{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,2]],"date-time":"2022-04-02T14:16:55Z","timestamp":1648909015145},"reference-count":28,"publisher":"Springer Science and Business Media LLC","issue":"S2","license":[{"start":{"date-parts":[[2017,4,12]],"date-time":"2017-04-12T00:00:00Z","timestamp":1491955200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2017,11]]},"DOI":"10.1007\/s13198-017-0614-8","type":"journal-article","created":{"date-parts":[[2017,4,12]],"date-time":"2017-04-12T16:17:44Z","timestamp":1492013864000},"page":"1450-1460","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Availability based operational behavior of B-Pan crystallization system in the sugar industry"],"prefix":"10.1007","volume":"8","author":[{"given":"M. S.","family":"Kadyan","sequence":"first","affiliation":[]},{"given":"Ramesh","family":"Kumar","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,4,12]]},"reference":[{"issue":"1","key":"614_CR1","first-page":"538","volume":"8","author":"K Aggarwal","year":"2014","unstructured":"Aggarwal K, Singh V, Kumar S (2014) Availability analysis and performance optimization of a butter oil production system: a case study. Int J Syst Assur Eng Manag 8(1):538\u2013554","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"5","key":"614_CR2","doi-asserted-by":"crossref","first-page":"795","DOI":"10.1016\/0026-2714(95)00115-8","volume":"37","author":"N Arora","year":"1997","unstructured":"Arora N, Kumar D (1997) Availability analysis of steam and power generation systems in the thermal power plant. Microelectron Reliab 37(5):795\u2013799","journal-title":"Microelectron Reliab"},{"key":"614_CR3","unstructured":"Balagurusamy E (2009) Reliability engineering. Tata Mcgraw Hill"},{"key":"614_CR4","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1017\/S0305004100030437","volume":"51","author":"DR Cox","year":"1955","unstructured":"Cox DR (1955) Analysis of Non Markovian stochastic processes by the inclusion of supplementary variable. Proc Comb Philos Soc 51:433\u2013441","journal-title":"Proc Comb Philos Soc"},{"issue":"3","key":"614_CR5","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1007\/s13198-013-0167-4","volume":"4","author":"SM Famurewa","year":"2013","unstructured":"Famurewa SM, Asplund M, Galar D, Kumar U (2013) Implementation of performance based maintenance contracting in railway industries. Int J Syst Assur Eng Mang 4(3):231\u2013240","journal-title":"Int J Syst Assur Eng Mang"},{"issue":"1","key":"614_CR6","doi-asserted-by":"crossref","first-page":"104","DOI":"10.1504\/IJRS.2010.029567","volume":"4","author":"S Garg","year":"2010","unstructured":"Garg S, Singh J, Singh DV (2010) Availability and maintenance scheduling of a repairable block-board manufacturing system. Int J Reliab Saf 4(1):104\u2013118","journal-title":"Int J Reliab Saf"},{"issue":"2","key":"614_CR7","doi-asserted-by":"crossref","first-page":"30","DOI":"10.1109\/TR.1963.5218202","volume":"R-12","author":"DP Gaver","year":"1963","unstructured":"Gaver DP (1963) Time to failure and availability of parallel system with repair. IEEE Trans Reliab R-12(2):30\u201338","journal-title":"IEEE Trans Reliab"},{"issue":"4","key":"614_CR8","doi-asserted-by":"crossref","first-page":"404","DOI":"10.1108\/02656710710740563","volume":"27","author":"P Gupta","year":"2007","unstructured":"Gupta P, Lal AK, Sharma RK, Singh J (2007) Analysis of reliability and availability of serial processes of plastic-pipe manufacturing plant. Int J Qual Reliab Manag 27(4):404\u2013419","journal-title":"Int J Qual Reliab Manag"},{"issue":"3","key":"614_CR9","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1108\/02656710510582507","volume":"2","author":"P Gupta","year":"2014","unstructured":"Gupta P, Lal AK, Sharma RK, Singh J (2014) Numerical analysis of reliability and availability of the serial processes in butter-oil processing plant. Int J Qual Reliab Manag 2(3):303\u2013316","journal-title":"Int J Qual Reliab Manag"},{"key":"614_CR10","volume-title":"Reliability technology","author":"JS Gurjar","year":"2007","unstructured":"Gurjar JS (2007) Reliability technology. I.K. International, New Delhi"},{"issue":"1","key":"614_CR11","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1007\/s13198-012-0100-2","volume":"4","author":"J Jaise","year":"2013","unstructured":"Jaise J, Kumar ANB, Shanmugam NS et al (2013) Power system: a reliability assessment using FTA. Int J Syst Assur Eng Manag 4(1):78\u201385","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"1","key":"614_CR12","first-page":"301","volume":"8","author":"MS Kadyan","year":"2015","unstructured":"Kadyan MS, Kumar R (2015) Availability and profit analysis of a feeding system in sugar industry. Int J Syst Assur Eng Manag 8(1):301\u2013316","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"2","key":"614_CR13","first-page":"151","volume":"6","author":"M Kaur","year":"2013","unstructured":"Kaur M, Lal AK, Bhatia SS, Reddy AS (2013) On the use of corrective maintenance data for performance analysis of preventively maintained textile industry. J Reliab Stat Stud 6(2):151\u2013163","journal-title":"J Reliab Stat Stud"},{"issue":"2","key":"614_CR15","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1016\/0026-2714(88)90353-8","volume":"28","author":"D Kumar","year":"1989","unstructured":"Kumar D, Singh IP, Singh J (1988) Reliability analysis of the feeding system in the paper industry. Microelectron Reliab 28(2):213\u2013215","journal-title":"Microelectron Reliab"},{"issue":"5","key":"614_CR16","doi-asserted-by":"crossref","first-page":"775","DOI":"10.1016\/0026-2714(89)90177-7","volume":"29","author":"D Kumar","year":"1989","unstructured":"Kumar D, Singh J, Pandey PC (1989a) Availability of a washing system in the paper industry. Microelectron Reliab 29(5):775\u2013778","journal-title":"Microelectron Reliab"},{"key":"614_CR17","doi-asserted-by":"crossref","first-page":"293","DOI":"10.1016\/0951-8320(89)90059-8","volume":"25","author":"D Kumar","year":"1989","unstructured":"Kumar D, Singh J, Pandey PC (1989b) Maintenance planning for pulping system in paper industry. Reliab Eng Saf 25:293\u2013302","journal-title":"Reliab Eng Saf"},{"issue":"6","key":"614_CR18","doi-asserted-by":"crossref","first-page":"1025","DOI":"10.1016\/0026-2714(90)90274-Q","volume":"30","author":"D Kumar","year":"1990","unstructured":"Kumar D, Pandey PC, Singh J (1990) Design and cost analysis of a refining system in the sugar industry. Microelectron Reliab 30(6):1025\u20131028","journal-title":"Microelectron Reliab"},{"issue":"1","key":"614_CR19","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1109\/24.126677","volume":"40","author":"D Kumar","year":"1992","unstructured":"Kumar D, Singh J, Pandey PC (1992) Availability of the crystallization system in the sugar industry under common cause failure. IEEE Trans Reliab 40(1):85\u201391","journal-title":"IEEE Trans Reliab"},{"issue":"4","key":"614_CR20","doi-asserted-by":"crossref","first-page":"477","DOI":"10.1016\/0026-2714(95)00100-X","volume":"36","author":"S Kumar","year":"1996","unstructured":"Kumar S, Kumar D, Mehta NP (1996) Behavioural analysis of a shell gasification and carbon recovery process in a urea fertilizer plant. Microelectron Reliab 36(4):477\u2013480","journal-title":"Microelectron Reliab"},{"issue":"6","key":"614_CR21","doi-asserted-by":"crossref","first-page":"949","DOI":"10.1016\/S0026-2714(96)00136-9","volume":"37","author":"S Kumar","year":"1997","unstructured":"Kumar S, Mehta NP, Kumar D (1997) Steady state behavior and maintenance planning of a desulphurization system in urea fertilizer plant. Microelectron Reliab 37(6):949\u2013953","journal-title":"Microelectron Reliab"},{"issue":"9","key":"614_CR14","first-page":"1","volume":"9","author":"AK Lal","year":"2013","unstructured":"Lal AK, Kaur M, Leta S (2013) Behavioral study of piston manufacturing plant through stochastic models. J Ind Eng Int 9(9):1\u201310","journal-title":"J Ind Eng Int"},{"issue":"2","key":"614_CR22","first-page":"80","volume":"19","author":"V Modgil","year":"2012","unstructured":"Modgil V (2012) Simulation, modeling and availability analysis of sole lasting unit in shoe making industry. Int J Ind Eng Theory Appl Pract 19(2):80\u201389","journal-title":"Int J Ind Eng Theory Appl Pract"},{"issue":"1","key":"614_CR23","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/0026-2714(84)90635-8","volume":"24","author":"K Murari","year":"1984","unstructured":"Murari K, Goyal V (1984) Comparison of two unit cold standby reliability models with three types of repair facilities. Microelectron Reliab 24(1):35\u201349","journal-title":"Microelectron Reliab"},{"issue":"8","key":"614_CR24","first-page":"3981","volume":"218","author":"S Shakuntla","year":"2011","unstructured":"Shakuntla S, Lal AK, Bhatia SS, Singh J (2011) Reliability analysis of polytube industry using supplementary variable technique. Appl Math Comput 218(8):3981\u20133992","journal-title":"Appl Math Comput"},{"issue":"4","key":"614_CR25","doi-asserted-by":"crossref","first-page":"395","DOI":"10.5829\/idosi.ije.2011.24.04a.08","volume":"24","author":"SB Singh","year":"2011","unstructured":"Singh SB, Ram M, Chaube S (2011) Analysis of the reliability of a three-component system with two repairmen. Int J Eng Trans 24(4):395\u2013402","journal-title":"Int J Eng Trans"},{"issue":"1","key":"614_CR26","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1007\/s13198-014-0240-7","volume":"6","author":"RS Sinha","year":"2015","unstructured":"Sinha RS, Mukhopadhyay AK (2015) Reliability centered maintenance of cone crusher: a case study. Int J Syst Assur Eng Manag 6(1):32\u201335","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"4","key":"614_CR27","first-page":"21","volume":"5","author":"K Suleiman","year":"2013","unstructured":"Suleiman K, Ali UA, Yusuf I (2013) Stochastic analysis and performance evolution of a complex thermal power plant. Innov Syst Des Eng 5(4):21\u201332","journal-title":"Innov Syst Des Eng"},{"issue":"4","key":"614_CR28","doi-asserted-by":"crossref","first-page":"362","DOI":"10.1007\/s13198-011-0037-x","volume":"1","author":"X Zhang","year":"2010","unstructured":"Zhang X, Pham H, Johnson CR (2010) Reliability models for systems with internal and external redundancy. Int J Syst Assur Eng Manag 1(4):362\u2013369","journal-title":"Int J Syst Assur Eng Manag"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-017-0614-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-017-0614-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-017-0614-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,21]],"date-time":"2019-09-21T00:33:36Z","timestamp":1569026016000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-017-0614-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,4,12]]},"references-count":28,"journal-issue":{"issue":"S2","published-print":{"date-parts":[[2017,11]]}},"alternative-id":["614"],"URL":"https:\/\/doi.org\/10.1007\/s13198-017-0614-8","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,4,12]]}}}