{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,12,30]],"date-time":"2024-12-30T18:54:04Z","timestamp":1735584844708},"reference-count":38,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2020,7,25]],"date-time":"2020-07-25T00:00:00Z","timestamp":1595635200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,7,25]],"date-time":"2020-07-25T00:00:00Z","timestamp":1595635200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2022,4]]},"DOI":"10.1007\/s12351-020-00587-1","type":"journal-article","created":{"date-parts":[[2020,7,25]],"date-time":"2020-07-25T10:02:26Z","timestamp":1595671346000},"page":"917-946","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["Safety stock management in a supply chain model with waiting time and price discount dependent backlogging rate in stochastic environment"],"prefix":"10.1007","volume":"22","author":[{"given":"Sumon","family":"Sarkar","sequence":"first","affiliation":[]},{"given":"Bibhas C.","family":"Giri","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2020,7,25]]},"reference":[{"key":"587_CR1","doi-asserted-by":"publisher","first-page":"3465","DOI":"10.1016\/j.apm.2010.02.035","volume":"34","author":"K Annadurai","year":"2010","unstructured":"Annadurai K, Uthayakumar R (2010) Reducing lost-sales rate in (T, R, L) inventory model with controllable lead-time. Appl Math Model 34:3465\u20133477","journal-title":"Appl Math Model"},{"key":"587_CR2","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1016\/j.ijpe.2003.09.012","volume":"92","author":"M Ben-Daya","year":"2004","unstructured":"Ben-Daya M, Hariga M (2004) Integrated single vendor single buyer model with stochastic demand and variable lead-time. Int J Prod Econ 92:75\u201380","journal-title":"Int J Prod Econ"},{"key":"587_CR3","doi-asserted-by":"publisher","DOI":"10.1002\/asmb.2126","author":"M Braglia","year":"2016","unstructured":"Braglia M, Castellano D, Frosolini M (2016a) A novel approach to safety stock management in a coordinated supply chain with controllable lead-time using present value. Appl Stoch Mod Bus Indus. https:\/\/doi.org\/10.1002\/asmb.2126","journal-title":"Appl Stoch Mod Bus Indus"},{"key":"587_CR4","doi-asserted-by":"publisher","first-page":"S221","DOI":"10.1287\/mnsc.44.12.S221","volume":"44","author":"F Chen","year":"1998","unstructured":"Chen F (1998) Echelon reorder points, installation reorder points, and the value of centralized demand information. Manag Sci 44:S221\u2013S234","journal-title":"Manag Sci"},{"key":"587_CR5","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/j.ijpe.2011.09.007","volume":"136","author":"CH Glock","year":"2012","unstructured":"Glock CH (2012) Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead-times and stochastic demand. Int J Prod Econ 136:37\u201344","journal-title":"Int J Prod Econ"},{"key":"587_CR6","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1080\/00207543.2011.644817","volume":"51","author":"CH Glock","year":"2013","unstructured":"Glock CH, Ries JM (2013) Reducing lead-time risk through multiple sourcing: the case of stochastic demand and variable lead-time. Int J Prod Res 51:43\u201356","journal-title":"Int J Prod Res"},{"issue":"1","key":"587_CR7","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1016\/j.ejor.2020.01.048","volume":"285","author":"CH Glock","year":"2020","unstructured":"Glock CH, Rekik Y, Ries JM (2020) A coordination mechanism for supply chains with capacity expansions and order-dependent lead times. Euro J Oper Res 285(1):247\u2013262","journal-title":"Euro J Oper Res"},{"key":"587_CR8","doi-asserted-by":"publisher","first-page":"434","DOI":"10.1080\/095372899232957","volume":"10","author":"MA Hariga","year":"1999","unstructured":"Hariga MA (1999) A stochastic inventory model with lead-time and lot size interaction. Prod Plan Cont 10:434\u2013438","journal-title":"Prod Plan Cont"},{"key":"587_CR9","doi-asserted-by":"publisher","first-page":"1340","DOI":"10.1057\/palgrave.jors.2601017","volume":"51","author":"MA Hariga","year":"2000","unstructured":"Hariga MA (2000) Setup cost reduction in (Q, r) policy with lot size, setup time and lead-time interactions. J Oper Res Soci 51:1340\u20131345","journal-title":"J Oper Res Soci"},{"key":"587_CR10","doi-asserted-by":"publisher","first-page":"294","DOI":"10.1016\/j.ijpe.2007.01.018","volume":"114","author":"YC Hsiao","year":"2008","unstructured":"Hsiao YC (2008) A note on integrated single vendor single buyer model with stochastic demand and variable lead-time. Int J Prod Econ 114:294\u2013297","journal-title":"Int J Prod Econ"},{"key":"587_CR11","doi-asserted-by":"publisher","first-page":"155","DOI":"10.1016\/j.ejor.2018.11.034","volume":"275","author":"Q He","year":"2019","unstructured":"He Q, Wang N, Yang Z, He Z, Jiang B (2019) Competitive collection under channel inconvenience in closed-loop supply chain. Eur J Oper Res 275:155\u2013166","journal-title":"Eur J Oper Res"},{"key":"587_CR12","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2016.10.009","author":"J Heydari","year":"2016","unstructured":"Heydari J, Zaabi-Ahmadi P, Choi TM (2016) Coordinating supply chains with stochastic demand by crashing lead-times. Comput Oper Res. https:\/\/doi.org\/10.1016\/j.cor.2016.10.009","journal-title":"Comput Oper Res"},{"key":"587_CR13","doi-asserted-by":"publisher","first-page":"4816","DOI":"10.1080\/00207543.2017.1310402","volume":"55","author":"M Khan","year":"2017","unstructured":"Khan M, Hussain M, C\u00e1rdenas-Barr\u00e1n LE (2017) Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead-time demands. Int J Prod Res 55:4816\u20134832","journal-title":"Int J Prod Res"},{"key":"587_CR14","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1080\/00207549508930136","volume":"33","author":"JS Kim","year":"1995","unstructured":"Kim JS, Benton WC (1995) Lot size dependent lead-times in a Q, R inventory system. Int J Prod Econ 33:41\u201358","journal-title":"Int J Prod Econ"},{"key":"587_CR15","first-page":"34","volume":"42","author":"SJ Kim","year":"2018","unstructured":"Kim SJ, Sarkar B, Sarkar S (2018) An inventory model with backorder price discount and stochastic lead time. DJ J Eng Appl Math 42:34\u201348","journal-title":"DJ J Eng Appl Math"},{"key":"587_CR16","first-page":"701","volume":"160","author":"WC Lee","year":"2005","unstructured":"Lee WC (2005) Inventory model involving controllable backorder rate and variable lead-time demand with the mixtures of distribution. Appl Math Comput 160:701\u2013717","journal-title":"Appl Math Comput"},{"key":"587_CR17","first-page":"1125","volume":"175","author":"WC Lee","year":"2006","unstructured":"Lee WC, Wu J-W, Hsu J-W (2006) Computational algorithm for inventory model with a service level constraint, lead-time demand with the mixture of distributions and controllable negative exponential backorder rate. Appl Math Comput 175:1125\u20131138","journal-title":"Appl Math Comput"},{"key":"587_CR18","first-page":"186","volume":"189","author":"WC Lee","year":"2007","unstructured":"Lee WC, Wu JW, Lei CL (2007) Computational algorithmic procedure for optimal inventory policy involving ordering cost reduction and back-order discounts when lead time demand is controllable. Appl Math Comput 189:186\u2013200","journal-title":"Appl Math Comput"},{"key":"587_CR19","doi-asserted-by":"publisher","first-page":"858","DOI":"10.1016\/j.cie.2011.05.019","volume":"61","author":"Y Li","year":"2011","unstructured":"Li Y, Xu X, Ye F (2011) Supply chain coordination model with controllable lead-time and service level constraint. Comput Ind Eng 61:858\u2013864","journal-title":"Comput Ind Eng"},{"key":"587_CR20","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1108\/EUM0000000001287","volume":"11","author":"CJ Liao","year":"1991","unstructured":"Liao CJ, Shyu CH (1991) An analytical determination of lead-time with normal demand. Int J Oper Prod Manag 11:72\u201378","journal-title":"Int J Oper Prod Manag"},{"key":"587_CR21","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1007\/s10288-010-0124-x","volume":"8","author":"YJ Lin","year":"2010","unstructured":"Lin YJ (2010) A stochastic periodic review integrated inventory model involving defective items, backorder price discount, and variable lead-time. 4OR Q J Oper Res 8:281\u2013297","journal-title":"4OR Q J Oper Res"},{"key":"587_CR22","first-page":"1","volume":"2","author":"P Mandal","year":"2015","unstructured":"Mandal P, Giri BC (2015) A single-vendor multi-buyer integrated model with controllable lead-time and quality improvement through reduction in defective items. Int J Syst Sci Oper Logist 2:1\u201314","journal-title":"Int J Syst Sci Oper Logist"},{"key":"587_CR23","doi-asserted-by":"publisher","first-page":"827","DOI":"10.1016\/j.ijpe.2017.09.012","volume":"193","author":"Q Mou","year":"2017","unstructured":"Mou Q, Cheng Y, Liao H (2017) A note on \u201clead-time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead-times and stochastic demand\u201d. Int J Prod Econ 193:827\u2013831","journal-title":"Int J Prod Econ"},{"key":"587_CR24","doi-asserted-by":"publisher","first-page":"3956","DOI":"10.1016\/j.jclepro.2016.10.062","volume":"142","author":"M Nematollahi","year":"2017","unstructured":"Nematollahi M, Hosseini-Motlagh SM, Heydari J (2017) Economic and social collaborative decision-making on visit interval and service level in a two-echelon pharmaceutical supply chain. J Clean Prod 142:3956\u20133969","journal-title":"J Clean Prod"},{"key":"587_CR25","doi-asserted-by":"publisher","first-page":"339","DOI":"10.1016\/S0360-8352(01)00033-X","volume":"40","author":"LY Ouyang","year":"2001","unstructured":"Ouyang LY, Chuang BR (2001) Mixture of inventory model involving variable lead-time and controllable backorder rate. Comput Ind Eng 40:339\u2013348","journal-title":"Comput Ind Eng"},{"key":"587_CR26","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/j.ijpe.2003.10.016","volume":"92","author":"LY Ouyang","year":"2004","unstructured":"Ouyang LY, Wu KS, Ho CH (2004) Integrated vendor\u2013buyer cooperative models with stochastic demand in controllable lead-time. Int J Prod Econ 92:255\u2013266","journal-title":"Int J Prod Econ"},{"key":"587_CR27","doi-asserted-by":"publisher","first-page":"387","DOI":"10.1016\/j.ijpe.2004.06.035","volume":"93","author":"JC Pan","year":"2005","unstructured":"Pan JC, Hsiao YC (2005) Integrated inventory models with controllable lead-time and backorder discount considerations. Int J Prod Econ 93:387\u2013397","journal-title":"Int J Prod Econ"},{"key":"587_CR28","doi-asserted-by":"publisher","first-page":"925","DOI":"10.1080\/00207720010004449","volume":"32","author":"CH Pan","year":"2001","unstructured":"Pan CH, Hsiao YC (2001) Inventory models with back-order discounts and variable lead-time. Int J Syst Sci 32:925\u2013929","journal-title":"Int J Syst Sci"},{"key":"587_CR29","doi-asserted-by":"publisher","DOI":"10.1007\/s12351-019-00527-8","author":"M Reza Gholamian","year":"2019","unstructured":"Reza Gholamian M, Ebrahimzadeh-Afruzi M (2019) Credit and discount incentive options for two-level supply chain coordination, under uncertain price-dependent demand. Oper Res. https:\/\/doi.org\/10.1007\/s12351-019-00527-8","journal-title":"Oper Res"},{"key":"587_CR30","doi-asserted-by":"publisher","first-page":"250","DOI":"10.1016\/j.rcim.2018.05.001","volume":"55","author":"B Sarkar","year":"2019","unstructured":"Sarkar B, Guchhait R, Sarkar M, Pareek S, Kim N (2019) Impact of safety factors and setup time reduction in a two-echelon supply chain management. Robot Compu Integr Manuf 55:250\u2013258","journal-title":"Robot Compu Integr Manuf"},{"key":"587_CR31","doi-asserted-by":"publisher","first-page":"26","DOI":"10.1016\/j.jmsy.2014.11.012","volume":"35","author":"B Sarkar","year":"2015","unstructured":"Sarkar B, Mandal B, Sarkar S (2015) Quality improvement and backorder price discount under controllable lead-time in an inventory model. J Manuf Syst 35:26\u201336","journal-title":"J Manuf Syst"},{"key":"587_CR32","first-page":"491","volume":"20","author":"S Sarkar","year":"2020","unstructured":"Sarkar S, Giri BC (2020a) A vendor\u2013buyer integrated inventory system with variable lead time and uncertain market demand. Oper Res 20:491\u2013515","journal-title":"Oper Res"},{"key":"587_CR33","first-page":"133","volume":"7","author":"S Sarkar","year":"2020","unstructured":"Sarkar S, Giri BC (2020b) Stochastic supply chain model with imperfect production and controllable defective rate. Int J Syst Sci Oper Logist 7:133\u2013146","journal-title":"Int J Syst Sci Oper Logist"},{"key":"587_CR34","doi-asserted-by":"publisher","DOI":"10.1051\/ro\/2020007","author":"S Sarkar","year":"2020","unstructured":"Sarkar S, Giri BC (2020c) Optimal ordering policy in a two-echelon supply chain model with variable backorder and demand uncertainty. Res RAIRO-Oper. https:\/\/doi.org\/10.1051\/ro\/2020007","journal-title":"Res RAIRO-Oper"},{"key":"587_CR35","doi-asserted-by":"publisher","first-page":"316","DOI":"10.1504\/IJMOR.2014.060851","volume":"6","author":"HN Soni","year":"2014","unstructured":"Soni HN, Patel KA (2014) Optimal policies for vendor-buyer inventory system involving defective items with variable lead-time and service level constraint. Int J Math Oper Res 6:316\u2013343","journal-title":"Int J Math Oper Res"},{"key":"587_CR36","first-page":"27","volume":"18","author":"RJ Tersine","year":"1982","unstructured":"Tersine RJ, Gengler M (1982) Simplified forward buying with price changes. J Purch Mater Manag 18:27\u201332","journal-title":"J Purch Mater Manag"},{"key":"587_CR37","doi-asserted-by":"publisher","first-page":"1075","DOI":"10.1007\/s13398-017-0410-y","volume":"112","author":"S Tiwari","year":"2018","unstructured":"Tiwari S, Sana SS, Sarkar S (2018) Joint economic lot sizing model with stochastic demand and controllable lead-time by reducing ordering cost and setup cost. RACSAM 112:1075\u20131099","journal-title":"RACSAM"},{"key":"587_CR38","doi-asserted-by":"publisher","first-page":"107643","DOI":"10.1016\/j.ijpe.2020.107643","volume":"226","author":"S Tiwari","year":"2020","unstructured":"Tiwari S, Kazemi N, Modak NM, C\u00e1rdenas-Barr\u00e1n LE, Sarkar S (2020) The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount. Int J Prod Econ 226:107643","journal-title":"Int J Prod Econ"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-020-00587-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-020-00587-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-020-00587-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,3,16]],"date-time":"2022-03-16T05:09:33Z","timestamp":1647407373000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-020-00587-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,7,25]]},"references-count":38,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2022,4]]}},"alternative-id":["587"],"URL":"https:\/\/doi.org\/10.1007\/s12351-020-00587-1","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,7,25]]},"assertion":[{"value":"5 September 2019","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 April 2020","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"10 July 2020","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"25 July 2020","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}