{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,29]],"date-time":"2022-03-29T15:38:01Z","timestamp":1648568281958},"reference-count":32,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2013,5,31]],"date-time":"2013-05-31T00:00:00Z","timestamp":1369958400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2013,9]]},"DOI":"10.1007\/s13198-013-0167-4","type":"journal-article","created":{"date-parts":[[2013,5,30]],"date-time":"2013-05-30T06:18:20Z","timestamp":1369894700000},"page":"231-240","source":"Crossref","is-referenced-by-count":10,"title":["Implementation of performance based maintenance contracting in railway industries"],"prefix":"10.1007","volume":"4","author":[{"given":"Stephen M.","family":"Famurewa","sequence":"first","affiliation":[]},{"given":"Matthias","family":"Asplund","sequence":"additional","affiliation":[]},{"given":"Diego","family":"Galar","sequence":"additional","affiliation":[]},{"given":"Uday","family":"Kumar","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,5,31]]},"reference":[{"key":"167_CR1","unstructured":"\u00c5hr\u00e9n T, Kumar U (2004) \u201cUse of maintenance performance indicators: a case study at Banverket\u201d. In: Conference proceedings of the 5th Asia\u2013Pacific industrial engineering and management systems conference (APIEMS2004), Gold Coast"},{"issue":"1","key":"167_CR2","doi-asserted-by":"crossref","first-page":"2","DOI":"10.2202\/1446-9022.1136","volume":"7","author":"G Alexandersson","year":"2008","unstructured":"Alexandersson G, Hult\u00e9n S (2008) The Swedish railway deregulation path. Rev Netw Econ 7(1):2","journal-title":"Rev Netw Econ"},{"issue":"2","key":"167_CR3","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1016\/S0007-6813(00)88558-4","volume":"43","author":"S Allen","year":"2000","unstructured":"Allen S (2000) Outsourcing services: the contract is just the beginning. Bus Horizons 43(2):25","journal-title":"Bus Horizons"},{"key":"167_CR4","unstructured":"Arasteh Khouy U, Juntti A, Nissen, Schunnesson H (2011) \u201cEvaluation of track geometry maintenance (Tamping) in Swedish heavy haul railroad\u2014a case study\u201d. In: International Heavy Haul Association Conference, 2011"},{"issue":"5","key":"167_CR5","doi-asserted-by":"crossref","first-page":"522","DOI":"10.1108\/01443579710167230","volume":"17","author":"US Bititci","year":"1997","unstructured":"Bititci US (1997) Integrated performance measurement systems: a development guide. Int J Operations Prod Manag 17(5):522\u2013534","journal-title":"Int J Operations Prod Manag"},{"key":"167_CR6","volume-title":"Outsourcing: A Guide to selecting the correct business unit. Negotiating the contract. Maintaining control of the process","author":"SM Bragg","year":"2006","unstructured":"Bragg SM (2006) Outsourcing: A Guide to selecting the correct business unit. Negotiating the contract. Maintaining control of the process. Wiley Inc., Hoboken"},{"issue":"3","key":"167_CR7","doi-asserted-by":"crossref","first-page":"18","DOI":"10.1108\/13552519510096369","volume":"1","author":"JD Campbell","year":"1995","unstructured":"Campbell JD (1995) Outsourcing in maintenance management: a valid alternative to self-provision. J Qual Maintenance Eng 1(3):18\u201324","journal-title":"J Qual Maintenance Eng"},{"issue":"4","key":"167_CR8","doi-asserted-by":"crossref","first-page":"901","DOI":"10.1111\/j.1540-5915.1998.tb00881.x","volume":"29","author":"P Chalos","year":"1998","unstructured":"Chalos P (1998) Outsourcing decisions and managerial incentives. Decis Sci 29(4):901","journal-title":"Decis Sci"},{"key":"167_CR9","unstructured":"Espling (2007) \u201cMaintenance strategy for a railway infrastructure in a regulated environment\u201d. Doctoral Thesis, Lule\u00e5 University of Technology, Lule\u00e5"},{"key":"167_CR10","unstructured":"European Committee for Standardization (CEN) (2007) \u201cEN-15341; maintenance\u2013maintenance key performance indicators,\u201d European Standard 2007"},{"key":"167_CR11","unstructured":"European Committee for Standardization (CEN) (2010) \u201cMaintenance terminology: EN 13306,\u201d European Standard 2010"},{"key":"167_CR12","unstructured":"European Committee for Standardization (CEN) (2012) \u201cprEN-13848; railway applications\u2014track\u2014track geometry quality\u2014part 6: characterisation of track geometry quality,\u201d European Standard 2012"},{"key":"167_CR13","first-page":"479","volume-title":"Handbook of maintenance management and engineering","author":"AE Haroun","year":"2009","unstructured":"Haroun AE, Duffuaa SO (2009) Maintenance organisation. In: Ben-Daya M, Duffuaa SO, Raouf A, Knezevic J, Ait-Kadi D (eds) Handbook of maintenance management and engineering. Springer, London, pp 479\u2013498"},{"key":"167_CR14","unstructured":"Hyman WA (2009) Performance-based contracting for maintenance: a synthesis of highway practice, National Cooperative Highway Research Program: NCHRP synthesis, p 389"},{"issue":"2","key":"167_CR15","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1002\/tie.20048","volume":"47","author":"A Kakabadse","year":"2005","unstructured":"Kakabadse A (2005) Outsourcing: current and future trends. Thunderbird Int Bus Rev 47(2):183","journal-title":"Thunderbird Int Bus Rev"},{"issue":"1","key":"167_CR16","doi-asserted-by":"crossref","first-page":"87","DOI":"10.2308\/acch.2001.15.1.87","volume":"15","author":"RS Kaplan","year":"2001","unstructured":"Kaplan RS, Norton DP (2001) Transforming the balanced scorecard from performance measurement to strategic management: part 1. Account Horizons 15(1):87\u2013104","journal-title":"Account Horizons"},{"key":"167_CR17","doi-asserted-by":"crossref","first-page":"773","DOI":"10.1007\/978-1-84800-131-2_47","volume-title":"Handbook on performability engineering","author":"U Kumar","year":"2008","unstructured":"Kumar U (2008) System maintenance: trends in management and technology. In: Misra KB (ed) Handbook on performability engineering. Springer, London, pp 773\u2013787"},{"key":"167_CR18","doi-asserted-by":"crossref","first-page":"459","DOI":"10.1007\/978-1-84800-011-7_19","volume-title":"Complex system maintenance handbook","author":"U Kumar","year":"2008","unstructured":"Kumar U, Parida A (2008) Maintenance performance measurement (MPM) system. In: Kobbacy KAH, Murthy DNP (eds) Complex system maintenance handbook. Springer, London, pp 459\u2013478"},{"issue":"2","key":"167_CR19","first-page":"78","volume":"12","author":"M Levery","year":"2002","unstructured":"Levery M (2002) Making maintenance contracts perform. Eng Manag J 12(2):78\u201382","journal-title":"Eng Manag J"},{"issue":"3","key":"167_CR20","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1049\/em:20040308","volume":"14","author":"M Levery","year":"2004","unstructured":"Levery M (2004) Insourcing maintenance: from railtrack to network rail. Eng Manag J 14(3):38\u201341","journal-title":"Eng Manag J"},{"issue":"2","key":"167_CR21","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1108\/13552519710167700","volume":"3","author":"H Martin","year":"1997","unstructured":"Martin H (1997) Contracting out maintenance and a plan for future research. J Qual Maintenance Eng 3(2):81\u201390","journal-title":"J Qual Maintenance Eng"},{"key":"167_CR22","volume-title":"Synthesis of innovative contracting strategies used for routine and preventive maintenance contracts","author":"CL Menches","year":"2010","unstructured":"Menches CL, Khwaja N, Chen J (2010) Synthesis of innovative contracting strategies used for routine and preventive maintenance contracts. University of Texas, Citeseer"},{"key":"167_CR23","volume-title":"Complex system maintenance handbook","author":"DNP Murthy","year":"2008","unstructured":"Murthy DNP, Kobbacy KAH (2008) Complex system maintenance handbook. Springer, London"},{"issue":"12","key":"167_CR24","doi-asserted-by":"crossref","first-page":"1228","DOI":"10.1108\/01443570510633639","volume":"25","author":"A Neely","year":"2005","unstructured":"Neely A (2005) Performance measurement system design: a literature review and research agenda. Int J Operations Prod Manag 25(12):1228","journal-title":"Int J Operations Prod Manag"},{"issue":"2","key":"167_CR25","first-page":"103","volume":"5","author":"B Nystr\u00f6m","year":"2009","unstructured":"Nystr\u00f6m B (2009) Use of availability concepts in the railway system. Int J Performability Eng 5(2):103\u2013118","journal-title":"Int J Performability Eng"},{"issue":"4","key":"167_CR26","doi-asserted-by":"crossref","first-page":"234","DOI":"10.1108\/13552510410564855","volume":"10","author":"U Olsson","year":"2004","unstructured":"Olsson U, Espling U (2004) Part I. A framework of partnering for infrastructure maintenance. J Qual Maintenance Eng 10(4):234\u2013247","journal-title":"J Qual Maintenance Eng"},{"issue":"4","key":"167_CR27","first-page":"43","volume":"35","author":"JB Quinn","year":"1994","unstructured":"Quinn JB, Hilmer FG (1994) Strategic outsourcing. MIT Sloan Manag Rev 35(4):43","journal-title":"MIT Sloan Manag Rev"},{"key":"167_CR28","unstructured":"Stankevich N, Qureshi N, Queiroz C (2005) Performance-based contracting for preservation and improvement of road assets, Transport Note, vol TN-27 2005"},{"key":"167_CR29","unstructured":"Stenstr\u00f6m C, Parida A, Galar D (2012) \u201cMaintenance performance indicators for railway infrastructure management\u201d. In: Proceedings of the first international conference on railway technology: research, development and maintenance, 2012"},{"issue":"2","key":"167_CR30","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1108\/14725960710751870","volume":"5","author":"A Straub","year":"2007","unstructured":"Straub A (2007) Performance-based maintenance partnering: a promising concept. J Facil Manag 5(2):129","journal-title":"J Facil Manag"},{"issue":"1","key":"167_CR31","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0019-8501(99)00090-5","volume":"30","author":"S Stremersch","year":"2001","unstructured":"Stremersch S, Wuyts S, Frambach RT (2001) The purchasing of full-service contracts: an exploratory study within the industrial maintenance market. Ind Mark Manag 30(1):1\u201312","journal-title":"Ind Mark Manag"},{"key":"167_CR32","unstructured":"Zietlow G (2004) Implementing performance-based road management and maintenance contracts in developing countries\u2014an instrument of German Technical Cooperation. Available. http:\/\/zietlow.com\/docs\/PBMMC-GTZ.pdf . Accessed 30 June 2011"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-013-0167-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-013-0167-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-013-0167-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T10:48:43Z","timestamp":1559472523000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-013-0167-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,5,31]]},"references-count":32,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2013,9]]}},"alternative-id":["167"],"URL":"https:\/\/doi.org\/10.1007\/s13198-013-0167-4","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,5,31]]}}}