{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,1]],"date-time":"2022-04-01T20:16:18Z","timestamp":1648844178945},"reference-count":6,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2007,9,1]],"date-time":"2007-09-01T00:00:00Z","timestamp":1188604800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers & Industrial Engineering"],"published-print":{"date-parts":[[2007,9]]},"DOI":"10.1016\/j.cie.2007.06.012","type":"journal-article","created":{"date-parts":[[2007,6,16]],"date-time":"2007-06-16T14:11:18Z","timestamp":1182003078000},"page":"215-221","source":"Crossref","is-referenced-by-count":6,"title":["A production scheduling strategy with a common due window"],"prefix":"10.1016","volume":"53","author":[{"given":"Yue","family":"Wu","sequence":"first","affiliation":[]},{"given":"K.K.","family":"Lai","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.cie.2007.06.012_bib1","unstructured":"Anger, F. D., Lee, C. Y., & Martin-Vega, L. A. (1986). Single machine scheduling with tight windows. Research Report, 86\u2013168, Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL."},{"issue":"2","key":"10.1016\/j.cie.2007.06.012_bib2","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/0305-0548(88)90001-9","article-title":"Optimal common due-date with limited completion time deviation","volume":"15","author":"Cheng","year":"1988","journal-title":"Computer and Operations Research"},{"issue":"1","key":"10.1016\/j.cie.2007.06.012_bib3","doi-asserted-by":"crossref","first-page":"190","DOI":"10.1016\/0377-2217(95)00116-6","article-title":"Single-machine scheduling with time windows and earliness\/tardiness penalties","volume":"91","author":"Koulamas","year":"1996","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2007.06.012_bib4","unstructured":"Lee, C. Y. (1991). Earliness\u2013tardiness scheduling problems with constant size of due-date window. Research Report, Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL."},{"issue":"4","key":"10.1016\/j.cie.2007.06.012_bib5","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/0167-6377(94)90078-7","article-title":"Earliness\u2013tardiness scheduling problems with a common delivery window","volume":"15","author":"Liman","year":"1994","journal-title":"Operations Research Letters"},{"issue":"3","key":"10.1016\/j.cie.2007.06.012_bib6","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1016\/0925-5273(95)00200-6","article-title":"A single machine earliness\u2013tardiness scheduling about a common due date with tolerances","volume":"42","author":"Weng","year":"1995","journal-title":"International Journal of Production Economics"}],"container-title":["Computers & Industrial Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835207001027?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835207001027?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,1,6]],"date-time":"2019-01-06T16:21:30Z","timestamp":1546791690000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0360835207001027"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,9]]},"references-count":6,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2007,9]]}},"alternative-id":["S0360835207001027"],"URL":"https:\/\/doi.org\/10.1016\/j.cie.2007.06.012","relation":{},"ISSN":["0360-8352"],"issn-type":[{"value":"0360-8352","type":"print"}],"subject":[],"published":{"date-parts":[[2007,9]]}}}