{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,8,17]],"date-time":"2023-08-17T11:29:01Z","timestamp":1692271741143},"reference-count":5,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2013,2,12]],"date-time":"2013-02-12T00:00:00Z","timestamp":1360627200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2013,3]]},"DOI":"10.1007\/s13198-013-0144-y","type":"journal-article","created":{"date-parts":[[2013,2,11]],"date-time":"2013-02-11T07:02:17Z","timestamp":1360566137000},"page":"94-100","source":"Crossref","is-referenced-by-count":13,"title":["Reliability modeling of a computer system with preventive maintenance and priority subject to maximum operation and repair times"],"prefix":"10.1007","volume":"4","author":[{"given":"S. C.","family":"Malik","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,2,12]]},"reference":[{"key":"144_CR1","unstructured":"Friedman MA, Tran P (1992) Reliability techniques for combined hardware\/software systems. In: Proceedings of annual reliability and maintability symposiym, pp 290\u2013293"},{"issue":"7","key":"144_CR2","first-page":"2622","volume":"3","author":"A Kumar","year":"2012","unstructured":"Kumar A, Malik SC, Barak MS (2012) Reliability modeling of a computer system with independent H\/W and S\/W failures subject to maximum operation and repair times. Int J Math Arch 3(7):2622\u20132630","journal-title":"Int J Math Arch"},{"key":"144_CR3","unstructured":"Malik SC, Anand J (2010) Reliability and economic analysis of a computer system with independent hardware and software failures. Bull Pure Appl Sci 29E (Math. & Stat.)(1):141\u2013153"},{"key":"144_CR4","unstructured":"Malik SC, Nandal P (2010) Cost-analysis of stochastic models with priority to repair over preventive maintenance subject to maximum operation time. Learning manual on modeling, optimization and their applications, Edited Book. Excel India Publishers, pp 165\u2013178"},{"issue":"4","key":"144_CR5","first-page":"379","volume":"2","author":"SC Malik","year":"2012","unstructured":"Malik SC, Sureria JK (2012) Reliability and economic analysis of a computer system with priority to H\/w repair over S\/W replacement. Int J Stat Anal 2(4):379\u2013389","journal-title":"Int J Stat Anal"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-013-0144-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-013-0144-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-013-0144-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T14:48:42Z","timestamp":1559486922000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-013-0144-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,2,12]]},"references-count":5,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2013,3]]}},"alternative-id":["144"],"URL":"https:\/\/doi.org\/10.1007\/s13198-013-0144-y","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,2,12]]}}}