{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,11]],"date-time":"2024-09-11T22:12:40Z","timestamp":1726092760012},"reference-count":48,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2014,12,1]],"date-time":"2014-12-01T00:00:00Z","timestamp":1417392000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Applied Soft Computing"],"published-print":{"date-parts":[[2014,12]]},"DOI":"10.1016\/j.asoc.2014.08.002","type":"journal-article","created":{"date-parts":[[2014,8,12]],"date-time":"2014-08-12T14:03:17Z","timestamp":1407852197000},"page":"519-529","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":78,"special_numbering":"C","title":["A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment"],"prefix":"10.1016","volume":"25","author":[{"given":"Shwetank","family":"Avikal","sequence":"first","affiliation":[]},{"given":"Rajeev","family":"Jain","sequence":"additional","affiliation":[]},{"given":"P.K.","family":"Mishra","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"issue":"11","key":"10.1016\/j.asoc.2014.08.002_bib0025","doi-asserted-by":"crossref","first-page":"2569","DOI":"10.1080\/00207540210135622","article-title":"Disassembly line in product recovery","volume":"40","author":"Gungor","year":"2002","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"10.1016\/j.asoc.2014.08.002_bib0020","doi-asserted-by":"crossref","first-page":"481","DOI":"10.1080\/00207540010002838","article-title":"Disassembly sequence plan generation using a branch-and-bound algorithm","volume":"39","author":"Gungor","year":"2001","journal-title":"Int. J. Prod. Res."},{"issue":"7","key":"10.1016\/j.asoc.2014.08.002_bib0205","doi-asserted-by":"crossref","first-page":"1427","DOI":"10.1080\/00207540110052157","article-title":"A solution approach to the disassembly line problem in the presence of task failures","volume":"39","author":"Gungor","year":"2001","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.asoc.2014.08.002_bib0005","doi-asserted-by":"crossref","first-page":"3721","DOI":"10.1080\/0020754031000120078","article-title":"Disassembly sequencing: a survey","volume":"41","author":"Lambert","year":"2003","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.asoc.2014.08.002_bib0215","doi-asserted-by":"crossref","first-page":"723","DOI":"10.1016\/S0360-8352(99)00162-X","article-title":"Linear programming in disassembly\/clustering sequence generation","volume":"36","author":"Lambert","year":"1999","journal-title":"Comput. Ind. Eng."},{"key":"10.1016\/j.asoc.2014.08.002_bib0075","doi-asserted-by":"crossref","first-page":"866","DOI":"10.1080\/07408170802510390","article-title":"Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND\/OR graph","volume":"41","author":"Koc","year":"2009","journal-title":"IIE Trans. Oper. Eng."},{"issue":"1","key":"10.1016\/j.asoc.2014.08.002_bib0175","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1504\/IJMCDM.2012.045080","article-title":"Robust strategies for mitigating operational and disruption risks: a fuzzy AHP approach","volume":"2","author":"Singh","year":"2012","journal-title":"Int. J. Multicriteria Decis. Mak."},{"key":"10.1016\/j.asoc.2014.08.002_bib0125","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1007\/s00170-010-2867-0","article-title":"Integration of Kano's model into quality function deployment (QFD)","volume":"53","author":"Chaudha","year":"2011","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"4","key":"10.1016\/j.asoc.2014.08.002_bib0120","first-page":"2","article-title":"Kano's methods for understanding customer-defined quality","volume":"2","author":"Berger","year":"1993","journal-title":"Cent. Qual. Manage. J."},{"key":"10.1016\/j.asoc.2014.08.002_bib0185","series-title":"Multiple Attribute Decision Making: Methods and Applications","author":"Hwang","year":"1981"},{"key":"10.1016\/j.asoc.2014.08.002_bib0195","doi-asserted-by":"crossref","first-page":"900","DOI":"10.1016\/j.asoc.2010.01.010","article-title":"In-depth analysis and simulation study of an innovative fuzzy approach for ranking alternatives in multiple attribute decision making problems based on TOPSIS","volume":"11","author":"Chamodrakas","year":"2011","journal-title":"Appl. Soft Comput."},{"issue":"10","key":"10.1016\/j.asoc.2014.08.002_bib0070","doi-asserted-by":"crossref","first-page":"2675","DOI":"10.1080\/00207540601137207","article-title":"Profit-oriented disassembly-line balancing","volume":"46","author":"Altekin","year":"2008","journal-title":"Int. J. Prod. Res."},{"issue":"14","key":"10.1016\/j.asoc.2014.08.002_bib0140","doi-asserted-by":"crossref","first-page":"3825","DOI":"10.1080\/00207540600787200","article-title":"Global supplier selection: a fuzzy-AHP approach","volume":"46","author":"Chan","year":"2007","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.asoc.2014.08.002_bib0155","doi-asserted-by":"crossref","first-page":"520","DOI":"10.1016\/j.asoc.2009.08.021","article-title":"Fuzzy AHP to determine the relative weights of evaluation criteria and fuzzy TOPSIS to rank the alternatives","volume":"10","author":"Torfi","year":"2010","journal-title":"Appl. Soft Comput."},{"issue":"6","key":"10.1016\/j.asoc.2014.08.002_bib0130","doi-asserted-by":"crossref","first-page":"599","DOI":"10.1080\/14783360701349351","article-title":"Integrating the Kano model and QFD for designing new products","volume":"18","author":"Tontini","year":"2007","journal-title":"Total Qual. Manage."},{"issue":"1","key":"10.1016\/j.asoc.2014.08.002_bib0160","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1504\/IJDE.2012.050289","article-title":"Robust design approach with fuzzy-AHP for product design to enhance aesthetic quality","volume":"5","author":"Yadav","year":"2012","journal-title":"Int. J. Design Eng."},{"issue":"4","key":"10.1016\/j.asoc.2014.08.002_bib0180","first-page":"1281","article-title":"Prioritized aesthetic attributes of product a fuzzy-AHP approach","volume":"4","author":"Yadav","year":"2012","journal-title":"Int. J. Eng. Sci. Technol."},{"issue":"3","key":"10.1016\/j.asoc.2014.08.002_bib0135","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/S0888-613X(99)00025-0","article-title":"Multicriteria analysis with fuzzy pair wise comparison","volume":"21","author":"Deng","year":"1999","journal-title":"Int. J. Approximate Reason."},{"key":"10.1016\/j.asoc.2014.08.002_bib0105","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1016\/S0739-8859(04)08008-4","article-title":"The applicability of multicriteria-analysis to the evaluation of intelligent transport systems (ITS)","volume":"8","author":"De Brucker","year":"2004","journal-title":"Res. Transport. Econ."},{"issue":"1","key":"10.1016\/j.asoc.2014.08.002_bib0110","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1016\/S0166-4972(97)00072-2","article-title":"How to make product development projects more successful by integrating Kano's model of the customer satisfaction into quality function deployment","volume":"18","author":"Matzler","year":"1998","journal-title":"Technovation"},{"issue":"3","key":"10.1016\/j.asoc.2014.08.002_bib0145","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","article-title":"Fuzzy sets","volume":"8","author":"Zadeh","year":"1965","journal-title":"Inform. Control"},{"key":"10.1016\/j.asoc.2014.08.002_bib0210","doi-asserted-by":"crossref","first-page":"188","DOI":"10.1109\/70.54734","article-title":"And\/or graph representation of assembly plans","volume":"6","author":"Homem de Mello","year":"1990","journal-title":"IEEE Trans. Robot. Autom."},{"key":"10.1016\/j.asoc.2014.08.002_bib0100","doi-asserted-by":"crossref","first-page":"954","DOI":"10.1016\/j.sbspro.2011.08.104","article-title":"A combined AHP-PROMETHEE approach for selecting the most appropriate policy scenario to stimulate a clean vehicle fleet","volume":"20","author":"Turcksin","year":"2011","journal-title":"Procedia Soc. Behav. Sci."},{"key":"10.1016\/j.asoc.2014.08.002_bib0170","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1016\/S0377-2217(99)00118-6","article-title":"On consistency and ranking of alternatives in fuzzy AHP","volume":"124","author":"Leung","year":"2000","journal-title":"Eur. J. Oper. Res."},{"key":"10.1016\/j.asoc.2014.08.002_bib0065","doi-asserted-by":"crossref","first-page":"761","DOI":"10.1007\/s00170-009-2303-5","article-title":"A new multi-objective ant colony algorithm for solving the disassembly line balancing problems","volume":"48","author":"Ding","year":"2010","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"10.1016\/j.asoc.2014.08.002_bib0190","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1016\/j.compind.2007.05.013","article-title":"Using AHP and TOPSIS approaches in customer-driven product design process","volume":"59","author":"Lin","year":"2008","journal-title":"Comput. Ind."},{"key":"10.1016\/j.asoc.2014.08.002_bib0085","doi-asserted-by":"crossref","first-page":"748","DOI":"10.1016\/j.cie.2010.07.031","article-title":"Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line","volume":"59","author":"Ilgin","year":"2010","journal-title":"Comput. Ind. Eng."},{"issue":"5","key":"10.1016\/j.asoc.2014.08.002_bib0035","doi-asserted-by":"crossref","first-page":"1113","DOI":"10.1080\/00207540110097176","article-title":"A Petri Net based approach to determine strategy of a product","volume":"40","author":"Tiwari","year":"2001","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"10.1016\/j.asoc.2014.08.002_bib0115","first-page":"39","article-title":"Attractive quality and must-be quality","volume":"14","author":"Kano","year":"1984","journal-title":"J. Jpn. Soc. Qual. Control"},{"key":"10.1016\/j.asoc.2014.08.002_bib0080","series-title":"Proceedings of the IEEE International Symposium on Electronics and Environment","first-page":"234","article-title":"Dynamic scheduling and line balancing methods, and software tools for lean and reconfigurable disassembly cells and lines","author":"Ranky","year":"2003"},{"issue":"1","key":"10.1016\/j.asoc.2014.08.002_bib0165","first-page":"34","article-title":"Prioritization of supplier selection criteria: a fuzzy-AHP approach","volume":"3","author":"Jain","year":"2013","journal-title":"MIT Int. J. Mech. Eng."},{"key":"10.1016\/j.asoc.2014.08.002_bib0200","article-title":"Comparative analysis of a novel M-TOPSIS method and TOPSIS","volume":"2007","author":"Ren","year":"2007","journal-title":"Appl. Math. Res. Express"},{"issue":"6","key":"10.1016\/j.asoc.2014.08.002_bib0060","doi-asserted-by":"crossref","first-page":"1405","DOI":"10.1080\/00207540600943985","article-title":"A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem","volume":"46","author":"Agrawal","year":"2008","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"10.1016\/j.asoc.2014.08.002_bib0090","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1504\/IER.2013.054125","article-title":"An AHP and PROMETHEE methods based environment friendly heuristic for disassembly line balancing problems","volume":"14","author":"Avikal","year":"2013","journal-title":"Interdiscip. Environ. Rev."},{"issue":"5","key":"10.1016\/j.asoc.2014.08.002_bib0095","doi-asserted-by":"crossref","first-page":"1306","DOI":"10.1080\/00207543.2013.831999","article-title":"An fuzzy AHP and PROMETHEE methods based heuristic for disassembly line balancing problems","volume":"152","author":"Avikal","year":"2014","journal-title":"Int. J. Prod. Res."},{"issue":"11","key":"10.1016\/j.asoc.2014.08.002_bib0030","doi-asserted-by":"crossref","first-page":"2845","DOI":"10.1080\/00207540601120484","article-title":"Methods for optimum and near optimum disassembly sequencing","volume":"46","author":"Gupta","year":"2008","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.asoc.2014.08.002_bib0010","series-title":"Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III","first-page":"71","article-title":"2-Opt heuristic for the disassembly line balancing problem","author":"McGovern","year":"2003"},{"key":"10.1016\/j.asoc.2014.08.002_bib0050","doi-asserted-by":"crossref","first-page":"692","DOI":"10.1016\/j.ejor.2005.03.055","article-title":"A balancing method and genetic algorithm for disassembly line balancing","volume":"179","author":"McGovern","year":"2007","journal-title":"Eur. J. Oper. Res."},{"key":"10.1016\/j.asoc.2014.08.002_bib0055","doi-asserted-by":"crossref","first-page":"481","DOI":"10.1007\/s00170-005-0037-6","article-title":"Ant colony optimization for disassembly sequencing with multiple objectives","volume":"30","author":"McGovern","year":"2006","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"18\u201319","key":"10.1016\/j.asoc.2014.08.002_bib0045","doi-asserted-by":"crossref","first-page":"4485","DOI":"10.1080\/00207540701476281","article-title":"Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem","volume":"45","author":"McGovern","year":"2007","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"10.1016\/j.asoc.2014.08.002_bib0040","doi-asserted-by":"crossref","first-page":"324","DOI":"10.1109\/TASE.2005.860989","article-title":"A systematic approach to design and operation of disassembly lines","volume":"3","author":"Tang","year":"2006","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"key":"10.1016\/j.asoc.2014.08.002_bib0150","doi-asserted-by":"crossref","first-page":"641","DOI":"10.1016\/j.asoc.2008.09.003","article-title":"A fuzzy AHP approach to personnel selection problem","volume":"9","author":"Gungor","year":"2009","journal-title":"Appl. Soft Comput."},{"issue":"8","key":"10.1016\/j.asoc.2014.08.002_bib0220","doi-asserted-by":"crossref","first-page":"1857","DOI":"10.1080\/00207549408957046","article-title":"Scheduling disassembly","volume":"32","author":"Gupta","year":"1994","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"10.1016\/j.asoc.2014.08.002_bib0225","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1080\/10686967.2008.11918056","article-title":"Two decades of using Kano's theory of attractive quality: a literature review","volume":"15","author":"Martin","year":"2008","journal-title":"Qual. Manage. J."},{"issue":"8","key":"10.1016\/j.asoc.2014.08.002_bib0230","doi-asserted-by":"crossref","first-page":"1141","DOI":"10.1080\/095441200440395","article-title":"Integrating Kano's model in the planning matrix of Quality Function Deployment","volume":"11","author":"Tan","year":"2000","journal-title":"Total Qual. Manage."},{"key":"10.1016\/j.asoc.2014.08.002_bib0235","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/0165-0114(85)90090-9","article-title":"Fuzzy Hierarchical Analysis","volume":"17","author":"Buckley","year":"1985","journal-title":"Fuzzy Set Syst."},{"key":"10.1016\/j.asoc.2014.08.002_bib0240","series-title":"Analytic Hierarchy Process","author":"Saaty","year":"1980"},{"key":"10.1016\/j.asoc.2014.08.002_bib0245","first-page":"165","volume":"vol. 7","author":"Kano","year":"1996"}],"container-title":["Applied Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1568494614003676?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1568494614003676?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,8,13]],"date-time":"2019-08-13T17:13:34Z","timestamp":1565716414000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S1568494614003676"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12]]},"references-count":48,"alternative-id":["S1568494614003676"],"URL":"https:\/\/doi.org\/10.1016\/j.asoc.2014.08.002","relation":{},"ISSN":["1568-4946"],"issn-type":[{"value":"1568-4946","type":"print"}],"subject":[],"published":{"date-parts":[[2014,12]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment","name":"articletitle","label":"Article Title"},{"value":"Applied Soft Computing","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.asoc.2014.08.002","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2014 Elsevier B.V. All rights reserved.","name":"copyright","label":"Copyright"}]}}