{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,3]],"date-time":"2024-09-03T23:54:22Z","timestamp":1725407662580},"reference-count":47,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2017,8,1]],"date-time":"2017-08-01T00:00:00Z","timestamp":1501545600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Advanced Engineering Informatics"],"published-print":{"date-parts":[[2017,8]]},"DOI":"10.1016\/j.aei.2017.06.003","type":"journal-article","created":{"date-parts":[[2017,7,12]],"date-time":"2017-07-12T02:49:07Z","timestamp":1499827747000},"page":"181-205","update-policy":"http:\/\/dx.doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":72,"special_numbering":"C","title":["Information Quality Assessment for Facility Management"],"prefix":"10.1016","volume":"33","author":[{"given":"Puyan A.","family":"Zadeh","sequence":"first","affiliation":[]},{"given":"Guan","family":"Wang","sequence":"additional","affiliation":[]},{"ORCID":"http:\/\/orcid.org\/0000-0002-8923-4641","authenticated-orcid":false,"given":"Hasan B.","family":"Cavka","sequence":"additional","affiliation":[]},{"given":"Sheryl","family":"Staub-French","sequence":"additional","affiliation":[]},{"given":"Rachel","family":"Pottinger","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.aei.2017.06.003_b0005","unstructured":"SmartMarket Report, SmartMarket Report: The Business Value of BIM for Owners, McGraw Hill Construction, 2014. ."},{"key":"10.1016\/j.aei.2017.06.003_b0010","unstructured":"O. Berard, A framework for assessing design information quality from the builder\u2019s perspective, in: Building Information Modeling for Managing Design and Construction: Assessing Design Information Quality, Technical University of Denmark, 2012."},{"issue":"11","key":"10.1016\/j.aei.2017.06.003_b0015","doi-asserted-by":"crossref","first-page":"04014054","DOI":"10.1061\/(ASCE)CO.1943-7862.0000891","article-title":"BIM cloud score: benchmarking BIM performance","volume":"140","author":"Du","year":"2014","journal-title":"J. Construct. Eng. Manage."},{"issue":"3","key":"10.1016\/j.aei.2017.06.003_b0020","doi-asserted-by":"crossref","first-page":"739","DOI":"10.1016\/j.aei.2015.07.006","article-title":"Toward robust and quantifiable automated IFC quality validation","volume":"29","author":"Solihin","year":"2015","journal-title":"Adv. Eng. Inform."},{"issue":"3","key":"10.1016\/j.aei.2017.06.003_b0025","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1007\/s00163-009-0084-3","article-title":"Measuring information flow in the detailed design of construction projects","volume":"21","author":"Tribelsky","year":"2010","journal-title":"Res. Eng. Des."},{"key":"10.1016\/j.aei.2017.06.003_b0030","first-page":"18","article-title":"BIM for facility management: design for maintenance strategy","author":"Foster","year":"2011","journal-title":"J. Build. Inform. Model."},{"key":"10.1016\/j.aei.2017.06.003_b0035","unstructured":"Michael P. Gallaher, Alan C. O\u2019Connor, John L. Dettbarn, Linda T. Gilday, Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry, 2004. ."},{"key":"10.1016\/j.aei.2017.06.003_b0040","unstructured":"BSI, Specification for information management for the operational phase of assets using building information modelling, PAS 1192-3:2014, The British Standards Institution, ISBN 978 0 580 83910 8, 2014. ."},{"key":"10.1016\/j.aei.2017.06.003_b0045","unstructured":"GSA, GSA Building Information Modeling Guide Series: 08 \u2013 GSA BIM Guide for Facility Management, 2011. ."},{"key":"10.1016\/j.aei.2017.06.003_b0050","unstructured":"LACCD BIMS, LACCD Building Information Modeling Standards, 2010. ."},{"key":"10.1016\/j.aei.2017.06.003_b0055","unstructured":"SBCA, Singapore BIM Guide Version 2, 2013. ."},{"issue":"4","key":"10.1016\/j.aei.2017.06.003_b0060","doi-asserted-by":"crossref","first-page":"636","DOI":"10.1016\/j.aei.2013.08.004","article-title":"Extended process to product modeling (xPPM) for integrated and seamless IDM and MVD development","volume":"27","author":"Lee","year":"2013","journal-title":"Adv. Eng. Inform."},{"issue":"3","key":"10.1016\/j.aei.2017.06.003_b0065","doi-asserted-by":"crossref","first-page":"279","DOI":"10.17763\/haer.62.3.8323320856251826","article-title":"Understanding and validity in qualitative research","volume":"62","author":"Maxwell","year":"1992","journal-title":"Harvard Educ. Rev."},{"issue":"1","key":"10.1016\/j.aei.2017.06.003_b0070","first-page":"77","article-title":"Qualitative research: validity","volume":"6","author":"Thomson","year":"2011","journal-title":"Joaag"},{"key":"10.1016\/j.aei.2017.06.003_b0075","series-title":"ICSC15: The Canadian Society for Civil Engineering 5th International\/11th Construction Specialty Conference","first-page":"1887","article-title":"Review of BIM quality assessment approaches for facility management","author":"Zadeh","year":"2015"},{"key":"10.1016\/j.aei.2017.06.003_b0080","series-title":"BIM Information Quality Analysis for Space Management","author":"Zadeh","year":"2016"},{"key":"10.1016\/j.aei.2017.06.003_b0085","series-title":"BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors","author":"Eastman","year":"2011"},{"key":"10.1016\/j.aei.2017.06.003_b0090","series-title":"Proceedings of the International Conference on Computing in Civil and Building Engineering","first-page":"151","article-title":"Potential utilization of building information models for planning maintenance activities","author":"Akcamete","year":"2010"},{"key":"10.1016\/j.aei.2017.06.003_b0095","unstructured":"L. Sabol, Building information modeling & facility management, in: IFMA World Workplace, Design + Construction Strategies, LLC\\, 2008."},{"key":"10.1016\/j.aei.2017.06.003_b0100","series-title":"AEI 2013 \u2013 sBuilding Solutions for Architectural Engineering","first-page":"680","article-title":"Developing standards to assess the quality of BIM criteria for facilities management","author":"Kasprzak","year":"2013"},{"key":"10.1016\/j.aei.2017.06.003_b0105","unstructured":"National Institute of Building Sciences, National Building Information Modeling Standard: Transforming the Building Supply Chain Through Open and Interoperable Information Exchanges, 2007. ."},{"issue":"3","key":"10.1016\/j.aei.2017.06.003_b0110","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1061\/(ASCE)CO.1943-7862.0000433","article-title":"Application areas and data requirements for BIM-enabled facilities management","volume":"138","author":"Becerik-Gerber","year":"2011","journal-title":"J. Construct. Eng. Manage."},{"key":"10.1016\/j.aei.2017.06.003_b0115","unstructured":"BIM Task Group, COBie Data Drops, 2012. ."},{"key":"10.1016\/j.aei.2017.06.003_b0120","unstructured":"H. Kulusj\u00e4rvi, COBIM: Common BIM Requirements \u2013 Series 6 Quality assurance, 2012. ."},{"key":"10.1016\/j.aei.2017.06.003_b0125","doi-asserted-by":"crossref","unstructured":"P. Teicholz, BIM for Facility Managers, Wiley, ISBN 9781118417621, 2013. .","DOI":"10.1002\/9781119572633"},{"key":"10.1016\/j.aei.2017.06.003_b0130","unstructured":"USC, Building Information Modeling (BIM) Guidelines, 2012. ."},{"key":"10.1016\/j.aei.2017.06.003_b0135","unstructured":"BuildingSMART, Specifications Welcome to buildingSMART-Tech.org, 2017. ."},{"issue":"4","key":"10.1016\/j.aei.2017.06.003_b0140","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1080\/07421222.1996.11518099","article-title":"Beyond accuracy: what data quality means to data consumers","volume":"12","author":"Wang","year":"1996","journal-title":"J. Manage. Inform. Syst."},{"issue":"2","key":"10.1016\/j.aei.2017.06.003_b0145","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1016\/S0378-7206(02)00043-5","article-title":"AIMQ: a methodology for information quality assessment","volume":"40","author":"Lee","year":"2002","journal-title":"Inform. Manage."},{"issue":"4","key":"10.1016\/j.aei.2017.06.003_b0150","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/j.ijinfomgt.2006.12.001","article-title":"Lean information management: understanding and eliminating waste","volume":"27","author":"Hicks","year":"2007","journal-title":"Int. J. Inform. Manage."},{"key":"10.1016\/j.aei.2017.06.003_b0155","unstructured":"M. Guttman, The information content of BIM: an information theory analysis of building information model (BIM) content, Res. J. 03(02) (2011) 29."},{"issue":"5\/6","key":"10.1016\/j.aei.2017.06.003_b0160","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1108\/F-07-2013-0057","article-title":"Impacts of poor quality of information in the facility management field","volume":"33","author":"Jylh\u00e4","year":"2015","journal-title":"Facilities"},{"key":"10.1016\/j.aei.2017.06.003_b0165","series-title":"Proceedings of ASCE International Workshop on Computing in Civil Engineering","article-title":"Efficient and effective quality assessment of As-Is building information models and 3D laser-scanned data","author":"Tang","year":"2011"},{"key":"10.1016\/j.aei.2017.06.003_b0170","series-title":"Data Quality for the Information Age","author":"Redman","year":"1996"},{"issue":"1","key":"10.1016\/j.aei.2017.06.003_b0175","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1061\/(ASCE)0887-3801(2010)24:1(25)","article-title":"Exchange model and exchange object concepts for implementation of national BIM standards","volume":"24","author":"Eastman","year":"2010","journal-title":"J. Comput. Civil Eng."},{"key":"10.1016\/j.aei.2017.06.003_b0180","series-title":"2012 IEEE Sixth International Conference on Semantic Computing (ICSC)","first-page":"226","article-title":"Data quality principles in the semantic web","author":"Assaf","year":"2012"},{"key":"10.1016\/j.aei.2017.06.003_b0185","doi-asserted-by":"crossref","unstructured":"H.B. Cavka, S. Staub-French, E.A. Poirier, Developing Owner Information Requirements for BIM-enabled Project Delivery and Asset Lifecycle Management, 2017, in press.","DOI":"10.1016\/j.autcon.2017.08.006"},{"issue":"4","key":"10.1016\/j.aei.2017.06.003_b0190","doi-asserted-by":"crossref","first-page":"1265","DOI":"10.3390\/buildings5041265","article-title":"Evaluating the alignment of organizational and project contexts for BIM adoption: a case study of a large owner organization","volume":"5","author":"Cavka","year":"2015","journal-title":"Buildings"},{"issue":"2","key":"10.1016\/j.aei.2017.06.003_b0195","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1287\/mnsc.31.2.150","article-title":"Modeling data and process quality in multi-input, multi-output information systems","volume":"31","author":"Ballou","year":"1985","journal-title":"Manage. Sci."},{"issue":"11","key":"10.1016\/j.aei.2017.06.003_b0200","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1145\/240455.240479","article-title":"Anchoring data quality dimensions in ontological foundations","volume":"39","author":"Wand","year":"1996","journal-title":"Commun. ACM"},{"key":"10.1016\/j.aei.2017.06.003_b0205","series-title":"Understanding Information Retrieval Systems: Management, Types, and Standards","first-page":"269","article-title":"Data and data quality","author":"Redman","year":"2011"},{"key":"10.1016\/j.aei.2017.06.003_b0210","series-title":"A Dictionary of Statistical Terms","author":"Marriott","year":"1991"},{"key":"10.1016\/j.aei.2017.06.003_b0215","series-title":"Proceedings of the Conference on Information Quality, Cambridge","first-page":"154","article-title":"DoD guidelines on data quality management","author":"Cykana","year":"1996"},{"key":"10.1016\/j.aei.2017.06.003_b0220","series-title":"Data Quality: The Field Guide, Data management series","author":"Redman","year":"2001"},{"key":"10.1016\/j.aei.2017.06.003_b0225","unstructured":"M.J. Pratt, Extension of ISO 10303, the STEP standard, for the exchange of procedural shape models, in: Proceedings of Shape Modeling Applications, 2004, 2004, pp. 317\u2013326."},{"key":"10.1016\/j.aei.2017.06.003_b0230","unstructured":"BSI, New BIM standard reduces asset management costs even further \u2223 BSI Group, 2014. ."},{"key":"10.1016\/j.aei.2017.06.003_b0235","unstructured":"J. Messner, C. Anumba, C. Dubler, S. Goddman, C. Kasprzak, R. Kreider, R. Leicht, C. Saluja, N. Zikic, BIM Project Execution Planning Guide, Tech. Rep., 2010."}],"container-title":["Advanced Engineering Informatics"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1474034616304670?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1474034616304670?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,9,29]],"date-time":"2019-09-29T16:27:28Z","timestamp":1569774448000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S1474034616304670"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,8]]},"references-count":47,"alternative-id":["S1474034616304670"],"URL":"https:\/\/doi.org\/10.1016\/j.aei.2017.06.003","relation":{},"ISSN":["1474-0346"],"issn-type":[{"value":"1474-0346","type":"print"}],"subject":[],"published":{"date-parts":[[2017,8]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Information Quality Assessment for Facility Management","name":"articletitle","label":"Article Title"},{"value":"Advanced Engineering Informatics","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.aei.2017.06.003","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2017 Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}]}}