{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,10,23]],"date-time":"2023-10-23T13:01:30Z","timestamp":1698066090140},"reference-count":39,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2012,8,11]],"date-time":"2012-08-11T00:00:00Z","timestamp":1344643200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Optim Lett"],"published-print":{"date-parts":[[2014,4]]},"DOI":"10.1007\/s11590-012-0535-z","type":"journal-article","created":{"date-parts":[[2012,8,10]],"date-time":"2012-08-10T11:29:47Z","timestamp":1344598187000},"page":"1475-1485","source":"Crossref","is-referenced-by-count":10,"title":["Single machine group scheduling with time and position dependent processing times"],"prefix":"10.1007","volume":"8","author":[{"given":"Xue","family":"Huang","sequence":"first","affiliation":[]},{"given":"Ming-Zheng","family":"Wang","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2012,8,11]]},"reference":[{"key":"535_CR1","doi-asserted-by":"crossref","first-page":"711","DOI":"10.1057\/palgrave.jors.2600740","volume":"50","author":"B. Alidaee","year":"1999","unstructured":"Alidaee B., Womer N.K.: Scheduling with time dependent processing processing times: review and extensions. J. Oper. Res. Soc. 50, 711\u2013720 (1999)","journal-title":"J. Oper. Res. Soc."},{"key":"535_CR2","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1057\/palgrave.jors.2601359","volume":"53","author":"A. Bachman","year":"2002","unstructured":"Bachman A., Cheng T.C.E., Janiak A., Ng C.T.: Scheduling start time dependent jobs to minimize the total weighted completion time. J. Oper. Res. Soc. 53, 688\u2013693 (2002)","journal-title":"J. Oper. Res. Soc."},{"key":"535_CR3","unstructured":"Bachman, A., Janiak, A.: Scheduling jobs with special type of start time dependent processing time. Technical Report 34\/97, Institute of Engineering Cybernetics, Wroclaw University of Technology, Janiszewskiego 11\/17, 50-372 Wroclaw (1997)"},{"key":"535_CR4","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1057\/palgrave.jors.2601689","volume":"55","author":"A. Bachman","year":"2004","unstructured":"Bachman A., Janiak A.: Scheduling jobs with position dependent processing times. J. Oper. Res. Soc. 55, 257\u2013264 (2004)","journal-title":"J. Oper. Res. Soc."},{"key":"535_CR5","doi-asserted-by":"crossref","unstructured":"Bachman, A., Janiak, A., Kovalyov, M.Y.: Complexity of single machine scheduling problems with processing times exponentially dependent on start times. In: Operations Research Proceedings SOR 2002. Springer, Berlin (2002)","DOI":"10.1007\/978-3-642-55537-4_34"},{"key":"535_CR6","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/S0020-0190(01)00196-X","volume":"81","author":"A. Bachman","year":"2002","unstructured":"Bachman A., Janiak A., Kovalyov M.Y.: Minimizing the total weighted completion time of deteriorating jobs. Inf. Process. Lett. 81, 81\u201384 (2002)","journal-title":"Inf. Process. Lett."},{"key":"535_CR7","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1016\/j.ejor.2007.05.040","volume":"188","author":"D.: Biskup","year":"2008","unstructured":"Biskup D.:: A state-of-the-art review on scheduling with learning effects. Eur. J. Oper. Res. 188, 315\u2013329 (2008)","journal-title":"Eur. J. Oper. Res."},{"key":"535_CR8","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(02)00909-8","volume":"152","author":"T.C.E. Cheng","year":"2004","unstructured":"Cheng T.C.E., Ding Q., Lin B.M.T.: A concise survey of scheduling with time-dependent processing times. Eur. J. Oper. Res. 152, 1\u201313 (2004)","journal-title":"Eur. J. Oper. Res."},{"key":"535_CR9","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/S0377-2217(00)00312-X","volume":"135","author":"T.C.E. Cheng","year":"2001","unstructured":"Cheng T.C.E., Janiak A., Kovalyov M.Y.: Single machine batch scheduling with resource dependent setup and processing times. Eur. J. Oper. Res. 135, 177\u2013183 (2001)","journal-title":"Eur. J. Oper. Res."},{"key":"535_CR10","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1007\/s10479-004-5030-1","volume":"133","author":"T.C.E. Cheng","year":"2005","unstructured":"Cheng T.C.E., Kovalyov M.Y., Janiak A., Ng C.T.: Group scheduling with controllable setup and processing times: minimizing total weighted completion time. Ann. Oper. Res. 133, 163\u2013174 (2005)","journal-title":"Ann. Oper. Res."},{"key":"535_CR11","first-page":"39","volume-title":"Scheduling problems with resource allocation. Scheduling in computer and manufacturing systems","author":"K. Chudzik","year":"2006","unstructured":"Chudzik K., Janiak A., Lichtenstein M.: Scheduling problems with resource allocation. Scheduling in computer and manufacturing systems, pp. 39\u201367. WKL, Warszawa (2006)"},{"key":"535_CR12","first-page":"87","volume-title":"Scheduling problems with setup considerations. Scheduling in computer and manufacturing systems","author":"K. Chudzik","year":"2006","unstructured":"Chudzik K., Janiak A., Lichtenstein M.: Scheduling problems with setup considerations. Scheduling in computer and manufacturing systems, pp. 87\u201399. WKL, Warszawa (2006)"},{"key":"535_CR13","volume-title":"Time-Dependent Scheduling","author":"S. Gawiejnowicz","year":"2008","unstructured":"Gawiejnowicz S.: Time-Dependent Scheduling. Springer, Berlin (2008)"},{"key":"535_CR14","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R.L. Graham","year":"1979","unstructured":"Graham R.L., Lawler E.L., Lenstra J.K., Rinnooy Kan A.H.G.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discrete Math. 5, 287\u2013326 (1979)","journal-title":"Ann. Discrete Math."},{"key":"535_CR15","doi-asserted-by":"crossref","first-page":"750","DOI":"10.1016\/j.cie.2011.01.009","volume":"60","author":"X. Huang","year":"2011","unstructured":"Huang X., Wang M.-Z., Wang J.-B.: Single-machine group scheduling with both learning effects and deteriorating jobs. Comput. Ind. Eng. 60, 750\u2013754 (2011)","journal-title":"Comput. Ind. Eng."},{"issue":"2","key":"535_CR16","first-page":"85","volume":"28","author":"D. Iwanowski","year":"2002","unstructured":"Iwanowski D., Janiak A.: Optimal resource allocation for single machine scheduling problems with time and resource dependent processing times. Syst. Sci. (Wroclaw) 28(2), 85\u201394 (2002)","journal-title":"Syst. Sci. (Wroclaw)"},{"issue":"2","key":"535_CR17","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1007\/s10951-006-0004-6","volume":"10","author":"A. Janiak","year":"2007","unstructured":"Janiak A., Krysiak T.: Single processor scheduling with job values depending on their completion times. J. Schedul. 10(2), 129\u2013138 (2007)","journal-title":"J. Schedul."},{"issue":"1","key":"535_CR18","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/j.ijpe.2011.07.014","volume":"135","author":"A. Janiak","year":"2012","unstructured":"Janiak A., Krysiak T.: Scheduling jobs with values dependent on their completion times. Int. J. Prod. Econ. 135(1), 231\u2013241 (2012)","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"535_CR19","doi-asserted-by":"crossref","first-page":"836","DOI":"10.1016\/j.ejor.2007.11.006","volume":"193","author":"A. Janiak","year":"2009","unstructured":"Janiak A., Krysiak T., Pappis C.P., Voutsinas T.G.: A scheduling problem with job values given as a power function of their completion times. Eur. J. Oper. Res. 193(3), 836\u2013848 (2009)","journal-title":"Eur. J. Oper. Res."},{"key":"535_CR20","unstructured":"Janiak, A., Lichtenstein, M.: Some single machine scheduling problems with resource dependent set-up and processing times. In: Operations Research Proceedings 2000. Selected Papers of the Symposium on Operations Research (OR 2000), Dresden, September 9\u201312, 2000, pp. 51\u201358. Springer, Berlin (2001)"},{"key":"535_CR21","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1007\/BF02099697","volume":"57","author":"M.Y. Kovalyov","year":"1995","unstructured":"Kovalyov M.Y., Janiak A.: Single machine group scheduling with ordered criteria. Ann. Oper. Res. 57, 191\u2013201 (1995)","journal-title":"Ann. Oper. Res."},{"key":"535_CR22","doi-asserted-by":"crossref","first-page":"2099","DOI":"10.1016\/j.cor.2004.11.024","volume":"33","author":"W.-H. Kuo","year":"2006","unstructured":"Kuo W.-H., Yang D.L.: Single-machine group scheduling with a time-dependent learning effect. Comput. Oper. Res. 33, 2099\u20132112 (2006)","journal-title":"Comput. Oper. Res."},{"key":"535_CR23","doi-asserted-by":"crossref","first-page":"2159","DOI":"10.1016\/j.apm.2008.05.020","volume":"33","author":"W.C. Lee","year":"2009","unstructured":"Lee W.C., Wu C.C.: A note on single-machine group scheduling problems with position-based learning effect. Appl. Math. Model. 33, 2159\u20132163 (2009)","journal-title":"Appl. Math. Model."},{"key":"535_CR24","doi-asserted-by":"crossref","first-page":"563","DOI":"10.2307\/2392340","volume":"26","author":"J. March","year":"1981","unstructured":"March J.: Footnotes to organizational change. Admin. Sci. Q. 26, 563\u2013577 (1981)","journal-title":"Admin. Sci. Q."},{"key":"535_CR25","volume-title":"Scientific Principles of Group Technology","author":"S.P. Mitrofanov","year":"1966","unstructured":"Mitrofanov S.P.: Scientific Principles of Group Technology. National Lending Library, London (1966)"},{"key":"535_CR26","doi-asserted-by":"crossref","first-page":"586","DOI":"10.1287\/isre.1110.0359","volume":"22","author":"T. Mukhopadhyay","year":"2011","unstructured":"Mukhopadhyay T., Singh P.V., Kim S.H.: Learning curves of agents with diverse skills in information technology-enabled physician referral systems. Inf. Syst. Res. 22, 586\u2013605 (2011)","journal-title":"Inf. Syst. Res."},{"key":"535_CR27","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1016\/j.ejor.2002.11.004","volume":"162","author":"M.C. Portmann","year":"2005","unstructured":"Portmann M.C., Janiak A., Kovalyov M.Y.: Single machine group scheduling with resource dependent setup and processing times. Eur. J. Oper. Res. 162, 112\u2013121 (2005)","journal-title":"Eur. J. Oper. Res."},{"key":"535_CR28","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1057\/jors.1992.66","volume":"43","author":"C.N. Potts","year":"1992","unstructured":"Potts C.N., Van Wassenhove L.N.: Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. J. Oper. Res. Soc. 43, 395\u2013406 (1992)","journal-title":"J. Oper. Res. Soc."},{"key":"535_CR29","doi-asserted-by":"crossref","first-page":"1643","DOI":"10.1016\/j.dam.2007.02.003","volume":"155","author":"D. Shabtay","year":"2007","unstructured":"Shabtay D., Steiner G.: A survey of scheduling with controllable processing times. Discrete Appl. Math. 155, 1643\u20131666 (2007)","journal-title":"Discrete Appl. Math."},{"key":"535_CR30","unstructured":"Tuzikov, A., Janiak, A., Shafransky, Y.: Sequencing with ordered criteria, precedence and group technology constraints. Informatica 12, 61\u201388 (2001)"},{"key":"535_CR31","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1007\/s00170-008-1667-2","volume":"43","author":"J.B. Wang","year":"2009","unstructured":"Wang J.B., Gao W.J., Wang L.Y., Wang D.: Single machine group scheduling with general linear deterioration to minimize the makespan. Int. J. Adv. Manuf. Technol. 43, 146\u2013150 (2009)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"535_CR32","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1007\/s00170-011-3639-1","volume":"60","author":"J.B. Wang","year":"2012","unstructured":"Wang J.B., Huang X., Wu Y.B., Ji P.: Group scheduling with independent setup times, ready times, and deteriorating job processing times. Int. J. Adv. Manuf. Technol. 60, 643\u2013649 (2012)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"535_CR33","doi-asserted-by":"crossref","first-page":"808","DOI":"10.1007\/s00170-007-1255-x","volume":"39","author":"J.B. Wang","year":"2008","unstructured":"Wang J.B., Lin L., Shan F.: Single machine group scheduling problems with deteriorating jobs. Int. J. Adv. Manuf. Technol. 39, 808\u2013812 (2008)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"2","key":"535_CR34","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1016\/j.ipl.2004.12.018","volume":"94","author":"J.B. Wang","year":"2005","unstructured":"Wang J.B., Xia Z.Q.: Scheduling jobs under decreasing linear deterioration. Inf. Process. Lett. 94(2), 63\u201369 (2005)","journal-title":"Inf. Process. Lett."},{"key":"535_CR35","doi-asserted-by":"crossref","first-page":"692","DOI":"10.1287\/opre.43.4.692","volume":"43","author":"S. Webster","year":"1995","unstructured":"Webster S., Baker K.R.: Scheduling groups of jobs on a single machine. Oper. Res. 43, 692\u2013703 (1995)","journal-title":"Oper. Res."},{"key":"535_CR36","doi-asserted-by":"crossref","first-page":"128","DOI":"10.1016\/j.ijpe.2008.05.004","volume":"115","author":"C.C. Wu","year":"2008","unstructured":"Wu C.C., Lee W.C.: Single-machine group-scheduling problems with deteriorating setup times and job-processing times. Int. J. Prod. Econ. 115, 128\u2013133 (2008)","journal-title":"Int. J. Prod. Econ."},{"key":"535_CR37","doi-asserted-by":"crossref","first-page":"1652","DOI":"10.1016\/j.cor.2006.09.008","volume":"35","author":"C.C. Wu","year":"2008","unstructured":"Wu C.C., Shiau Y.R., Lee W.C.: Single-machine group scheduling problems with deterioration consideration. Comput. Oper. Res. 35, 1652\u20131659 (2008)","journal-title":"Comput. Oper. Res."},{"key":"535_CR38","doi-asserted-by":"crossref","first-page":"1290","DOI":"10.3724\/SP.J.1004.2009.01290","volume":"35","author":"Y. Yan","year":"2009","unstructured":"Yan Y., Wang D.Z., Wang D.W., Wang H.F.: Single machine group scheduling problems with the effects of deterioration and learning. Acta Autom. Sin. 35, 1290\u20131295 (2009)","journal-title":"Acta Autom. Sin."},{"key":"535_CR39","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1007\/s10479-011-0835-1","volume":"186","author":"X. Zhang","year":"2011","unstructured":"Zhang X., Yan G., Huang W., Tang G.: Single-machine scheduling problems with time and position dependent processing times. Ann. Oper. Res. 186, 345\u2013356 (2011)","journal-title":"Ann. Oper. Res."}],"container-title":["Optimization Letters"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-012-0535-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11590-012-0535-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11590-012-0535-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,2]],"date-time":"2019-07-02T18:23:42Z","timestamp":1562091822000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11590-012-0535-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,8,11]]},"references-count":39,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2014,4]]}},"alternative-id":["535"],"URL":"https:\/\/doi.org\/10.1007\/s11590-012-0535-z","relation":{},"ISSN":["1862-4472","1862-4480"],"issn-type":[{"value":"1862-4472","type":"print"},{"value":"1862-4480","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,8,11]]}}}