{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,6]],"date-time":"2024-07-06T20:07:13Z","timestamp":1720296433032},"reference-count":29,"publisher":"Elsevier BV","content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computers & Industrial Engineering"],"published-print":{"date-parts":[[2014,1]]},"DOI":"10.1016\/j.cie.2013.10.008","type":"journal-article","created":{"date-parts":[[2013,11,1]],"date-time":"2013-11-01T05:09:51Z","timestamp":1383282591000},"page":"72-81","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":6,"special_numbering":"C","title":["Workforce planning and technology installation optimisation for utilities"],"prefix":"10.1016","volume":"67","author":[{"given":"Mark G.","family":"Jennings","sequence":"first","affiliation":[]},{"given":"Nilay","family":"Shah","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.cie.2013.10.008_b0005","doi-asserted-by":"crossref","first-page":"252","DOI":"10.1016\/0041-5553(79)90085-5","article-title":"An economic method of computing LP-sequences","volume":"19","author":"Antonov","year":"1980","journal-title":"USSR Computational Mathematics and Mathematical Physics"},{"key":"10.1016\/j.cie.2013.10.008_b0010","unstructured":"BERR (2007). Appraisal of costs & benefits of smart meter roll out options. Mott MacDonald, Brighton, UK."},{"key":"10.1016\/j.cie.2013.10.008_b0015","unstructured":"Committee of Public Accounts (2012). Preparations for the roll-out of smart meters: Sixty-third Report of Session 2010\u20132012. House of Commons."},{"key":"10.1016\/j.cie.2013.10.008_b0020","unstructured":"DECC (2012). Energy price statistics. ."},{"issue":"2","key":"10.1016\/j.cie.2013.10.008_b0025","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1287\/mnsc.23.2.171","article-title":"Aggregate planning with learning curve productivity","volume":"23","author":"Ebert","year":"1976","journal-title":"Management Science"},{"key":"10.1016\/j.cie.2013.10.008_b0030","unstructured":"Edge, C. (2012). White paper: Smart metering. Wheatley Associates, Suffolk, UK. ."},{"issue":"2","key":"10.1016\/j.cie.2013.10.008_b0035","doi-asserted-by":"crossref","first-page":"518","DOI":"10.1016\/j.ejor.2009.05.026","article-title":"Operations risk management by optimally planning the qualified workforce capacity","volume":"202","author":"Fragni\u00e8re","year":"2010","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2013.10.008_b0040","unstructured":"Freedom of Information request (2012). FOI request to Office of gas and electricity markets: Share of domestic gas and electricity accounts at Ward level in Haringey borough."},{"issue":"1","key":"10.1016\/j.cie.2013.10.008_b0045","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1016\/0360-8352(93)90022-P","article-title":"A mixed integer programming model for acquiring advanced engineering technologies","volume":"24","author":"Gagnon","year":"1993","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"10.1016\/j.cie.2013.10.008_b0050","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1016\/S0360-8352(03)00069-X","article-title":"Acquiring advanced engineering technologies under conditions of performance improvement","volume":"45","author":"Gagnon","year":"2003","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"10.1016\/j.cie.2013.10.008_b0055","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1287\/mantech.1.1.46","article-title":"A linear programming approach to production and employment scheduling","volume":"1","author":"Hanssmann","year":"1960","journal-title":"Management Science MT"},{"key":"10.1016\/j.cie.2013.10.008_b0060","unstructured":"HM Treasury (2011). THE GREEN BOOK: Appraisal and evaluation in central government. TSO, London, UK."},{"key":"10.1016\/j.cie.2013.10.008_b0065","unstructured":"Jennings, M. G., & Shah, N. (2012). Optimization of an outbound logistics smart meter supply chain with learning effects and uncertainty. In 9th International conference on computational management science. London, UK."},{"key":"10.1016\/j.cie.2013.10.008_b0070","unstructured":"Keirstead, J. (2013). Uncertainty and sensitivity analysis. In J. Keirstead & N. Shah, (Eds.), Urban energy systems: An integrated approach (pp. 363-400). Taylor & Francis."},{"issue":"1","key":"10.1016\/j.cie.2013.10.008_b0075","doi-asserted-by":"crossref","first-page":"314","DOI":"10.2307\/3003227","article-title":"Efficient employment planning in public utilities","volume":"6","author":"Krajewski","year":"1975","journal-title":"The Bell Journal of Economics"},{"issue":"1","key":"10.1016\/j.cie.2013.10.008_b0080","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1145\/272991.272995","article-title":"Mersenne twister: A 623 dimensionally equidistributed uniform pseudorandom number generator","volume":"8","author":"Matsumoto","year":"1998","journal-title":"ACM Transactions on Modeling and Computer Simulation"},{"key":"10.1016\/j.cie.2013.10.008_b0085","unstructured":"National Audit Office (2011). Preparations for the roll-out of smart meters. Report by the Comptroller and Auditor General, London, UK."},{"key":"10.1016\/j.cie.2013.10.008_b0090","unstructured":"Ofgem (2008). Energy supply probe \u2013 Initial findings report. Office of gas and electricity markets, London, UK."},{"key":"10.1016\/j.cie.2013.10.008_b0095","unstructured":"ONS (2012). Office for national statistics neighbourhood statistics. ."},{"issue":"4","key":"10.1016\/j.cie.2013.10.008_b0100","doi-asserted-by":"crossref","first-page":"1096","DOI":"10.1016\/j.cie.2012.06.015","article-title":"Integrating workers differences into workforce planning","volume":"63","author":"Othman","year":"2012","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2013.10.008_b0105","unstructured":"Palmer, J., & Cooper, I. (2011). Great Britain\u2019s housing energy fact file. Department of Energy and Climate Change, London, UK. ."},{"key":"10.1016\/j.cie.2013.10.008_b0110","unstructured":"Personal communication (2012). Personal communication with Roger Stoney, SmartMOP."},{"key":"10.1016\/j.cie.2013.10.008_b0115","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2012.01.020","article-title":"Electric utility resource planning using continuous-discrete modular simulation and optimization (CoDiMoSO)","author":"S\u00e1enz","year":"2012","journal-title":"Computers & Industrial Engineering"},{"issue":"10\u201311","key":"10.1016\/j.cie.2013.10.008_b0120","doi-asserted-by":"crossref","first-page":"1109","DOI":"10.1016\/j.ress.2005.11.014","article-title":"Sensitivity analysis practices: Strategies for model-based inference","volume":"91","author":"Saltelli","year":"2006","journal-title":"Reliability Engineering & System Safety"},{"key":"10.1016\/j.cie.2013.10.008_b0125","series-title":"Global sensitivity analysis: The primer","author":"Saltelli","year":"2008"},{"key":"10.1016\/j.cie.2013.10.008_b0130","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1016\/0149-1970(90)90022-W","article-title":"Quasi-Monte Carlo methods","volume":"25","author":"Sobol","year":"1990","journal-title":"Progress in Nuclear Energy"},{"key":"10.1016\/j.cie.2013.10.008_b0135","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2011.07.022","article-title":"A stochastic mixed-integer programming approach to the energy-technology management problem","author":"Stoyan","year":"2011","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2013.10.008_b0140","unstructured":"The National Skills Academy (2012). Metering network. Technical report. ."},{"issue":"2","key":"10.1016\/j.cie.2013.10.008_b0145","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1061\/(ASCE)0733-9364(1986)112:2(245)","article-title":"Learning curve models of construction productivity","volume":"112","author":"Thomas","year":"1986","journal-title":"Journal of Construction Engineering and Management"}],"container-title":["Computers & Industrial Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835213003379?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835213003379?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2018,10,11]],"date-time":"2018-10-11T04:21:43Z","timestamp":1539231703000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0360835213003379"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,1]]},"references-count":29,"alternative-id":["S0360835213003379"],"URL":"https:\/\/doi.org\/10.1016\/j.cie.2013.10.008","relation":{},"ISSN":["0360-8352"],"issn-type":[{"value":"0360-8352","type":"print"}],"subject":[],"published":{"date-parts":[[2014,1]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Workforce planning and technology installation optimisation for utilities","name":"articletitle","label":"Article Title"},{"value":"Computers & Industrial Engineering","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.cie.2013.10.008","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2013 Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}]}}