{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,4,19]],"date-time":"2023-04-19T16:18:41Z","timestamp":1681921121519},"reference-count":9,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2012,5,10]],"date-time":"2012-05-10T00:00:00Z","timestamp":1336608000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2013,12]]},"DOI":"10.1007\/s13198-012-0091-z","type":"journal-article","created":{"date-parts":[[2012,5,9]],"date-time":"2012-05-09T06:17:39Z","timestamp":1336544259000},"page":"327-334","source":"Crossref","is-referenced-by-count":12,"title":["Cost benefit analysis of a two dissimilar unit cold standby system with Weibull failure and repair laws"],"prefix":"10.1007","volume":"4","author":[{"given":"Rakesh","family":"Gupta","sequence":"first","affiliation":[]},{"given":"Pankaj","family":"Kumar","sequence":"additional","affiliation":[]},{"given":"Amit","family":"Gupta","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2012,5,10]]},"reference":[{"issue":"1","key":"91_CR1","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/0026-2714(90)90009-C","volume":"30","author":"DM Brkic","year":"1990","unstructured":"Brkic DM (1990) Interval estimation of the parameters \u03b2 and \u03b7 of the two parameter Weibull distribution. Microelectron Reliab 30(1):39\u201342","journal-title":"Microelectron Reliab"},{"key":"91_CR2","doi-asserted-by":"crossref","first-page":"921","DOI":"10.1016\/0026-2714(84)90021-0","volume":"24","author":"BS Dhillon","year":"1984","unstructured":"Dhillon BS (1984) Stochastic model for evaluating probability of system failure due to human error. Microelectron Reliab 24:921\u2013924","journal-title":"Microelectron Reliab"},{"key":"91_CR3","doi-asserted-by":"crossref","first-page":"867","DOI":"10.1016\/0026-2714(83)91015-6","volume":"23","author":"BS Dhillon","year":"1975","unstructured":"Dhillon BS, Natesan J (1975) Stochastic analysis of outdoor power system in fluctuating environment. Microelectron Reliab 23:867\u2013881","journal-title":"Microelectron Reliab"},{"issue":"1","key":"91_CR4","first-page":"1","volume":"72","author":"M El-Said Khaled","year":"2010","unstructured":"El-Said Khaled M, El-Sherbeny Mohamed S (2010) Stochastic analysis of a two-unit cold standby system with two-stage repair and waiting time. Sankhya-B 72(1):1\u201310","journal-title":"Sankhya-B"},{"issue":"12","key":"91_CR5","doi-asserted-by":"crossref","first-page":"1713","DOI":"10.1016\/0026-2714(92)90269-Q","volume":"32","author":"R Gupta","year":"1992","unstructured":"Gupta R, Chaudhary A (1992) A two unit priority standby system subject to random shocks and Rayleigh failure time distribution. Microelectron Reliab 32(12):1713\u20131723","journal-title":"Microelectron Reliab"},{"key":"91_CR6","first-page":"41","volume":"9","author":"R Gupta","year":"2010","unstructured":"Gupta R, Goel CK, Tomer A (2010) Cost-benefit analysis of a three unit standby system with delayed replacement, repair and post repair. Rajasthan Acad Phy Sci 9:41\u201350","journal-title":"Rajasthan Acad Phy Sci"},{"key":"91_CR7","first-page":"171","volume":"20","author":"T Nakagawa","year":"1976","unstructured":"Nakagawa T, Osaki S (1976) A summary of optimum preventive maintenance policies for two unit standby redundant system. Oper Res 20:171\u2013187","journal-title":"Oper Res"},{"key":"91_CR8","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1057\/jors.197675","volume":"28","author":"K Okumato","year":"1977","unstructured":"Okumato K, Osaki S (1977) Optimum policies for a standby system with preventive maintenance. Oper Res Q 28:415\u2013523","journal-title":"Oper Res Q"},{"key":"91_CR9","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1016\/0026-2714(77)90150-0","volume":"16","author":"S Osaki","year":"1977","unstructured":"Osaki S, Okumato K (1977) Repair limit policies for a two unit standby redundant system with two phases repair. Microelectron Reliab 16:14\u201345","journal-title":"Microelectron Reliab"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-012-0091-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-012-0091-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-012-0091-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T14:48:41Z","timestamp":1559486921000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-012-0091-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,5,10]]},"references-count":9,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2013,12]]}},"alternative-id":["91"],"URL":"https:\/\/doi.org\/10.1007\/s13198-012-0091-z","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,5,10]]}}}