{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,29]],"date-time":"2024-08-29T05:49:01Z","timestamp":1724910541129},"reference-count":34,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2017,9,1]],"date-time":"2017-09-01T00:00:00Z","timestamp":1504224000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["71571196"],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100003453","name":"Natural Science Foundation of Guangdong","doi-asserted-by":"publisher","award":["2014A030313149"],"id":[{"id":"10.13039\/501100003453","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computers & Industrial Engineering"],"published-print":{"date-parts":[[2017,9]]},"DOI":"10.1016\/j.cie.2017.07.035","type":"journal-article","created":{"date-parts":[[2017,7,26]],"date-time":"2017-07-26T18:17:01Z","timestamp":1501093021000},"page":"391-402","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":44,"special_numbering":"C","title":["Condition-based maintenance under performance-based contracting"],"prefix":"10.1016","volume":"111","author":[{"ORCID":"http:\/\/orcid.org\/0000-0003-0696-2924","authenticated-orcid":false,"given":"Yisha","family":"Xiang","sequence":"first","affiliation":[]},{"given":"Zhicheng","family":"Zhu","sequence":"additional","affiliation":[]},{"given":"David W.","family":"Coit","sequence":"additional","affiliation":[]},{"given":"Qianmei","family":"Feng","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.cie.2017.07.035_b0005","doi-asserted-by":"crossref","first-page":"54","DOI":"10.1016\/j.ress.2016.08.009","article-title":"A review on condition-based maintenance optimization models for stochastically deteriorating system","volume":"157","author":"Alaswad","year":"2017","journal-title":"Reliability Engineering & System Safety"},{"key":"10.1016\/j.cie.2017.07.035_b0010","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1016\/S0951-8320(02)00017-0","article-title":"Simulation modelling of repairable multi-component deteriorating systems for \u2018on condition\u2019maintenance optimisation","volume":"76","author":"Barata","year":"2002","journal-title":"Reliability Engineering & System Safety"},{"key":"10.1016\/j.cie.2017.07.035_b0015","series-title":"Nonlinear programming: Theory and algorithms","author":"Bazaraa","year":"2006"},{"key":"10.1016\/j.cie.2017.07.035_b0020","unstructured":"Berkowitz, D., Gupta, J. N., Simpson, J. T., & McWilliams, J. B. (2005) Defining and implementing performance-based logistics in government. DTIC Document."},{"key":"10.1016\/j.cie.2017.07.035_b0025","first-page":"4296","article-title":"Maintenance cost optimization in condition based maintenance: A case study for critical facilities","volume":"5","author":"De Carlo","year":"2013","journal-title":"International Journal of Engineering and Technology"},{"issue":"3","key":"10.1016\/j.cie.2017.07.035_b0030","first-page":"42","article-title":"Service management: Building profits after the sale","volume":"7","author":"Dennis","year":"2003","journal-title":"Supply Chain Management Review"},{"key":"10.1016\/j.cie.2017.07.035_b0035","unstructured":"Devries, H. J. (2005). Performance-based logistics-barriers and enablers to effective implementation. DTIC Document."},{"key":"10.1016\/j.cie.2017.07.035_b0040","doi-asserted-by":"crossref","first-page":"960","DOI":"10.1007\/s00170-008-1415-7","article-title":"Selection of optimal precision levels and specifications considering measurement error","volume":"40","author":"Feng","year":"2009","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"10.1016\/j.cie.2017.07.035_b0045","doi-asserted-by":"crossref","first-page":"905","DOI":"10.1016\/j.ress.2008.10.001","article-title":"A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis","volume":"94","author":"Ferreira","year":"2009","journal-title":"Reliability Engineering & System Safety"},{"key":"10.1016\/j.cie.2017.07.035_b0050","doi-asserted-by":"crossref","first-page":"1814","DOI":"10.1016\/j.ress.2008.03.020","article-title":"On the use of on-line detection for maintenance of gradually deteriorating systems","volume":"93","author":"Fouladirad","year":"2008","journal-title":"Reliability Engineering & System Safety"},{"key":"10.1016\/j.cie.2017.07.035_b0055","doi-asserted-by":"crossref","first-page":"961","DOI":"10.1287\/mnsc.1110.1465","article-title":"Impact of performance-based contracting on product reliability: An empirical analysis","volume":"58","author":"Guajardo","year":"2012","journal-title":"Management Science"},{"key":"10.1016\/j.cie.2017.07.035_b0060","doi-asserted-by":"crossref","first-page":"497","DOI":"10.1016\/j.ress.2010.12.018","article-title":"A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events","volume":"96","author":"Huynh","year":"2011","journal-title":"Reliability Engineering & System Safety"},{"key":"10.1016\/j.cie.2017.07.035_b0065","doi-asserted-by":"crossref","unstructured":"Jardine, A. K. S. (2002). Optimizing condition based maintenance decisions. In Reliability and maintainability symposium, 2002. Proceedings. Annual (pp. 90\u201397).","DOI":"10.1109\/RAMS.2002.981625"},{"key":"10.1016\/j.cie.2017.07.035_b0070","series-title":"Burn-in","author":"Jensen","year":"1982"},{"key":"10.1016\/j.cie.2017.07.035_b0075","doi-asserted-by":"crossref","first-page":"208","DOI":"10.1016\/j.ress.2009.09.012","article-title":"Optimization of alarm threshold and sequential inspection scheme","volume":"95","author":"Jiang","year":"2010","journal-title":"Reliability Engineering & System Safety"},{"key":"10.1016\/j.cie.2017.07.035_b0080","doi-asserted-by":"crossref","first-page":"1467","DOI":"10.1057\/jors.2011.144","article-title":"Planning performance based contracts considering reliability and uncertain system usage","volume":"63","author":"Jin","year":"2012","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/j.cie.2017.07.035_b0085","series-title":"2013 Proceedings-annual reliability and maintainability symposium (RAMS)","first-page":"1","article-title":"Understanding operational availability in performance-based logistics and maintenance services","author":"Jin","year":"2013"},{"key":"10.1016\/j.cie.2017.07.035_b0090","doi-asserted-by":"crossref","first-page":"1843","DOI":"10.1287\/mnsc.1070.0741","article-title":"Performance contracting in after-sales service supply chains","volume":"53","author":"Kim","year":"2007","journal-title":"Management Science"},{"key":"10.1016\/j.cie.2017.07.035_b0095","doi-asserted-by":"crossref","first-page":"1257","DOI":"10.1109\/PROC.1983.12763","article-title":"Facing the headaches of early failures: A state-of-the-art review of burn-in decisions","volume":"71","author":"Kuo","year":"1983","journal-title":"Proceedings of the IEEE"},{"key":"10.1016\/j.cie.2017.07.035_b0100","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1023\/B:LIDA.0000036389.14073.dd","article-title":"Covariates and random effects in a gamma process model with application to degradation and failure","volume":"10","author":"Lawless","year":"2004","journal-title":"Lifetime Data Analysis"},{"key":"10.1016\/j.cie.2017.07.035_b0105","doi-asserted-by":"crossref","first-page":"821","DOI":"10.1016\/j.ejor.2005.05.017","article-title":"Maintenance of continuously monitored degrading systems","volume":"175","author":"Liao","year":"2006","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2017.07.035_b0110","doi-asserted-by":"crossref","first-page":"422","DOI":"10.1080\/0740817X.2012.690930","article-title":"Condition-based maintenance for continuously monitored degrading systems with multiple failure modes","volume":"45","author":"Liu","year":"2013","journal-title":"IIE Transactions"},{"key":"10.1016\/j.cie.2017.07.035_b0115","doi-asserted-by":"crossref","first-page":"256","DOI":"10.1016\/j.ejor.2011.04.035","article-title":"A study of repairable parts inventory system operating under performance-based contract","volume":"214","author":"Mirzahosseinian","year":"2011","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2017.07.035_b0120","doi-asserted-by":"crossref","first-page":"402","DOI":"10.1109\/TR.1979.5220657","article-title":"Imperfect preventive-maintenance","volume":"28","author":"Nakagawa","year":"1979","journal-title":"IEEE Transactions on Reliability"},{"key":"10.1016\/j.cie.2017.07.035_b0125","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1109\/TR.1979.5220624","article-title":"Optimum policies when preventive maintenance is imperfect","volume":"28","author":"Nakagawa","year":"1979","journal-title":"IEEE Transactions on Reliability"},{"key":"10.1016\/j.cie.2017.07.035_b0130","doi-asserted-by":"crossref","first-page":"342","DOI":"10.1057\/palgrave.jors.2602327","article-title":"Spares provisioning under performance-based logistics contract: Profit-centric approach","volume":"59","author":"Nowicki","year":"2006","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/j.cie.2017.07.035_b0135","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/S0377-2217(96)00099-9","article-title":"Imperfect maintenance","volume":"94","author":"Pham","year":"1996","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2017.07.035_b0140","doi-asserted-by":"crossref","first-page":"324","DOI":"10.1108\/09574091111181354","article-title":"Explaining the effectiveness of performance-based logistics: A quantitative examination","volume":"22","author":"Randall","year":"2011","journal-title":"International Journal of Logistics Management, The"},{"key":"10.1016\/j.cie.2017.07.035_b0145","series-title":"Report of the quadrennial defense review","author":"Rumsfeld","year":"2001"},{"key":"10.1016\/j.cie.2017.07.035_b0150","series-title":"2004 annual symposium-RAMS Reliability and maintainability","first-page":"418","article-title":"Reliability growth planning under performance based logistics","author":"Smith","year":"2004"},{"issue":"10","key":"10.1016\/j.cie.2017.07.035_b0155","doi-asserted-by":"crossref","first-page":"1093","DOI":"10.1080\/0740817X.2014.889335","article-title":"Accelerated burn-in and condition-based maintenance for n-subpopulations subject to stochastic degradation","volume":"46","author":"Xiang","year":"2014","journal-title":"IIE Transactions"},{"key":"10.1016\/j.cie.2017.07.035_b0160","doi-asserted-by":"crossref","first-page":"360","DOI":"10.1016\/j.ejor.2012.03.028","article-title":"Degradation-based burn-in with preventive maintenance","volume":"221","author":"Ye","year":"2012","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2017.07.035_b0165","doi-asserted-by":"crossref","first-page":"921","DOI":"10.1016\/j.ress.2010.04.005","article-title":"Condition-based inspection\/replacement policies for non-monotone deteriorating systems with environmental covariates","volume":"95","author":"Zhao","year":"2010","journal-title":"Reliability Engineering & System Safety"},{"key":"10.1016\/j.cie.2017.07.035_b0170","doi-asserted-by":"crossref","first-page":"530","DOI":"10.1016\/j.ress.2006.01.006","article-title":"Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation","volume":"92","author":"Zhou","year":"2007","journal-title":"Reliability Engineering & System Safety"}],"container-title":["Computers & Industrial Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835217303364?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835217303364?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2018,8,29]],"date-time":"2018-08-29T23:53:07Z","timestamp":1535586787000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0360835217303364"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,9]]},"references-count":34,"alternative-id":["S0360835217303364"],"URL":"https:\/\/doi.org\/10.1016\/j.cie.2017.07.035","relation":{},"ISSN":["0360-8352"],"issn-type":[{"value":"0360-8352","type":"print"}],"subject":[],"published":{"date-parts":[[2017,9]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Condition-based maintenance under performance-based contracting","name":"articletitle","label":"Article Title"},{"value":"Computers & Industrial Engineering","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.cie.2017.07.035","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2017 Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}]}}