{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,8]],"date-time":"2024-08-08T02:55:14Z","timestamp":1723085714280},"reference-count":27,"publisher":"Elsevier BV","issue":"4","license":[{"start":{"date-parts":[[2011,5,1]],"date-time":"2011-05-01T00:00:00Z","timestamp":1304208000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers & Industrial Engineering"],"published-print":{"date-parts":[[2011,5]]},"DOI":"10.1016\/j.cie.2010.12.006","type":"journal-article","created":{"date-parts":[[2010,12,17]],"date-time":"2010-12-17T09:16:34Z","timestamp":1292577394000},"page":"519-526","source":"Crossref","is-referenced-by-count":28,"title":["A simple and robust Simulated Annealing algorithm for scheduling workover rigs on onshore oil fields"],"prefix":"10.1016","volume":"60","author":[{"given":"Glaydston","family":"Mattos Ribeiro","sequence":"first","affiliation":[]},{"given":"Geraldo","family":"Regis Mauri","sequence":"additional","affiliation":[]},{"given":"Luiz","family":"Antonio Nogueira Lorena","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"issue":"5","key":"10.1016\/j.cie.2010.12.006_b0005","doi-asserted-by":"crossref","first-page":"695","DOI":"10.1016\/j.dam.2004.09.021","article-title":"Scheduling workover rigs for onshore oil production","volume":"154","author":"Aloise","year":"2006","journal-title":"Discrete Applied Mathematics"},{"key":"10.1016\/j.cie.2010.12.006_b0010","unstructured":"Alves, V. R. F. M., Filho, & V. J. M. F. (2006). Proposta de algoritmo gen\u00e9tico para a solu\u00e7\u00e3o do problema de roteamento e sequenciamento de sondas de manuten\u00e7\u00e3o (a genetic algorithm for the routing and sequencing maintenance workover rig problem). In: XXXVIII Brazilian symposium on operations research (pp. 1837\u20131848)."},{"issue":"7","key":"10.1016\/j.cie.2010.12.006_b0015","doi-asserted-by":"crossref","first-page":"729","DOI":"10.2118\/315-PA","article-title":"Linear programming: A problem-solving tool for petroleum industry management","volume":"14","author":"Aronofsky","year":"1962","journal-title":"Journal of Petroleum Technology"},{"issue":"12","key":"10.1016\/j.cie.2010.12.006_b0020","doi-asserted-by":"crossref","first-page":"1651","DOI":"10.2118\/5986-PA","article-title":"Scheduling a backlog of oil well workovers","volume":"29","author":"Barnes","year":"1977","journal-title":"Journal of Petroleum Technology"},{"key":"10.1016\/j.cie.2010.12.006_b0025","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1007\/BF02601637","article-title":"Simulated annealing metaheuristics for the vehicle routing problem with time windows","volume":"63","author":"Chiang","year":"1996","journal-title":"Annals of Operations Research"},{"issue":"4","key":"10.1016\/j.cie.2010.12.006_b0030","doi-asserted-by":"crossref","first-page":"526","DOI":"10.1287\/trsc.1050.0120","article-title":"Models and tabu search heuristics for the bert-allocation problem","volume":"39","author":"Cordeau","year":"2005","journal-title":"Transportation Science"},{"key":"10.1016\/j.cie.2010.12.006_b0035","unstructured":"Costa, L. R. (2005). Otimiza\u00e7\u00e3o do itiner\u00e1rio de sondas de interven\u00e7\u00e3o (workover rig itinerary optimization). Master\u2019s thesis, Federal University of Rio de Janeiro, Brazil."},{"key":"10.1016\/j.cie.2010.12.006_b0040","unstructured":"Costa, L. R., & Filho, V. J. M. F. (2004). Uma heur\u00edstica para o problema do planejamento de itiner\u00e1rios de sondas em interven\u00e7\u00f5es de po\u00e7os de petr\u00f3leo (a heuristic for workover rigs itinerary problem on oil wells maintenance). In: XXXVI Brazilian symposium on operations research (pp. 1844\u20131853)."},{"key":"10.1016\/j.cie.2010.12.006_b0045","unstructured":"Costa, L. R., & Filho, V. J. M. F. (2005). Uma heur\u00edstica de montagem din\u00e2mica para o problema de otimiza\u00e7\u00e3o de itiner\u00e1rios de sondas (a heuristic of dynamic assembly for the workover rigs itinerary problem). In: XXXVII Brazilian symposium on operations research (pp. 2176\u20132187). ."},{"key":"10.1016\/j.cie.2010.12.006_b0050","unstructured":"Douro, R. F., & Lorenzoni, L. L. (2009). Um algoritmo gen\u00e9tico-2opt aplicado ao problema de otimiza\u00e7\u00e3o de itiner\u00e1rio de sondas de produ\u00e7\u00e3o terrestre (a genetic-2opt algorithm applied to onshore workover rigs itinerary problem). In: XLI Brazilian symposium on operations research."},{"key":"10.1016\/j.cie.2010.12.006_b0055","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/0377-2217(96)00123-3","article-title":"Scheduling multiprocessor tasks \u2013 An overview","volume":"2","author":"Drozdowski","year":"1996","journal-title":"European Journal on Operations Research"},{"key":"10.1016\/j.cie.2010.12.006_b0060","doi-asserted-by":"crossref","first-page":"483","DOI":"10.1287\/moor.15.3.483","article-title":"Minimizing total tardiness on one machine is np-hard","volume":"15","author":"Du","year":"1990","journal-title":"Mathematics of Operations Research"},{"issue":"2","key":"10.1016\/j.cie.2010.12.006_b0065","doi-asserted-by":"crossref","first-page":"268","DOI":"10.1287\/mnsc.11.2.268","article-title":"Bounds for the optimal scheduling of n jobs on m processors","volume":"11","author":"Eastman","year":"1964","journal-title":"Management Science"},{"key":"10.1016\/j.cie.2010.12.006_b0070","doi-asserted-by":"crossref","first-page":"1055","DOI":"10.1287\/opre.41.6.1055","article-title":"The delivery man problem and cumulative matroids","volume":"41","author":"Fischetti","year":"1993","journal-title":"Operations Research"},{"key":"10.1016\/j.cie.2010.12.006_b0075","unstructured":"Goldbarg, E. F. G., Goldbarg, M. C., & Costa, W. E. (2002). Evolutionary algorithms applied to the workover rigs schedule problem. In: XI Latin-Iberian American congress of operations research. ."},{"issue":"3","key":"10.1016\/j.cie.2010.12.006_b0080","doi-asserted-by":"crossref","first-page":"252","DOI":"10.2118\/3296-PA","article-title":"A stochastic inventory model for scheduling development drilling","volume":"11","author":"Hartsock","year":"1971","journal-title":"Society of Petroleum Engineers Journal"},{"key":"10.1016\/j.cie.2010.12.006_b0085","unstructured":"IBM (2009). IBM ILOG CPLEX v12.1: User\u2019s manual for CPLEX, 952 p."},{"key":"10.1016\/j.cie.2010.12.006_b0090","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1126\/science.220.4598.671","article-title":"Optimization by simulated annealing","volume":"220","author":"Kirkpatrick","year":"1983","journal-title":"Science"},{"issue":"3","key":"10.1016\/j.cie.2010.12.006_b0095","doi-asserted-by":"crossref","first-page":"6","DOI":"10.1109\/MITS.2009.934641","article-title":"Customers\u2019 satisfaction in a dial-a-ride problem","volume":"1","author":"Mauri","year":"2009","journal-title":"IEEE Intelligent Transportation Systems Magazine"},{"key":"10.1016\/j.cie.2010.12.006_b0100","doi-asserted-by":"crossref","first-page":"110","DOI":"10.1007\/978-3-540-78604-7_10","article-title":"A hybrid column generation approach for the berth allocation problem","volume":"4972","author":"Mauri","year":"2008","journal-title":"Springer Lecture Notes in Computer Science"},{"key":"10.1016\/j.cie.2010.12.006_b0105","unstructured":"Noronha, T. F., Lima, F. C. J., & Aloise, D. J. (2001). Um algoritmo heur\u00edstico guloso aplicado ao problema do gerenciamento das interven\u00e7\u00f5es em po\u00e7os petrol\u00edferos por sondas de produ\u00e7\u00e3o terrestre (a greedy heuristic algorithm applied to management of petroleum oil well maintenance performed by onshore workover rigs). In: XXXIII Brazilian symposium on operations research. ."},{"key":"10.1016\/j.cie.2010.12.006_b0110","unstructured":"Oliveira, E. F., Pagoto, F. B., Silva, F. T., & Lorenzoni, L. L. (2007). Scatter search aplicado ao problema de otimiza\u00e7\u00e3o da aloca\u00e7\u00e3o de sondas de produ\u00e7\u00e3o em po\u00e7os de petr\u00f3leo (scatter search applied to workover rigs optimization problem). In: XXVII national production engineering meeting (pp. 1\u201310). ."},{"key":"10.1016\/j.cie.2010.12.006_b0115","unstructured":"Pacheco, A. V. F., Filho, A. C. T. D., & Ribeiro, G. M. (2009). Uma heur\u00edstica para o problema da aloca\u00e7\u00e3o de sondas de produ\u00e7\u00e3o em po\u00e7os de petr\u00f3leo (a heuristic for the workover rig problem). In: XXIX National production engineering meeting. ."},{"key":"10.1016\/j.cie.2010.12.006_b0120","unstructured":"Paiva, R. O. (1997). Otimiza\u00e7\u00e3o do itiner\u00e1rio de sondas de interven\u00e7\u00e3o (workover rig itinerary optimization). Master\u2019s thesis, UNICAMP, Brazil."},{"key":"10.1016\/j.cie.2010.12.006_b0125","unstructured":"Paiva, R. O., Schiozer, D. J., Bordalo, S. N. (2000). Optimizing the itinerary of workover rigs. In: 16th World petroleum congress."},{"key":"10.1016\/j.cie.2010.12.006_b0130","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1002\/nav.3800030106","article-title":"Various optimizers for single stage production","volume":"3","author":"Smith","year":"1956","journal-title":"Naval Research Logistics Quartely"},{"key":"10.1016\/j.cie.2010.12.006_b0135","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1002\/net.3230220305","article-title":"Special cases of traveling salesman and repairman problems with time windows","volume":"22","author":"Tsitsiklis","year":"1992","journal-title":"Networks"}],"container-title":["Computers & Industrial Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835210003220?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835210003220?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2018,12,6]],"date-time":"2018-12-06T06:27:06Z","timestamp":1544077626000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0360835210003220"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,5]]},"references-count":27,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2011,5]]}},"alternative-id":["S0360835210003220"],"URL":"https:\/\/doi.org\/10.1016\/j.cie.2010.12.006","relation":{},"ISSN":["0360-8352"],"issn-type":[{"value":"0360-8352","type":"print"}],"subject":[],"published":{"date-parts":[[2011,5]]}}}