{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,10]],"date-time":"2024-08-10T00:56:35Z","timestamp":1723251395359},"reference-count":88,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2012,8,14]],"date-time":"2012-08-14T00:00:00Z","timestamp":1344902400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2013,12]]},"DOI":"10.1007\/s13198-012-0122-9","type":"journal-article","created":{"date-parts":[[2012,8,13]],"date-time":"2012-08-13T07:00:54Z","timestamp":1344841254000},"page":"365-377","source":"Crossref","is-referenced-by-count":50,"title":["Analysis of barriers of total productive maintenance (TPM)"],"prefix":"10.1007","volume":"4","author":[{"given":"Rajesh","family":"Attri","sequence":"first","affiliation":[]},{"given":"Sandeep","family":"Grover","sequence":"additional","affiliation":[]},{"given":"Nikhil","family":"Dev","sequence":"additional","affiliation":[]},{"given":"Deepak","family":"Kumar","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2012,8,14]]},"reference":[{"issue":"9","key":"122_CR1","doi-asserted-by":"crossref","first-page":"842","DOI":"10.1108\/01443579710171190","volume":"17","author":"EE Adam","year":"1997","unstructured":"Adam EE, Corbett LM, Flores BE, Harrison NJ, Lee TS, Rho BH, Ribera J, Samson D, Westbrook R (1997) An international study of quality improvement approach and firm performance. Int J Oper Prod Manag 17(9):842\u2013873","journal-title":"Int J Oper Prod Manag"},{"key":"122_CR2","doi-asserted-by":"crossref","first-page":"443","DOI":"10.1016\/j.indmarman.2005.12.004","volume":"36","author":"A Agarwal","year":"2006","unstructured":"Agarwal A, Shankar R, Tiwari MK (2006) Modeling agility of supply chain. Ind Mark Manag 36:443\u2013457","journal-title":"Ind Mark Manag"},{"issue":"2","key":"122_CR3","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1108\/13552510810877647","volume":"14","author":"IPS Ahuja","year":"2008","unstructured":"Ahuja IPS, Khamba JS (2008a) Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry. J Qual Maint Eng 14(2):123\u2013147","journal-title":"J Qual Maint Eng"},{"issue":"7","key":"122_CR4","doi-asserted-by":"crossref","first-page":"709","DOI":"10.1108\/02656710810890890","volume":"25","author":"IPS Ahuja","year":"2008","unstructured":"Ahuja IPS, Khamba JS (2008b) Total productive maintenance: literature review and directions. Int J Qual Reliab Manag 25(7):709\u2013756","journal-title":"Int J Qual Reliab Manag"},{"issue":"2","key":"122_CR5","first-page":"144","volume":"25","author":"IPS Ahuja","year":"2008","unstructured":"Ahuja IPS, Khamba JS (2008c) An evaluation of TPM initiatives in Indian industry for enhanced manufacturing performance. Int J Qual Reliab Manag 25(2):144\u2013172","journal-title":"Int J Qual Reliab Manag"},{"issue":"3","key":"122_CR6","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1108\/13552510910983198","volume":"15","author":"IPS Ahuja","year":"2009","unstructured":"Ahuja IPS, Kumar P (2009) A case study of total productive maintenance implementation at precision tube mills. J Qual in Maint Eng 15(3):241\u2013258","journal-title":"J Qual in Maint Eng"},{"key":"122_CR7","doi-asserted-by":"crossref","unstructured":"Attri R, Grover S, Dev N, Kumar D (2012) An ISM approach for modelling the enablers in the implementation of Total Productive Maintenance (TPM). Int J Syst Ass Eng Manage. doi: 10.1007\/s13198-012-0088-7","DOI":"10.1007\/s13198-012-0088-7"},{"key":"122_CR8","doi-asserted-by":"crossref","unstructured":"Baglee D (2008) Maintenance strategy development within SME\u2019s: The development of an integrated approach. International conference on maintenance IMC-2008","DOI":"10.3182\/20081205-2-CL-4009.00040"},{"key":"122_CR9","unstructured":"Bakerjan R (1994) Tool and manufacturing engineers handbook, vol 7, Continuous improvement, 4th edn. An ASME Publication, New York, Chap 15"},{"issue":"3","key":"122_CR10","doi-asserted-by":"crossref","first-page":"162","DOI":"10.1108\/13552519910282601","volume":"5","author":"CJ Bamber","year":"1999","unstructured":"Bamber CJ, Sharp JM, Hides M (1999) Factors affecting successful implementation of total productive maintenance: a UK manufacturing case study perspective. J Qual Maint Eng 5(3):162\u2013181","journal-title":"J Qual Maint Eng"},{"key":"122_CR11","first-page":"332","volume-title":"Operations management for global economy challenges and prospects","author":"DK Banwet","year":"1999","unstructured":"Banwet DK, Arora R (1999) Enablers and inhibitors of e-commerce implementation in India-an interpretive structural modelling (ISM) approach. In: Kanda A et al (eds) Operations management for global economy challenges and prospects. Phoenix, New Delhi, pp 332\u2013341"},{"issue":"1","key":"122_CR12","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1504\/IJASM.2007.015684","volume":"2","author":"A Barve","year":"2007","unstructured":"Barve A, Kanda A, Shankar R (2007) Analysis of interaction among the barriers of third party logistics. Int J Agile Syst Manag 2(1):109\u2013129","journal-title":"Int J Agile Syst Manag"},{"issue":"5","key":"122_CR13","first-page":"30","volume":"82","author":"SW Becker","year":"1993","unstructured":"Becker SW (1993) TQM does work: ten reasons why misguided efforts fail. Manag Rev 82(5):30\u201334","journal-title":"Manag Rev"},{"issue":"2","key":"122_CR14","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1108\/13552519710167692","volume":"3","author":"BS Blanchard","year":"1997","unstructured":"Blanchard BS (1997) An enhanced approach for implementing total productive maintenance in the manufacturing environment. J Qual Maint Eng 3(2):69\u201380","journal-title":"J Qual Maint Eng"},{"issue":"6","key":"122_CR15","doi-asserted-by":"crossref","first-page":"877","DOI":"10.1108\/00251740510603619","volume":"43","author":"R Bolanos","year":"2005","unstructured":"Bolanos R, Fontela E, Nenclares A, Paster P (2005) Using interpretive structural modeling in strategic decision making groups. Manag Dec 43(6):877\u2013895","journal-title":"Manag Dec"},{"key":"122_CR16","doi-asserted-by":"crossref","unstructured":"Borade AB and Bansod SV (2011) Interpretive structural modelling-based framework for VMI adoption in Indian industries. Int J Adv Manuf Technol. doi: 10.1007\/s00170-011-3458-4","DOI":"10.1007\/s00170-011-3458-4"},{"key":"122_CR17","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1016\/j.ijpe.2003.10.021","volume":"95","author":"FTS Chan","year":"2005","unstructured":"Chan FTS, Lau HCW, Ip RWL, Chan HK, Kong S (2005) Implementation of total productive maintenance: a case study. Int J Prod Econ 95:71\u201394","journal-title":"Int J Prod Econ"},{"key":"122_CR18","doi-asserted-by":"crossref","first-page":"1081","DOI":"10.1007\/s00170-008-1788-7","volume":"43","author":"S Chidambaranathan","year":"2009","unstructured":"Chidambaranathan S, Muralidharan C, Deshmukh SG (2009) Analyzing the interaction of critical factors of supplier development using interpretive structural modeling\u2014an empirical study. Int J Adv Manuf Technol 43:1081\u20131093","journal-title":"Int J Adv Manuf Technol"},{"key":"122_CR19","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1108\/13552519710176872","volume":"3","author":"R Cigolini","year":"1997","unstructured":"Cigolini R, Turco F (1997) Total productive maintenance practices: a survey in Italy. J Qual Maint Eng 3:259\u2013272","journal-title":"J Qual Maint Eng"},{"issue":"1","key":"122_CR20","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1108\/01443579810192925","volume":"18","author":"HC Co","year":"1998","unstructured":"Co HC, Patuwo BE, Hu MY (1998) The human factor in advanced manufacturing technology adoption: an empirical analysis. Int J Oper Prod Manag 18(1):87\u2013106","journal-title":"Int J Oper Prod Manag"},{"issue":"9","key":"122_CR21","doi-asserted-by":"crossref","first-page":"1003","DOI":"10.1108\/02656710010378789","volume":"17","author":"FL Cooke","year":"2000","unstructured":"Cooke FL (2000) Implementing TPM in plant maintenance: some organizational barriers. Int J Qual Reliab Manag 17(9):1003\u20131016","journal-title":"Int J Qual Reliab Manag"},{"issue":"9","key":"122_CR22","doi-asserted-by":"crossref","first-page":"1561","DOI":"10.1080\/00207548808947966","volume":"26","author":"KM Crawford","year":"1988","unstructured":"Crawford KM, Blackstone JH Jr, Cox JF (1988) A study of JIT implementation and operating problems. Int J Prod Res 26(9):1561\u20131568","journal-title":"Int J Prod Res"},{"key":"122_CR23","unstructured":"Davis R (1997) Making TPM a part of factory life. TPM Exp (Project EU 1190, sponsored by DTI), Findlay"},{"issue":"4","key":"122_CR24","first-page":"532","volume":"12","author":"MN Faisal","year":"2006","unstructured":"Faisal MN, Banwat DK, Shankar R (2006) Supply chain risk mitigation: modeling the enablers. Buss Proc Manag J 12(4):532\u2013552","journal-title":"Buss Proc Manag J"},{"issue":"1","key":"122_CR25","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1504\/IJASM.2007.015682","volume":"2","author":"MN Faisal","year":"2007","unstructured":"Faisal MN, Banwat DK, Shankar R (2007a) Supply chain agility: analysing the enablers. Int J Agile Syst Manag 2(1):76\u201391","journal-title":"Int J Agile Syst Manag"},{"issue":"6","key":"122_CR26","doi-asserted-by":"crossref","first-page":"677","DOI":"10.1108\/17410390710830727","volume":"20","author":"MN Faisal","year":"2007","unstructured":"Faisal MN, Banwat DK, Shankar R (2007b) Information risks management in supply chain: an assessment and mitigation framework. J Enterp Info Manag 20(6):677\u2013699","journal-title":"J Enterp Info Manag"},{"issue":"4","key":"122_CR27","first-page":"440","volume":"9","author":"LD Fredendall","year":"1997","unstructured":"Fredendall LD, Patterson JW, Kennedy WJ, Griffin T (1997) Maintenance modeling, its strategic impact. J Manag Issue 9(4):440\u2013453","journal-title":"J Manag Issue"},{"issue":"3","key":"122_CR28","first-page":"60","volume":"2","author":"A Georgakopoulos","year":"2009","unstructured":"Georgakopoulos A (2009) Teacher effectiveness examined as a system: interpretive modelling and facilitation sessions with U.S. and Japanese Students. Int Edu Stud 2(3):60\u201376","journal-title":"Int Edu Stud"},{"key":"122_CR29","volume-title":"Successfully installing TPM in a non-Japanese plant","author":"EH Hartmann","year":"1992","unstructured":"Hartmann EH (1992) Successfully installing TPM in a non-Japanese plant. TPM Press, Allison Park"},{"key":"122_CR30","unstructured":"Hartmann E (2000) Prescription for total TPM success. Maint Tech Mag. Available at http:\/\/www.mtonline.com\/2000\/april . Accessed 17 April 2011"},{"issue":"1","key":"122_CR31","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1504\/IJASM.2007.015679","volume":"2","author":"MA Hasan","year":"2007","unstructured":"Hasan MA, Shankar R, Sarkis J (2007) A study of barriers to agile manufacturing. Int J Agile Syst Manag 2(1):1\u201322","journal-title":"Int J Agile Syst Manag"},{"issue":"6","key":"122_CR32","doi-asserted-by":"crossref","first-page":"755","DOI":"10.1016\/j.patrec.2004.09.027","volume":"26","author":"JJ Huang","year":"2005","unstructured":"Huang JJ, Tzeng GH, Ong CS (2005) Multidimensional data in multidimensional scaling using the analytic network process. Pattern Recognit Lett 26(6):755\u2013767","journal-title":"Pattern Recognit Lett"},{"issue":"3","key":"122_CR33","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1108\/13552510110404495","volume":"7","author":"F Ireland","year":"2001","unstructured":"Ireland F, Dale BG (2001) A study of total productive maintenance implementation. J Qual Maint Eng 7(3):183\u2013191","journal-title":"J Qual Maint Eng"},{"key":"122_CR34","first-page":"30","volume":"14","author":"RJ Jeszenka","year":"1993","unstructured":"Jeszenka RJ (1993) Breaking through the resistance: achieving TQM in maintenance. Plant Eng 14:30\u201332","journal-title":"Plant Eng"},{"issue":"8","key":"122_CR35","doi-asserted-by":"crossref","first-page":"700","DOI":"10.1108\/17410400410569116","volume":"53","author":"S Jharkharia","year":"2004","unstructured":"Jharkharia S, Shankar R (2004) IT-Enablement of supply chains: modelling the enablers. Int J Prod Perform Manag 53(8):700\u2013712","journal-title":"Int J Prod Perform Manag"},{"issue":"1","key":"122_CR36","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1108\/17410390510571466","volume":"18","author":"S Jharkharia","year":"2005","unstructured":"Jharkharia S, Shankar R (2005) IT-Enablement of supply chains: understanding the barriers. J Enterp Info Mana 18(1):11\u201327","journal-title":"J Enterp Info Mana"},{"issue":"11","key":"122_CR37","doi-asserted-by":"crossref","first-page":"1404","DOI":"10.1108\/EUM0000000006223","volume":"21","author":"K-Y Joeng","year":"2001","unstructured":"Joeng K-Y, Phillips DT (2001) Operational efficiency and effectiveness measurement. Int J Oper Prod Manag 21(11):1404\u20131416","journal-title":"Int J Oper Prod Manag"},{"issue":"7","key":"122_CR38","doi-asserted-by":"crossref","first-page":"18","DOI":"10.1108\/EUM0000000004012","volume":"43","author":"RS Jostes","year":"1994","unstructured":"Jostes RS, Helms MM (1994) Total productive maintenance and its link to total quality management. Work Stud 43(7):18\u201320","journal-title":"Work Stud"},{"key":"122_CR39","volume-title":"Focused equipment improvement for TPM Teams","author":"K Kaizen","year":"1997","unstructured":"Kaizen K (1997) Focused equipment improvement for TPM Teams. Productivity Press, Portland"},{"key":"122_CR40","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1007\/s00170-009-2399-7","volume":"49","author":"TC Kuo","year":"2010","unstructured":"Kuo TC, Ma H, Huang SH, Hu AH, Ching CS (2010) Barrier analysis for product service system using interpretive structured model. Int J Adv Manuf Technol 49:407\u2013417","journal-title":"Int J Adv Manuf Technol"},{"issue":"1","key":"122_CR41","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1108\/13552519910257078","volume":"5","author":"JJ Lawrence","year":"1999","unstructured":"Lawrence JJ (1999) Use mathematical modelling to give your TPM implementation effort an extra boost. J Qual Maint Eng 5(1):62\u201369","journal-title":"J Qual Maint Eng"},{"key":"122_CR42","doi-asserted-by":"crossref","unstructured":"Lee AHI, Lin C (2011) An integrated fuzzy QFD framework for new product development. Flex Serv Manuf. doi: 10.1007\/s10696-011-9076-5","DOI":"10.1007\/s10696-011-9076-5"},{"issue":"1\u20133","key":"122_CR43","first-page":"243","volume":"138","author":"WL Li","year":"2003","unstructured":"Li WL, Humphreys P, Chan LY, Kumaraswamy M (2003) Predicting purchasing performance: the role of supplier development programs. J Mater Process Technol 138(1\u20133):243\u2013249","journal-title":"J Mater Process Technol"},{"issue":"5","key":"122_CR44","doi-asserted-by":"crossref","first-page":"495","DOI":"10.1108\/01443579810206334","volume":"18","author":"O Ljungberg","year":"1998","unstructured":"Ljungberg O (1998) Measurement of overall equipment effectiveness as a basis for TPM activities. Int J Oper Prod Manag 18(5):495\u2013507","journal-title":"Int J Oper Prod Manag"},{"issue":"4","key":"122_CR45","first-page":"6","volume":"33","author":"BN Maggard","year":"1992","unstructured":"Maggard BN, Rhyne DM (1992) Total productive maintenance: a timely integration of production and maintenance. Prod Inv Manag J 33(4):6\u201310","journal-title":"Prod Inv Manag J"},{"issue":"4","key":"122_CR46","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1016\/S0272-6963(98)00021-7","volume":"16","author":"MK Malhotra","year":"1998","unstructured":"Malhotra MK, Grover V (1998) An assessment of survey research in POM: from constructs to theory. J Oper Manag 16(4):407\u2013425","journal-title":"J Oper Manag"},{"issue":"6","key":"122_CR47","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1108\/01443579410062086","volume":"14","author":"A Mandal","year":"1994","unstructured":"Mandal A, Deshmukh SG (1994) Vendor selection using interpretive structural modeling (ISM). Int J Oper Prod Manag 14(6):52\u201359","journal-title":"Int J Oper Prod Manag"},{"issue":"6","key":"122_CR48","doi-asserted-by":"crossref","first-page":"613","DOI":"10.1080\/09544129610522","volume":"7","author":"R McAdam","year":"1996","unstructured":"McAdam R, Duffner AM (1996) Implementation of total productive maintenance in support of an established total quality programme. Total Qual Manag Bus Excell 7(6):613\u2013630","journal-title":"Total Qual Manag Bus Excell"},{"key":"122_CR49","unstructured":"McCarthy D (1997) To benefit, change the way you manage. TPM Exp (Proj EU 1190, Sponsored by DTI), Findlay"},{"issue":"6","key":"122_CR50","first-page":"88","volume":"51","author":"R Moore","year":"1997","unstructured":"Moore R (1997) Combining TPM and reliability-focused maintenance. Plant Eng 51(6):88\u201390","journal-title":"Plant Eng"},{"key":"122_CR51","unstructured":"Mora E (2002) The right ingredients for a successful TPM or lean implementation available at www.tpmonline.com . Accessed 30 March 2011"},{"key":"122_CR52","volume-title":"Total productive maintenance","author":"S Nakajima","year":"1988","unstructured":"Nakajima S (1988) Total productive maintenance. Productivity Press, London"},{"issue":"1","key":"122_CR53","first-page":"93","volume":"46","author":"VC Pandey","year":"2005","unstructured":"Pandey VC, Suresh G, Ravi S (2005) An interpretive structural modelimg of enabler variables for integration in supply chain management. Productivity 46(1):93\u2013108","journal-title":"Productivity"},{"issue":"4","key":"122_CR54","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1002\/hfm.1017","volume":"11","author":"KS Park","year":"2001","unstructured":"Park KS, Han SW (2001) TPM\u2014Total Productive Maintenance: impact on competitiveness and a Framework for Successful Implementation. Hum Fact Ergo Manuf 11(4):321\u2013338","journal-title":"Hum Fact Ergo Manuf"},{"issue":"2","key":"122_CR56","first-page":"61","volume":"36","author":"JW Patterson","year":"1995","unstructured":"Patterson JW, Kennedy WJ, Fredendall LD (1995) Total productive maintenance is not for this company. Prod Inv Manag J 36(2):61\u201364","journal-title":"Prod Inv Manag J"},{"issue":"4","key":"122_CR57","first-page":"32","volume":"37","author":"JW Patterson","year":"1996","unstructured":"Patterson JW, Fredendall LD, Kennedy WJ, McGee A (1996) Adapting total productive maintenance to Asten. Inc Prod Inventory Manag J 37(4):32\u201336","journal-title":"Inc Prod Inventory Manag J"},{"issue":"2","key":"122_CR58","first-page":"151","volume":"2","author":"VR Pramod","year":"2010","unstructured":"Pramod VR, Banwet DK (2010) ISM for the inhibitors of service supply chain: a case study in a safety health environment and risk consultancy health centre. Int J Logic Eco Glob 2(2):151\u2013175","journal-title":"Int J Logic Eco Glob"},{"issue":"8","key":"122_CR59","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1108\/17410400710833001","volume":"56","author":"MN Qureshi","year":"2007","unstructured":"Qureshi MN, Kumar D, Kumar P (2007) Modeling the logistics outsourcing relationships variables to enhance shippers productivity and competitiveness in logistics supply chain. Int J Prod Perform Manag 56(8):689\u2013714","journal-title":"Int J Prod Perform Manag"},{"issue":"3","key":"122_CR60","doi-asserted-by":"crossref","first-page":"308","DOI":"10.1504\/EJIE.2010.033333","volume":"4","author":"T Raj","year":"2010","unstructured":"Raj T, Attri R (2010) Quantifying barriers to implementing total quality management (TQM). Euro J Ind Eng 4(3):308\u2013335","journal-title":"Euro J Ind Eng"},{"issue":"2","key":"122_CR61","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1504\/IJPQM.2011.041844","volume":"28","author":"T Raj","year":"2011","unstructured":"Raj T, Attri R (2011) Identification and modelling of barriers in the implementation of TQM. Int J Product Qual Manag 28(2):153\u2013179","journal-title":"Int J Product Qual Manag"},{"key":"122_CR62","unstructured":"Raj T, Shankar R, Suhaib M (2007) An ISM approach for modeling the enablers of flexible manufacturing system: The case for India. Int J Prod Res 1\u201330"},{"issue":"4","key":"122_CR63","first-page":"350","volume":"11","author":"T Raj","year":"2012","unstructured":"Raj T, Attri R, Jain V (2012) Modelling the factors affecting flexibility in FMS. Int J Ind Syst Eng 11(4):350\u2013374","journal-title":"Int J Ind Syst Eng"},{"issue":"4","key":"122_CR64","first-page":"423","volume":"2","author":"KS Rajesh","year":"2007","unstructured":"Rajesh KS, Suresh KG, Deshmukh SG (2007) Interpretive structural modelling of factors for improving competitiveness of SMEs. Int J Prod Qual Manag 2(4):423\u2013440","journal-title":"Int J Prod Qual Manag"},{"key":"122_CR65","doi-asserted-by":"crossref","first-page":"1011","DOI":"10.1016\/j.techfore.2004.07.002","volume":"72","author":"V Ravi","year":"2005","unstructured":"Ravi V, Shankar R (2005) Analysis of interactions among the barriers of reverse logistics. Techno Forecast Soc Change 72:1011\u20131029","journal-title":"Techno Forecast Soc Change"},{"issue":"4","key":"122_CR66","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1108\/17410400510593802","volume":"54","author":"V Ravi","year":"2005","unstructured":"Ravi V, Shankar R, Tiwari MK (2005) Productivity improvement of a computer hardware supply chain. Int J Prod Perform Meas 54(4):239\u2013255","journal-title":"Int J Prod Perform Meas"},{"key":"122_CR67","unstructured":"Rhyne DM (1990) Total plant performance advantages through total productive maintenance. Conference Proceedings APICS, Birmingham pp 683\u2013686"},{"issue":"4","key":"122_CR68","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1108\/02656719710170620","volume":"14","author":"J Riis","year":"1997","unstructured":"Riis J, Luxhoj J, Thorsteinsson U (1997) A situational maintenance model. Int J Qual Reliab Manag 14(4):349\u2013366","journal-title":"Int J Qual Reliab Manag"},{"key":"122_CR69","doi-asserted-by":"crossref","first-page":"276","DOI":"10.1016\/j.jmatprotec.2006.03.102","volume":"179","author":"M Rodrigues","year":"2006","unstructured":"Rodrigues M, Hatakeyama K (2006) Analysis of the fall of TPM in companies. J Mater Process Technol 179:276\u2013279","journal-title":"J Mater Process Technol"},{"key":"122_CR70","volume-title":"Interpretive structural modeling: methodology for large scale systems","author":"AP Sage","year":"1977","unstructured":"Sage AP (1977) Interpretive structural modeling: methodology for large scale systems. McGraw-Hill, New York"},{"issue":"1","key":"122_CR71","first-page":"144","volume":"3","author":"S Sahney","year":"2008","unstructured":"Sahney S (2008) Critical success factors in online retail-an application of quality function deployment and interpretive structural modelling approach. Int J Bus Inf 3(1):144\u2013163","journal-title":"Int J Bus Inf"},{"issue":"4","key":"122_CR72","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1002\/sres.3850070404","volume":"7","author":"JP Saxena","year":"1990","unstructured":"Saxena JP, Sushil, Vrat P (1990) The impact of indirect relationships in classification of variables: a MICMAC analysis for energy conservation. Syst Res 7(4):245\u2013253","journal-title":"Syst Res"},{"issue":"2","key":"122_CR73","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/0040-1625(92)90059-3","volume":"41","author":"JP Saxena","year":"1992","unstructured":"Saxena JP, Sushil, Vrat P (1992) Scenario building: a critical study of energy conservation in the Indian cement industry. Technol Forecast Soc Change 41(2):121\u2013146","journal-title":"Technol Forecast Soc Change"},{"key":"122_CR74","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1016\/0040-1625(94)00066-6","volume":"48","author":"HD Sharma","year":"1995","unstructured":"Sharma HD, Gupta AD, Sushil (1995) The objectives of waste management in India: a future inquiry. Technol Forecast Soc Change 48:285\u2013309","journal-title":"Technol Forecast Soc Change"},{"issue":"2","key":"122_CR75","doi-asserted-by":"crossref","first-page":"256","DOI":"10.1108\/02635570610649899","volume":"106","author":"RK Sharma","year":"2006","unstructured":"Sharma RK, Kumar D, Kumar P (2006) Manufacturing excellence through TPM implementation: a practical analysis. Ind Manag Data Syst 106(2):256\u2013280","journal-title":"Ind Manag Data Syst"},{"issue":"2","key":"122_CR76","first-page":"141","volume":"3","author":"MD Singh","year":"2008","unstructured":"Singh MD, Kant R (2008) Knowledge management barriers: an interpretive structural modelling approach. Int J Manag Sci Eng Manag 3(2):141\u2013150","journal-title":"Int J Manag Sci Eng Manag"},{"issue":"1","key":"122_CR77","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1108\/97279810380000356","volume":"1","author":"MD Singh","year":"2003","unstructured":"Singh MD, Shankar R, Narain R, Agarwal A (2003) An interpretive structural modeling of knowledge management in engineering industries. J Adv Manag Res 1(1):28\u201340","journal-title":"J Adv Manag Res"},{"issue":"3","key":"122_CR78","doi-asserted-by":"crossref","first-page":"232","DOI":"10.1108\/17465660710834444","volume":"2","author":"RK Singh","year":"2007","unstructured":"Singh RK, Garg SK, Deshmukh SG, Kumar M (2007) Modeling of critical success factors for implementation of AMTs. J Model Manag 2(3):232\u2013250","journal-title":"J Model Manag"},{"key":"122_CR79","volume-title":"New directions for TPM","author":"T Suzuki","year":"1992","unstructured":"Suzuki T (1992) New directions for TPM. Productivity Press, Cambridge"},{"issue":"2","key":"122_CR80","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1016\/S0925-5273(97)00113-8","volume":"53","author":"L Swanson","year":"1997","unstructured":"Swanson L (1997) An empirical study of the relationship between production technology and maintenance management. Int J Prod Econ 53(2):191\u2013207","journal-title":"Int J Prod Econ"},{"issue":"4","key":"122_CR81","doi-asserted-by":"crossref","first-page":"563","DOI":"10.1108\/14635771111147641","volume":"18","author":"F Talib","year":"2011","unstructured":"Talib F, Rahman Z, Qureshi MN (2011) Analysis of interaction among the barriers to total quality management implementation using interpretive structural modelling approach. Bench An Int J 18(4):563\u2013587","journal-title":"Bench An Int J"},{"issue":"1","key":"122_CR82","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1108\/17410400710717073","volume":"56","author":"J Thakkar","year":"2007","unstructured":"Thakkar J, Deshmukh SG, Gupta AD, Shankar R (2007) Development of Score card: an integrated approach of ISM and ANP. Int J Prod Perform Manag 56(1):25\u201359","journal-title":"Int J Prod Perform Manag"},{"issue":"1","key":"122_CR83","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1108\/17410380810843471","volume":"19","author":"J Thakkar","year":"2008","unstructured":"Thakkar J, Kanda A, Deshmukh SG (2008) Evaluation of buyer-supplier relationships using an integrated mathematical approach of interpretive structural modeling (ISM) and graph theoretic approach. J Manuf Technol Manag 19(1):92\u2013124","journal-title":"J Manuf Technol Manag"},{"issue":"2","key":"122_CR84","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1108\/02656710010304555","volume":"17","author":"AHC Tsang","year":"2000","unstructured":"Tsang AHC, Chan PK (2000) TPM Implementation in China: a case study. Int J Qual Reliab Manag 17(2):144\u2013157","journal-title":"Int J Qual Reliab Manag"},{"issue":"3","key":"122_CR85","first-page":"121","volume":"28","author":"DA Turbide","year":"1995","unstructured":"Turbide DA (1995) Japan\u2019s new advantage: total productive maintenance. Qual Prog 28(3):121\u2013123","journal-title":"Qual Prog"},{"issue":"5","key":"122_CR86","doi-asserted-by":"crossref","first-page":"655","DOI":"10.1080\/14783360600588232","volume":"17","author":"F-K Wang","year":"2006","unstructured":"Wang F-K (2006) Evaluating the efficiency of implementing total productive maintenance. Total Qual Manag 17(5):655\u2013667","journal-title":"Total Qual Manag"},{"issue":"1","key":"122_CR87","first-page":"51","volume":"4","author":"JW Warfield","year":"1974","unstructured":"Warfield JW (1974a) Developing interconnected matrices in structural modelling. IEEE Trans Syst Men Cybern 4(1):51\u201381","journal-title":"IEEE Trans Syst Men Cybern"},{"issue":"5","key":"122_CR88","doi-asserted-by":"crossref","first-page":"405","DOI":"10.1109\/TSMC.1974.4309336","volume":"4","author":"JW Warfield","year":"1974","unstructured":"Warfield JW (1974b) Toward interpretation of complex structural modelling. IEEE Trans Syst Men Cybern 4(5):405\u2013417","journal-title":"IEEE Trans Syst Men Cybern"},{"key":"122_CR89","doi-asserted-by":"crossref","first-page":"36","DOI":"10.2307\/3151410","volume":"36","author":"J Yu","year":"1983","unstructured":"Yu J, Cooper H (1983) A quantitative review of research design effects on response rates to questionnaires. J Mark Res 36:36\u201344","journal-title":"J Mark Res"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-012-0122-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-012-0122-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-012-0122-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,2]],"date-time":"2019-07-02T16:05:59Z","timestamp":1562083559000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-012-0122-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,8,14]]},"references-count":88,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2013,12]]}},"alternative-id":["122"],"URL":"https:\/\/doi.org\/10.1007\/s13198-012-0122-9","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,8,14]]}}}