2019","journal-title":"International Journal of Electrical Power & Energy Systems"},{"key":"10.1016\/j.cie.2019.06.002_b0565","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/j.trb.2018.10.001","article-title":"Work crew routing problem for infrastructure network restoration","volume":"118","author":"Morshedlou","year":"2018","journal-title":"Transportation Research Part B: Methodological"},{"key":"10.1016\/j.cie.2019.06.002_b0570","unstructured":"Moura, L., & Melo, M. (2012). Otimiza\u00e7\u00e3o da log\u00edstica das equipes do plant\u00e3o atrav\u00e9s da aplica\u00e7\u00e3o da teoria das filas - Caso Celpe (pp. 1\u20139). Retrieved from http:\/\/www.mfap.com.br\/pesquisa\/arquivos\/20121217141222-1222.pdf."},{"key":"10.1016\/j.cie.2019.06.002_b0575","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1016\/j.firesaf.2013.03.002","article-title":"Optimising the spatial location of urban fire stations","volume":"62","author":"Murray","year":"2013","journal-title":"Fire Safety Journal"},{"key":"10.1016\/j.cie.2019.06.002_b0580","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1016\/j.compchemeng.2017.05.002","article-title":"The effect of Sales and Operations Planning (S&OP) on supply chain\u2019s total performance: A case study in an Iranian dairy company","volume":"104","author":"Nemati","year":"2017","journal-title":"Computers & Chemical Engineering"},{"key":"10.1016\/j.cie.2019.06.002_b0585","doi-asserted-by":"crossref","unstructured":"Nesi, J. L., Molina, F. H., & Eggers, G. O. (2013). Multicriteria model for sizing the workforce of electricians in a power utility (pp. 0626\u20130626). https:\/\/doi.org\/10.1049\/cp.2013.0846.","DOI":"10.1049\/cp.2013.0846"},{"key":"10.1016\/j.cie.2019.06.002_b0590","doi-asserted-by":"crossref","first-page":"494","DOI":"10.1016\/j.wasman.2016.10.016","article-title":"A proposal to improve e-waste collection efficiency in urban mining: Container loading and vehicle routing problems \u2013 A case study of Poland","volume":"60","author":"Nowakowski","year":"2017","journal-title":"Waste Management"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0595","doi-asserted-by":"crossref","first-page":"794","DOI":"10.1016\/j.ejor.2012.07.010","article-title":"Restoring infrastructure systems: An integrated network design and scheduling (INDS) problem","volume":"223","author":"Nurre","year":"2012","journal-title":"European Journal of Operational Research"},{"issue":"22","key":"10.1016\/j.cie.2019.06.002_b0600","doi-asserted-by":"crossref","first-page":"8850","DOI":"10.1016\/j.eswa.2015.07.039","article-title":"An evolutionary multi-objective optimization approach to disaster waste management: A case study of Istanbul, Turkey","volume":"42","author":"Onan","year":"2015","journal-title":"Expert Systems with Applications"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0605","doi-asserted-by":"crossref","first-page":"791","DOI":"10.1016\/j.ejor.2017.10.019","article-title":"Multi-level facility location problems","volume":"267","author":"Ortiz-Astorquiza","year":"2018","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"10.1016\/j.cie.2019.06.002_b0610","doi-asserted-by":"crossref","first-page":"1096","DOI":"10.1016\/j.cie.2012.06.015","article-title":"Integrating workers\u2019 differences into workforce planning","volume":"63","author":"Othman","year":"2012","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0615","doi-asserted-by":"crossref","first-page":"952","DOI":"10.1016\/j.ejor.2007.01.064","article-title":"Furniture supply chain tactical planning optimization using a time decomposition approach","volume":"189","author":"Ouhimmou","year":"2008","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2019.06.002_b0620","unstructured":"Paragon (n.d.). Projeto Cemig. Retrieved March 13, 2018, from Paragon website: http:\/\/www.paragon.com.br\/cases\/cemig\/."},{"issue":"7","key":"10.1016\/j.cie.2019.06.002_b0625","doi-asserted-by":"crossref","first-page":"1907","DOI":"10.1016\/j.cor.2012.09.009","article-title":"A survey of models and algorithms for emergency response logistics in electric distribution systems. Part II: Contingency planning level","volume":"40","author":"Perrier","year":"2013","journal-title":"Computers & Operations Research"},{"issue":"7","key":"10.1016\/j.cie.2019.06.002_b0630","doi-asserted-by":"crossref","first-page":"1895","DOI":"10.1016\/j.cor.2013.01.016","article-title":"A survey of models and algorithms for emergency response logistics in electric distribution systems. Part I: Reliability planning with fault considerations","volume":"40","author":"Perrier","year":"2013","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.cie.2019.06.002_b0635","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1016\/j.jnca.2015.10.014","article-title":"Enabling group communication for public safety in LTE-Advanced networks","volume":"62","author":"Prasad","year":"2016","journal-title":"Journal of Network and Computer Applications"},{"key":"10.1016\/j.cie.2019.06.002_b0640","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/j.cor.2016.11.020","article-title":"A new heuristic branching scheme for the crew pairing problem with base constraints","volume":"80","author":"Quesnel","year":"2017","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.cie.2019.06.002_b0645","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/j.tre.2018.02.005","article-title":"System modeling of demand responsive transportation services: Evaluating cost efficiency of service and coordinated taxi usage","volume":"112","author":"Rahimi","year":"2018","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"key":"10.1016\/j.cie.2019.06.002_b0650","doi-asserted-by":"crossref","first-page":"232","DOI":"10.1016\/j.epsr.2013.08.019","article-title":"A fuzzy-based approach for optimal allocation and sizing of capacitor banks","volume":"106","author":"Ramadan","year":"2014","journal-title":"Electric Power Systems Research"},{"key":"10.1016\/j.cie.2019.06.002_b0655","series-title":"2017 14th IEEE India council international conference (INDICON)","first-page":"1","article-title":"A fuzzy based crew selection and dispatch system for distribution system restoration after natural disasters","author":"Reddy","year":"2017"},{"key":"10.1016\/j.cie.2019.06.002_b0660","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1016\/j.ress.2016.03.007","article-title":"Using data envelopment analysis to evaluate the performance of post-hurricane electric power restoration activities","volume":"152","author":"Reilly","year":"2016","journal-title":"Reliability Engineering & System Safety"},{"key":"10.1016\/j.cie.2019.06.002_b0665","doi-asserted-by":"crossref","first-page":"548","DOI":"10.1016\/j.energy.2019.02.015","article-title":"Location of electric vehicle charging stations: A perspective using the grey decision-making model","volume":"173","author":"Ren","year":"2019","journal-title":"Energy"},{"key":"10.1016\/j.cie.2019.06.002_b0670","doi-asserted-by":"crossref","first-page":"893","DOI":"10.1016\/j.rser.2015.11.086","article-title":"Allocation of distributed generation units in electric power systems: A review","volume":"56","author":"Rezaee Jordehi","year":"2016","journal-title":"Renewable and Sustainable Energy Reviews"},{"key":"10.1016\/j.cie.2019.06.002_b0675","doi-asserted-by":"crossref","first-page":"224","DOI":"10.1016\/j.apgeog.2017.12.011","article-title":"Establishment of a wildfire forecasting system based on coupled weather\u2013Wildfire modeling","volume":"90","author":"Rim","year":"2018","journal-title":"Applied Geography"},{"key":"10.1016\/j.cie.2019.06.002_b0680","series-title":"Handbook of constraint programming","year":"2006"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0685","doi-asserted-by":"crossref","first-page":"442","DOI":"10.1109\/TPWRS.2011.2166090","article-title":"Workforce planning for power restoration: An integrated simulation-optimization approach","volume":"27","author":"Safaei","year":"2012","journal-title":"IEEE Transactions on Power Systems"},{"issue":"6","key":"10.1016\/j.cie.2019.06.002_b0690","doi-asserted-by":"crossref","first-page":"1221","DOI":"10.1016\/j.tre.2011.05.013","article-title":"Tactical crew planning in railways","volume":"47","author":"\u015eahin","year":"2011","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"key":"10.1016\/j.cie.2019.06.002_b0695","doi-asserted-by":"crossref","first-page":"136","DOI":"10.1016\/j.ress.2017.03.002","article-title":"Maintenance optimization for power distribution systems subjected to hurricane hazard, timber decay and climate change","volume":"168","author":"Salman","year":"2017","journal-title":"Reliability Engineering & System Safety"},{"issue":"1\u20132","key":"10.1016\/j.cie.2019.06.002_b0700","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1016\/0360-8352(96)00153-2","article-title":"Power restoration in emergency situations","volume":"31","author":"Sarker","year":"1996","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2019.06.002_b0705","doi-asserted-by":"crossref","first-page":"447","DOI":"10.1016\/j.apm.2017.11.010","article-title":"Optimal number and location of storage hubs and biogas production reactors in farmlands with allocation of multiple feedstocks","volume":"55","author":"Sarker","year":"2018","journal-title":"Applied Mathematical Modelling"},{"key":"10.1016\/j.cie.2019.06.002_b0710","doi-asserted-by":"crossref","unstructured":"Sauerbach, O., Mathis, P., & Nilges, J. (2009). Benefits of highly integrated workforce management concepts (pp. 691\u2013691). https:\/\/doi.org\/10.1049\/cp.2009.0924.","DOI":"10.1049\/cp.2009.0924"},{"key":"10.1016\/j.cie.2019.06.002_b0715","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.epsr.2018.12.013","article-title":"Matheuristic for emergency response in the electric distribution system with unforeseen islanding","volume":"169","author":"Schmitz","year":"2019","journal-title":"Electric Power Systems Research"},{"key":"10.1016\/j.cie.2019.06.002_b0720","doi-asserted-by":"crossref","unstructured":"Sedaghat, B., & Hosseini, S. H. (2010). Maintenance Crew Placement for Reliable Distribution Network: Using \u201cGeographic Information Systems\u201d (pp. 1\u20136). https:\/\/doi.org\/10.1109\/APPEEC.2010.5448154.","DOI":"10.1109\/APPEEC.2010.5448154"},{"key":"10.1016\/j.cie.2019.06.002_b0725","series-title":"IEEE PES ISGT Europe 2013","first-page":"1","article-title":"Utilizing SCADA and IEC 61850 for real-time MV\/LV network monitoring","author":"Shengye","year":"2013"},{"key":"10.1016\/j.cie.2019.06.002_b0730","doi-asserted-by":"crossref","first-page":"379","DOI":"10.1007\/978-3-642-29828-8_25","article-title":"Randomized Adaptive Vehicle Decomposition for Large-Scale Power Restoration","volume":"Vol. 7298","author":"Simon","year":"2012","journal-title":"Integration of AI and OR Techniques in Contraint Programming for Combinatorial Optimzation Problems"},{"key":"10.1016\/j.cie.2019.06.002_b0735","unstructured":"Sinclair, A. (2004). Workforce Planning: A literature review. Retrieved from http:\/\/www.employment-studies.co.uk\/system\/files\/resources\/files\/mp37.pdf."},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0740","doi-asserted-by":"crossref","first-page":"1267","DOI":"10.1016\/j.ijepes.2012.06.059","article-title":"Optimal allocation of capacitors in distribution systems using particle swarm optimization","volume":"43","author":"Singh","year":"2012","journal-title":"International Journal of Electrical Power & Energy Systems"},{"key":"10.1016\/j.cie.2019.06.002_b0745","doi-asserted-by":"crossref","first-page":"390","DOI":"10.1016\/j.ins.2015.09.014","article-title":"A multi-objective genetic type-2 fuzzy logic based system for mobile field workforce area optimization","volume":"329","author":"Starkey","year":"2016","journal-title":"Information Sciences"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0750","doi-asserted-by":"crossref","first-page":"502","DOI":"10.1109\/TFUZZ.2018.2862394","article-title":"iPatch: A many-objective type-2 fuzzy logic system for field workforce optimization","volume":"27","author":"Starkey","year":"2019","journal-title":"IEEE Transactions on Fuzzy Systems"},{"key":"10.1016\/j.cie.2019.06.002_b0755","unstructured":"Steiner, M., Einhardt da Silva Costa, C., Maria Berthodi Costa, D., Andretta Filho, \u00c9., & Zambenedetti, V. (2009). T\u00e9cnicas da pesquisa operacional aplicadas \u00e0 log\u00edstica de atendimento aos usu\u00e1rios de uma rede de distribui\u00e7\u00e3o de energia el\u00e9trica (Vol. 1)."},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0760","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1023\/B:HCMS.0000005399.23600.69","article-title":"Determining location and size of medical departments in a hospital network: A multiobjective decision support approach","volume":"7","author":"Stummer","year":"2004","journal-title":"Health Care Management Science"},{"issue":"5","key":"10.1016\/j.cie.2019.06.002_b0765","doi-asserted-by":"crossref","first-page":"1000","DOI":"10.1109\/21.59965","article-title":"An integrated approach for modeling uncertainty in aggregate production planning","volume":"20","author":"Thompson","year":"1990","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics"},{"key":"10.1016\/j.cie.2019.06.002_b0770","doi-asserted-by":"crossref","first-page":"835","DOI":"10.1016\/j.firesaf.2017.03.085","article-title":"An integrated approach for tactical monitoring and data-driven spread forecasting of wildfires","volume":"91","author":"Valero","year":"2017","journal-title":"Fire Safety Journal"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0775","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1016\/j.ejor.2012.11.029","article-title":"Personnel scheduling: A literature review","volume":"226","author":"Van den Bergh","year":"2013","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2019.06.002_b0780","doi-asserted-by":"crossref","unstructured":"Wan, H., Chen, F. F., & Kuringer, G. W. (2011). An intelligent decision support system for workforce forecast. Retrieved from University of Texas website: http:\/\/www.dtic.mil\/dtic\/tr\/fulltext\/u2\/a537920.pdf.","DOI":"10.21236\/ADA537920"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0785","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1016\/S0377-2217(02)00803-2","article-title":"Resource planning and a depot location model for electric power restoration","volume":"155","author":"Wang","year":"2004","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"10.1016\/j.cie.2019.06.002_b0790","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1016\/0305-0483(85)90058-1","article-title":"Discrete simulation modelling for corporate manpower planning","volume":"13","author":"Wegner","year":"1985","journal-title":"Omega"},{"issue":"7","key":"10.1016\/j.cie.2019.06.002_b0795","doi-asserted-by":"crossref","first-page":"690","DOI":"10.1057\/palgrave.jors.2600746","article-title":"An emergency vehicle dispatching system for an electric utility in Chile","volume":"50","author":"Weintraub","year":"1999","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/j.cie.2019.06.002_b0800","series-title":"Predictive storm damage modeling and optimizing crew response to improve storm response operations","author":"Whipple","year":"2014"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0805","doi-asserted-by":"crossref","first-page":"250","DOI":"10.1016\/j.ejor.2017.11.008","article-title":"Strategic workforce planning in healthcare: A multi-methodology approach","volume":"267","author":"Willis","year":"2018","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2019.06.002_b0810","doi-asserted-by":"crossref","unstructured":"Wu, J.-S., Lee, T.-E., & Cao, C.-H. (2009, May). Intelligent crew and outage scheduling in electrical distribution system by hybrid generic algorithm (pp. 96\u2013101). https:\/\/doi.org\/10.1109\/ICIEA.2009.5138177.","DOI":"10.1109\/ICIEA.2009.5138177"},{"key":"10.1016\/j.cie.2019.06.002_b0815","doi-asserted-by":"crossref","unstructured":"Wu, J. S., Lee, T. E., Tsai, C. T., Chang, T. H., & Tsai, S. H. (2004). A fuzzy rule-based system for crew management of distribution systems in large-scale multiple outages (Vol. 2, pp. 1084\u20131089). https:\/\/doi.org\/10.1109\/ICPST.2004.1460162.","DOI":"10.1109\/ICPST.2004.1460162"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0820","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1002\/eqe.623","article-title":"Optimizing scheduling of post-earthquake electric power restoration tasks","volume":"36","author":"Xu","year":"2007","journal-title":"Earthquake Engineering & Structural Dynamics"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0825","doi-asserted-by":"crossref","first-page":"903","DOI":"10.1016\/j.ejor.2006.07.003","article-title":"A fuzzy multi-objective programming for optimization of fire station locations through genetic algorithms","volume":"181","author":"Yang","year":"2007","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0830","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1109\/17.658661","article-title":"Repair-unit location models for power failures","volume":"45","author":"Yao","year":"1998","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"6","key":"10.1016\/j.cie.2019.06.002_b0835","doi-asserted-by":"crossref","first-page":"834","DOI":"10.1049\/iet-gtd:20080030","article-title":"Optimal generator maintenance scheduling using a modified discrete PSO","volume":"2","author":"Yare","year":"2008","journal-title":"IET Generation, Transmission & Distribution"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0840","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1109\/TPWRS.2008.919316","article-title":"Risk-based allocation of distribution system maintenance resources","volume":"23","author":"Yeddanapudi","year":"2008","journal-title":"IEEE Transactions on Power Systems"},{"key":"10.1016\/j.cie.2019.06.002_b0845","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/j.wasman.2015.10.020","article-title":"Landfill area estimation based on integrated waste disposal options and solid waste forecasting using modified ANFIS model","volume":"55","author":"Younes","year":"2016","journal-title":"Waste Management"},{"key":"10.1016\/j.cie.2019.06.002_b0850","first-page":"70","article-title":"Concentrated delivery strategy research focused on electric maintenance materials","volume":"5","author":"Yu","year":"2017","journal-title":"Logistics Sci-Tech"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0855","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1016\/j.ejor.2004.11.028","article-title":"Modeling and solving a Crew Assignment Problem in air transportation","volume":"175","author":"Zeghal","year":"2006","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2019.06.002_b0860","doi-asserted-by":"crossref","first-page":"336","DOI":"10.1016\/j.ijepes.2014.12.010","article-title":"Optimal multi objective placement and sizing of multiple DGs and shunt capacitor banks simultaneously considering load uncertainty via MOPSO approach","volume":"67","author":"Zeinalzadeh","year":"2015","journal-title":"International Journal of Electrical Power & Energy Systems"},{"key":"10.1016\/j.cie.2019.06.002_b0865","first-page":"54","article-title":"Design of power supplies emergency distribution system optimal path model","volume":"5","author":"Zhang","year":"2012","journal-title":"Logistics Sci-Tech"},{"key":"10.1016\/j.cie.2019.06.002_b0870","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1016\/j.jclepro.2019.02.167","article-title":"A novel location-routing problem in electric vehicle transportation with stochastic demands","volume":"221","author":"Zhang","year":"2019","journal-title":"Journal of Cleaner Production"},{"key":"10.1016\/j.cie.2019.06.002_b0875","doi-asserted-by":"crossref","first-page":"2604","DOI":"10.1016\/j.egypro.2017.12.199","article-title":"Reliability improvement using ant colony optimization applied to placement of sectionalizing switches","volume":"142","author":"Zhang","year":"2017","journal-title":"Energy Procedia"},{"key":"10.1016\/j.cie.2019.06.002_b0880","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/j.tre.2017.08.002","article-title":"Manpower allocation and vehicle routing problem in non-emergency ambulance transfer service","volume":"106","author":"Zhang","year":"2017","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"key":"10.1016\/j.cie.2019.06.002_b0885","doi-asserted-by":"crossref","unstructured":"Zhao, X., Zhao, X., Shen, Q., Yang, J., Yang, W., & Xie, X. (2017, July). Application of particle swarm optimization algorithm in area target fire assignment (pp. 770\u2013775). https:\/\/doi.org\/10.1109\/ICMIC.2017.8321558.","DOI":"10.1109\/ICMIC.2017.8321558"},{"key":"10.1016\/j.cie.2019.06.002_b0890","series-title":"2018 China International Conference on Electricity Distribution (CICED)","first-page":"317","article-title":"Research and application of on-site operation of power materials warehouse based on internet of things plus","author":"Zhong-Zheng","year":"2018"},{"issue":"1","key":"10.1016\/j.cie.2019.06.002_b0895","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/S0360-8352(03)00021-4","article-title":"New stochastic models for capacitated location-allocation problem","volume":"45","author":"Zhou","year":"2003","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2019.06.002_b0900","doi-asserted-by":"crossref","unstructured":"Zhou, Q., Zhang, J., & Song, Z. (2016, September). Optimized maintenance scheduling considering customer sensitivity to service interruptions (pp. 1\u20135). https:\/\/doi.org\/10.1109\/TDCLLM.2016.8013235.","DOI":"10.1109\/TDCLLM.2016.8013235"},{"issue":"2","key":"10.1016\/j.cie.2019.06.002_b0905","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1109\/17.669744","article-title":"An integrated framework for managing emergency-response logistics: The case of the electric utility companies","volume":"45","author":"Zografos","year":"1998","journal-title":"IEEE Transactions on Engineering Management"}],"container-title":["Computers & Industrial Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835219303274?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835219303274?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,9,10]],"date-time":"2019-09-10T07:39:32Z","timestamp":1568101172000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0360835219303274"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,9]]},"references-count":181,"alternative-id":["S0360835219303274"],"URL":"https:\/\/doi.org\/10.1016\/j.cie.2019.06.002","relation":{},"ISSN":["0360-8352"],"issn-type":[{"value":"0360-8352","type":"print"}],"subject":[],"published":{"date-parts":[[2019,9]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"A review on optimization methods for workforce planning in electrical distribution utilities","name":"articletitle","label":"Article Title"},{"value":"Computers & Industrial Engineering","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.cie.2019.06.002","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2019 Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}]}}