{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,31]],"date-time":"2024-07-31T17:13:29Z","timestamp":1722446009616},"reference-count":53,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2021,5,17]],"date-time":"2021-05-17T00:00:00Z","timestamp":1621209600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,5,17]],"date-time":"2021-05-17T00:00:00Z","timestamp":1621209600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001381","name":"National Research Foundation Singapore","doi-asserted-by":"publisher","award":["NRF-RSS2016-004"],"id":[{"id":"10.13039\/501100001381","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2022,8]]},"DOI":"10.1007\/s10479-021-04105-0","type":"journal-article","created":{"date-parts":[[2021,5,17]],"date-time":"2021-05-17T11:02:55Z","timestamp":1621249375000},"page":"2027-2055","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":9,"title":["Impact of uncertain demand and lead-time reduction on two-echelon supply chain"],"prefix":"10.1007","volume":"315","author":[{"given":"Sumon","family":"Sarkar","sequence":"first","affiliation":[]},{"ORCID":"http:\/\/orcid.org\/0000-0002-0499-2794","authenticated-orcid":false,"given":"Sunil","family":"Tiwari","sequence":"additional","affiliation":[]},{"given":"B. C.","family":"Giri","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,5,17]]},"reference":[{"key":"4105_CR1","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/j.apm.2017.04.011","volume":"48","author":"SM Aljazzara","year":"2017","unstructured":"Aljazzara, S. M., Jaber, M. Y., & Moussawi-Haidar, L. (2017). Coordination of a three-level supply chain (supplier-manufacturer-retailer) with permissible delay in payments and price discounts. Applied Mathematical Modelling, 48, 289\u2013302.","journal-title":"Applied Mathematical Modelling"},{"key":"4105_CR2","doi-asserted-by":"crossref","first-page":"292","DOI":"10.1111\/j.1540-5915.1986.tb00228.x","volume":"17","author":"A Banerjee","year":"1986","unstructured":"Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17, 292\u2013311.","journal-title":"Decision Sciences"},{"key":"4105_CR3","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1016\/j.ijpe.2003.09.012","volume":"92","author":"M Ben-Daya","year":"2004","unstructured":"Ben-Daya, M., & Hariga, M. (2004). Integrated single vendor single buyer model with stochastic demand and variable lead-time. International Journal of Production Economics, 92, 75\u201380.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR4","doi-asserted-by":"crossref","first-page":"579","DOI":"10.1057\/jors.1994.85","volume":"45","author":"M Ben-Daya","year":"1994","unstructured":"Ben-Daya, M., & Raouf, A. (1994). Inventory models involving lead-time as a decision variable. The Journal of the Operations Research Society, 45, 579\u2013582.","journal-title":"The Journal of the Operations Research Society"},{"key":"4105_CR5","doi-asserted-by":"publisher","DOI":"10.1002\/asmb.2126","author":"M Braglia","year":"2015","unstructured":"Braglia, M., Castellano, D., & Frosolini, M. (2015). A novel approach to safety stock management in a coordinated supply chain with controllable lead-time using present value. Applied Stochastic Models in Business and Industry. https:\/\/doi.org\/10.1002\/asmb.2126.","journal-title":"Applied Stochastic Models in Business and Industry"},{"key":"4105_CR6","doi-asserted-by":"crossref","first-page":"72","DOI":"10.1016\/j.ijpe.2019.04.027","volume":"218","author":"A Buratto","year":"2019","unstructured":"Buratto, A., Cesaretto, R., & Giovanni, P. D. (2019). Consignment contracts with cooperative programs and price discount mechanisms in a dynamic supply chain. International Journal of Production Economics, 218, 72\u201382.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR7","doi-asserted-by":"crossref","unstructured":"Cavalcante, C., & do Nascimento, T. G., & Lopes, R. S. (2016). Multi-attribute Utility Theory analysis for burn-in processes combined with replacement. Eksploatacja i Niezawodnosc-Maintenance and Reliability, 18, 599\u2013605.","DOI":"10.17531\/ein.2016.4.15"},{"key":"4105_CR8","doi-asserted-by":"crossref","first-page":"805","DOI":"10.1016\/j.ijpe.2008.03.010","volume":"114","author":"I David","year":"2008","unstructured":"David, I., & Eben-Chaime, M. (2008). How accurate is the integrated vendor continuous model? International Journal of Production Economics, 114, 805\u2013810.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR9","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1016\/j.cie.2018.12.028","volume":"131","author":"O Dey","year":"2019","unstructured":"Dey, O., & Giri, B. C. (2019). A new approach to deal with learning in inspection in an integrated vendor-buyer model with imperfect production process. Computers & Industrial Engineering, 131, 515\u2013523.","journal-title":"Computers & Industrial Engineering"},{"key":"4105_CR10","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1080\/07408170490438717","volume":"36","author":"M Eben-Chaime","year":"2004","unstructured":"Eben-Chaime, M. (2004). The effect of discreteness in vendor-buyer relationships. IIE Transactions, 36, 583\u2013589.","journal-title":"IIE Transactions"},{"key":"4105_CR11","doi-asserted-by":"crossref","first-page":"1592","DOI":"10.1016\/j.ejor.2005.10.036","volume":"176","author":"K Ertogral","year":"2007","unstructured":"Ertogral, K., Darwish, M., & Ben-Daya, M. (2007). Production and shipment lot sizing in a vendor supply chain with transportation cost. European Journal of Operational Research, 176, 1592\u20131606.","journal-title":"European Journal of Operational Research"},{"key":"4105_CR12","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/j.ijpe.2011.09.007","volume":"136","author":"CH Glock","year":"2012","unstructured":"Glock, C. H. (2012). Lead-time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead-times and stochastic demand. International Journal of Production Economics, 136, 37\u201344.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR13","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1080\/00207543.2011.644817","volume":"51","author":"CH Glock","year":"2013","unstructured":"Glock, C. H., & Ries, J. M. (2013). Reducing lead-time risk through multiple sourcing: the case of stochastic demand and variable lead-time. International Journal of Production Research, 51, 43\u201356.","journal-title":"International Journal of Production Research"},{"key":"4105_CR14","doi-asserted-by":"crossref","first-page":"402","DOI":"10.1016\/j.ejor.2014.09.045","volume":"242","author":"K Govindan","year":"2015","unstructured":"Govindan, K. (2015). The optimal replenishment policy for time-varying stochastic demand under vendor managed inventory. European Journal of Operational Research, 242, 402\u2013423.","journal-title":"European Journal of Operational Research"},{"key":"4105_CR15","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1080\/00207547708943107","volume":"15","author":"SK Goyal","year":"1976","unstructured":"Goyal, S. K. (1976). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15, 107\u2013111.","journal-title":"International Journal of Production Research"},{"key":"4105_CR16","unstructured":"Hadley, G., & Whitin, T. (1963). Analysis of inventory systems. Prentice-Hall."},{"key":"4105_CR17","doi-asserted-by":"crossref","first-page":"434","DOI":"10.1080\/095372899232957","volume":"10","author":"MA Hariga","year":"1999","unstructured":"Hariga, M. A. (1999). A stochastic inventory model with lead-time and lot size interaction. Production Planning & Control, 10, 434\u2013438.","journal-title":"Production Planning & Control"},{"key":"4105_CR18","doi-asserted-by":"crossref","first-page":"394","DOI":"10.1016\/j.cor.2016.10.009","volume":"100","author":"J Heydari","year":"2018","unstructured":"Heydari, J., Zaabi-Ahmadi, P., & Choi, T. M. (2018). Coordinating supply chains with stochastic demand by crashing lead-times. Computers & Operations Research, 100, 394\u2013403.","journal-title":"Computers & Operations Research"},{"key":"4105_CR19","doi-asserted-by":"crossref","first-page":"50","DOI":"10.1016\/j.ijpe.2017.03.015","volume":"188","author":"SJ Hossain","year":"2017","unstructured":"Hossain, S. J., Ohaiba, M., & Sarker, B. R. (2017). An optimal vendor-buyer cooperative policy under generalized lead-time distribution with penalty cost for delivery lateness. International Journal of Production Economics, 188, 50\u201362.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR20","doi-asserted-by":"crossref","first-page":"294","DOI":"10.1016\/j.ijpe.2007.01.018","volume":"114","author":"YC Hsiao","year":"2008","unstructured":"Hsiao, Y. C. (2008). A note on integrated single vendor single buyer model with stochastic demand and variable lead-time. International Journal of Production Economics, 114, 294\u2013297.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR21","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/j.ijpe.2008.06.004","volume":"115","author":"YC Hsiao","year":"2008","unstructured":"Hsiao, Y. C. (2008). Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information. International Journal of Production Economics, 115, 229\u2013235.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR22","doi-asserted-by":"crossref","first-page":"416","DOI":"10.1002\/asmb.795","volume":"26","author":"SL Hsu","year":"2009","unstructured":"Hsu, S. L., & Huang, Y. F. (2009). An integrated inventory model with controllable lead-time and distribution-free demand. Applied Stochastic Models in Business and Industry, 26, 416\u2013430.","journal-title":"Applied Stochastic Models in Business and Industry"},{"key":"4105_CR23","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/S0925-5273(03)00220-2","volume":"91","author":"CK Huang","year":"2004","unstructured":"Huang, C. K. (2004). An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration. International Journal of Production Economics, 91, 91\u201398.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR24","doi-asserted-by":"crossref","first-page":"1753","DOI":"10.1016\/j.apm.2012.04.042","volume":"37","author":"JK Jha","year":"2013","unstructured":"Jha, J. K., & Shanker, K. (2013). Single-vendor multi-buyer integrated production-inventory model with controllable lead-time and service level constraints. Applied Mathematical Modelling, 37, 1753\u20131767.","journal-title":"Applied Mathematical Modelling"},{"key":"4105_CR25","unstructured":"Juran, J. M., & Gryna, F. M. (2016). The quality control handbook (7th ed., p. 2016). McGraw- Hill."},{"key":"4105_CR26","first-page":"99","volume":"5","author":"N Kazemi","year":"2018","unstructured":"Kazemi, N., Abdul-Rashid, S. H., Ghazilla, R. A. R., Shekarian, E., & Zanoni, S. (2018). Economic order quantity models for items with imperfect quality and emission considerations. International Journal of System Science: Operations & Logistic, 5, 99\u2013115.","journal-title":"International Journal of System Science: Operations & Logistic"},{"key":"4105_CR27","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1080\/00207549508930136","volume":"33","author":"JS Kim","year":"1995","unstructured":"Kim, J. S., & Benton, W. C. (1995). Lot size dependent lead-times in a Q, R inventory system. International Journal of Production Economics, 33, 41\u201358.","journal-title":"International Journal of Production Economics"},{"issue":"2018","key":"4105_CR28","first-page":"34","volume":"42","author":"SJ Kim","year":"2018","unstructured":"Kim, S. J., Sarkar, B., & Sarkar, S. (2018). An inventory model with backorder price discount and stochastic lead-time. DJ Journal of Engineering and Applied Mathematics, 42(2018), 34\u201348.","journal-title":"DJ Journal of Engineering and Applied Mathematics"},{"key":"4105_CR29","doi-asserted-by":"crossref","first-page":"23","DOI":"10.2307\/41166208","volume":"46","author":"H Krikke","year":"2004","unstructured":"Krikke, H., Blanc, L., & Van de Velde, S. (2004). Product modularity and the design of closed-loop supply chains. California Management Review, 46, 23\u201339.","journal-title":"California Management Review"},{"key":"4105_CR30","doi-asserted-by":"crossref","first-page":"858","DOI":"10.1016\/j.cie.2011.05.019","volume":"61","author":"Y Li","year":"2011","unstructured":"Li, Y., Xu, X., & Ye, F. (2011). Supply chain coordination model with controllable lead-time and service level constraint. Computers & Industrial Engineering, 61, 858\u2013864.","journal-title":"Computers & Industrial Engineering"},{"key":"4105_CR31","doi-asserted-by":"crossref","first-page":"72","DOI":"10.1108\/EUM0000000001287","volume":"11","author":"CJ Liao","year":"1991","unstructured":"Liao, C. J., & Shyu, C. H. (1991). An analytical determination of lead-time with normal demand. International Journal of Operations & Production Management, 11, 72\u201378.","journal-title":"International Journal of Operations & Production Management"},{"key":"4105_CR32","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/j.cor.2016.02.002","volume":"72","author":"HJ Lin","year":"2016","unstructured":"Lin, H. J. (2016). Investing in lead-time variability reduction in a collaborative vendor-buyer supply chain model with stochastic lead-time. Computers & Operations Research, 72, 43\u201349.","journal-title":"Computers & Operations Research"},{"key":"4105_CR33","doi-asserted-by":"crossref","first-page":"827","DOI":"10.1016\/j.ijpe.2017.09.012","volume":"193","author":"Q Mou","year":"2017","unstructured":"Mou, Q., Cheng, Y., & Liao, H. (2017). A note on lead-time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead-times and stochastic demand. International Journal of Production Economics, 193, 827\u2013831.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"4105_CR34","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1111\/j.1475-3995.2005.00501.x","volume":"12","author":"IK Moon","year":"2005","unstructured":"Moon, I. K., & Cha, B. C. (2005). A continuous review inventory model with the controllable production rate of the manufacturer. International Transactions in Operational Research, 12(2), 247\u2013258.","journal-title":"International Transactions in Operational Research"},{"key":"4105_CR35","doi-asserted-by":"crossref","first-page":"829","DOI":"10.1057\/jors.1996.102","volume":"47","author":"LY Ouyang","year":"1996","unstructured":"Ouyang, L. Y., Yeh, N. C., & Wu, K. S. (1996). Mixture inventory model with backorders and lost sales for variable lead-time. Journal of the Operations Research Society, 47, 829\u2013832.","journal-title":"Journal of the Operations Research Society"},{"key":"4105_CR36","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1016\/j.ijpe.2003.10.016","volume":"92","author":"LY Ouyang","year":"2004","unstructured":"Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2004). Integrated vendor-buyer cooperative models with stochastic demand in controllable lead-time. International Journal of Production Economics, 92, 255\u2013266.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR37","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1016\/j.ijpe.2006.12.019","volume":"108","author":"LY Ouyang","year":"2007","unstructured":"Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2007). An integrated vendor-buyer inventory model with quality improvement and lead-time reduction. International Journal of Production Economics, 108, 349\u2013358.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR38","doi-asserted-by":"crossref","first-page":"1263","DOI":"10.1080\/00207540110105680","volume":"40","author":"JC Pan","year":"2002","unstructured":"Pan, J. C., & Yang, J. S. (2002). A study of an integrated inventory with controllable lead-time. International Journal of Production Economics, 40, 1263\u20131273.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR39","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/j.tre.2018.01.014","volume":"111","author":"B Ponte","year":"2018","unstructured":"Ponte, B., Costas, J., Puche, J., Pino, R., & Fuente, D. (2018). The value of lead-time reduction and stabilization: A comparison between traditional and collaborative supply chains. Transportation Research Part E: Logistics and Transportation Review, 111, 165\u2013185.","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"key":"4105_CR40","doi-asserted-by":"crossref","first-page":"654","DOI":"10.1016\/j.jmsy.2014.06.003","volume":"33","author":"S Priyan","year":"2014","unstructured":"Priyan, S., & Uthayakumar, R. (2014). Trade credit financing in the vendor buyer inventory system with ordering cost reduction, transportation cost and backorder price discount when the received quantity is uncertain. Journal of Manufacturing System, 33, 654\u2013674.","journal-title":"Journal of Manufacturing System"},{"key":"4105_CR41","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1016\/j.ijpe.2014.03.013","volume":"153","author":"RH Rad","year":"2014","unstructured":"Rad, R. H., Razmi, J., Sangari, M. S., & Ebrahimi, Z. F. (2014). Optimizing an integrated vendor-managed inventory system for a single-vendor two-buyer supply chain with determining weighting factor for vendor\u2019s ordering cost. International Journal of Production Economics, 153, 295\u2013308.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR42","first-page":"513","volume":"81\u201382","author":"SW Ryu","year":"2003","unstructured":"Ryu, S. W., & Lee, K. K. (2003). A stochastic inventory model of dual sourced supply chain with lead-time reduction. International Journal of Production Economics, 81\u201382, 513\u2013524.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR43","doi-asserted-by":"crossref","first-page":"961","DOI":"10.1051\/ro\/2019030","volume":"54","author":"S Sarkar","year":"2019","unstructured":"Sarkar, S., Giri, B. C., & Sarkar, A. K. (2019). A vendor-buyer inventory model with lot-size and production rate dependent lead-time under time value of money. RAIRO-Operations Research, 54, 961\u2013979.","journal-title":"RAIRO-Operations Research"},{"key":"4105_CR44","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/j.ejor.2018.06.028","volume":"272","author":"A Sainathan","year":"2018","unstructured":"Sainathan, A., & Groenevelt, H. (2018). Vendor managed inventory contracts-coordinating the supply chain while looking from the vendor\u2019s perspective. European Journal of Operational Research, 272, 249\u2013260.","journal-title":"European Journal of Operational Research"},{"issue":"2020","key":"4105_CR45","first-page":"133","volume":"2","author":"S Sarkar","year":"2020","unstructured":"Sarkar, S., & Giri, B. C. (2020). Stochastic supply chain model with imperfect production and controllable defective rate. International Journal of System Science: Operations & Logistics, 2(2020), 133\u2013146.","journal-title":"International Journal of System Science: Operations & Logistics"},{"key":"4105_CR46","doi-asserted-by":"crossref","first-page":"26","DOI":"10.1016\/j.jmsy.2014.11.012","volume":"35","author":"B Sarkar","year":"2015","unstructured":"Sarkar, B., Mandal, B., & Sarkar, S. (2015). Quality improvement and backorder price discount under controllable lead-time in an inventory model. Journal of Manufacturing System, 35, 26\u201336.","journal-title":"Journal of Manufacturing System"},{"key":"4105_CR47","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1051\/ro\/2018090","volume":"54","author":"AA Taleizadeh","year":"2020","unstructured":"Taleizadeh, A. A., Shokr, I., & Joali, F. (2020). Optimizing vendor-managed inventory systems with limited storage capacity and partial backordering under stochastic demand. RAIRO-Operations Research, 54, 179\u2013209.","journal-title":"RAIRO-Operations Research"},{"key":"4105_CR48","unstructured":"Tersine, R. J. (2002). Principles of inventory and materials management, fourthed. Prentice Hall."},{"key":"4105_CR49","doi-asserted-by":"crossref","first-page":"107643","DOI":"10.1016\/j.ijpe.2020.107643","volume":"226","author":"S Tiwari","year":"2020","unstructured":"Tiwari, S., Kazemi, N., Modak, N. M., C\u00e1rdenas-Barr\u00f3n, L. E., & Sarkar, S. (2020). The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount. International Journal of Production Economics, 226, 107643.","journal-title":"International Journal of Production Economics"},{"key":"4105_CR50","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1016\/j.jclepro.2018.04.261","volume":"192","author":"S Tiwari","year":"2018","unstructured":"Tiwari, S., Daryanto, Y., & Wee, H. M. (2018). Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission. Journal of Cleaner Production, 192, 281\u2013292.","journal-title":"Journal of Cleaner Production"},{"key":"4105_CR51","doi-asserted-by":"crossref","first-page":"1075","DOI":"10.1007\/s13398-017-0410-y","volume":"112","author":"S Tiwari","year":"2018","unstructured":"Tiwari, S., Sana, S. S., & Sarkar, S. (2018). Joint economic lot sizing model with stochastic demand and controllable lead-time by reducing ordering cost and setup cost. Revista de la Real Academia de Ciencias Exactas F\u00edsicas y Naturales. Serie A. Matem\u00e1ticas, 112, 1075\u20131099.","journal-title":"Revista de la Real Academia de Ciencias Exactas F\u00edsicas y Naturales. Serie A. Matem\u00e1ticas"},{"key":"4105_CR52","doi-asserted-by":"crossref","first-page":"853","DOI":"10.1080\/00207540310001632448","volume":"42","author":"JS Yang","year":"2004","unstructured":"Yang, J. S., & Pan, J. C. (2004). Just-in-time purchasing: An integrated inventory model involving deterministic variable lead-time and quality improvement investment. International Journal of Production Research, 42, 853\u2013863.","journal-title":"International Journal of Production Research"},{"key":"4105_CR53","doi-asserted-by":"crossref","first-page":"675","DOI":"10.1016\/j.apm.2016.10.050","volume":"42","author":"JQ Yang","year":"2017","unstructured":"Yang, J. Q., Zhang, X. M., Fu, H. Y., & Liu, C. (2017). Inventory competition in a dual-channel supply chain with delivery lead-time consideration. Applied Mathematical Modelling, 42, 675\u2013692.","journal-title":"Applied Mathematical Modelling"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-021-04105-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-021-04105-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-021-04105-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,9,19]],"date-time":"2022-09-19T19:41:35Z","timestamp":1663616495000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-021-04105-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,5,17]]},"references-count":53,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2022,8]]}},"alternative-id":["4105"],"URL":"https:\/\/doi.org\/10.1007\/s10479-021-04105-0","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,5,17]]},"assertion":[{"value":"6 May 2021","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"17 May 2021","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}