{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,21]],"date-time":"2024-09-21T11:59:25Z","timestamp":1726919965862},"reference-count":56,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2019,12,16]],"date-time":"2019-12-16T00:00:00Z","timestamp":1576454400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,12,16]],"date-time":"2019-12-16T00:00:00Z","timestamp":1576454400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["71701049","71571061"],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100003392","name":"Natural Science Foundation of Fujian Province","doi-asserted-by":"publisher","award":["2018J05120"],"id":[{"id":"10.13039\/501100003392","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Social Science Planning Foundation of Fujian Province","award":["FJ2017C013"]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2021,1]]},"DOI":"10.1007\/s10479-019-03494-7","type":"journal-article","created":{"date-parts":[[2019,12,16]],"date-time":"2019-12-16T19:03:20Z","timestamp":1576523000000},"page":"471-494","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":19,"title":["Large-scale energy-conscious bi-objective single-machine batch scheduling under time-of-use electricity tariffs via effective iterative heuristics"],"prefix":"10.1007","volume":"296","author":[{"ORCID":"http:\/\/orcid.org\/0000-0001-6259-4703","authenticated-orcid":false,"given":"Peng","family":"Wu","sequence":"first","affiliation":[]},{"given":"Junheng","family":"Cheng","sequence":"additional","affiliation":[]},{"ORCID":"http:\/\/orcid.org\/0000-0003-1225-8319","authenticated-orcid":false,"given":"Feng","family":"Chu","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2019,12,16]]},"reference":[{"key":"3494_CR1","unstructured":"APEC APERC. (2013). APEC energy demand and supply outlook-5th edition. Technical report, Asia-Pacific Economic Cooperation."},{"issue":"3","key":"3494_CR2","doi-asserted-by":"crossref","first-page":"627","DOI":"10.1016\/j.ejor.2014.06.047","volume":"240","author":"A Che","year":"2015","unstructured":"Che, A., Feng, J., Chen, H., & Chu, C. (2015). Robust optimization for the cyclic hoist scheduling problem. European Journal of Operational Research, 240(3), 627\u2013636.","journal-title":"European Journal of Operational Research"},{"key":"3494_CR3","doi-asserted-by":"crossref","first-page":"565","DOI":"10.1016\/j.jclepro.2016.03.150","volume":"129","author":"A Che","year":"2016","unstructured":"Che, A., Zeng, Y., & Lyu, K. (2016). An efficient greedy insertion heuristic for energy-conscious single machine scheduling problem under time-of-use electricity tariffs. Journal of Cleaner Production, 129, 565\u2013577.","journal-title":"Journal of Cleaner Production"},{"key":"3494_CR4","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1016\/j.jclepro.2017.04.018","volume":"156","author":"A Che","year":"2017","unstructured":"Che, A., Zhang, S., & Wu, X. (2017). Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs. Journal of Cleaner Production, 156, 688\u2013697.","journal-title":"Journal of Cleaner Production"},{"key":"3494_CR5","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1016\/j.cie.2016.12.018","volume":"105","author":"A Che","year":"2017","unstructured":"Che, A., Zhang, Y., & Feng, J. (2017). Bi-objective optimization for multi-floor facility layout problem with fixed inner configuration and room adjacency constraints. Computers & Industrial Engineering, 105, 265\u2013276.","journal-title":"Computers & Industrial Engineering"},{"issue":"4\u20135","key":"3494_CR6","doi-asserted-by":"crossref","first-page":"715","DOI":"10.1051\/ro\/2015063","volume":"50","author":"J Cheng","year":"2016","unstructured":"Cheng, J., Chu, F., Chu, C., & Xia, W. (2016a). Bi-objective optimization of single-machine batch scheduling under time-of-use electricity prices. RAIRO-Operations Research, 50(4\u20135), 715\u2013732.","journal-title":"RAIRO-Operations Research"},{"key":"3494_CR7","doi-asserted-by":"crossref","first-page":"721","DOI":"10.1016\/j.cie.2017.04.026","volume":"112","author":"J Cheng","year":"2017","unstructured":"Cheng, J., Chu, F., Liu, M., Wu, P., & Xia, W. (2017). Bi-criteria single-machine batch scheduling with machine on\/off switching under time-of-use tariffs. Computers & Industrial Engineering, 112, 721\u2013734.","journal-title":"Computers & Industrial Engineering"},{"key":"3494_CR8","doi-asserted-by":"crossref","unstructured":"Cheng, J., Chu, F., Ming, L., & Xia, W. (2016b). Single-machine batch scheduling under time-of-use tariffs: New mixed-integer programming approaches. In 2016 IEEE International Conference on Systems, Man, and Cybernetics, Budapest, Hungary (pp. 3498\u20133503). IEEE.","DOI":"10.1109\/SMC.2016.7844775"},{"key":"3494_CR9","doi-asserted-by":"crossref","unstructured":"Cheng, J., Chu, F., Xia, W., Ding, J., & Ling, X. (2014). Bi-objective optimization for single-machine batch scheduling considering energy cost. In 2014 IEEE International Conference on Control, Decision and Information Technologies (CoDIT) (pp. 236\u2013241). IEEE.","DOI":"10.1109\/CoDIT.2014.6996899"},{"key":"3494_CR10","doi-asserted-by":"crossref","first-page":"896","DOI":"10.1109\/TASE.2016.2631491","volume":"15","author":"JH Cheng","year":"2018","unstructured":"Cheng, J. H., Chu, F., & Zhou, M. C. (2018). An improved model for parallel machine scheduling under time-of-use electricity price. IEEE Transactions on Automation Science and Engineering, 15, 896\u2013899.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"key":"3494_CR11","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03290-3","author":"I Dahmani","year":"2019","unstructured":"Dahmani, I., & Hifi, M. (2019). A modified descent method-based heuristic for binary quadratic knapsack problems with conflict graphs. Annals of Operations Research,. https:\/\/doi.org\/10.1007\/s10479-019-03290-3.","journal-title":"Annals of Operations Research"},{"issue":"3","key":"3494_CR12","doi-asserted-by":"crossref","first-page":"464","DOI":"10.1016\/j.ejor.2013.08.002","volume":"232","author":"E Demir","year":"2014","unstructured":"Demir, E., Bekta\u015f, T., & Laporte, G. (2014). The bi-objective pollution-routing problem. European Journal of Operational Research, 232(3), 464\u2013478.","journal-title":"European Journal of Operational Research"},{"key":"3494_CR13","doi-asserted-by":"crossref","first-page":"1138","DOI":"10.1109\/TASE.2015.2495328","volume":"13","author":"JY Ding","year":"2016","unstructured":"Ding, J. Y., Song, S., Zhang, R., Chiong, R., & Wu, C. (2016). Parallel machine scheduling under time-of-use electricity prices: New models and optimization approaches. IEEE Transactions on Automation Science and Engineering, 13, 1138\u20131154.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"1\u20132","key":"3494_CR14","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1007\/s10479-015-2003-5","volume":"238","author":"K Fang","year":"2016","unstructured":"Fang, K., Uhan, N. A., Zhao, F., & Sutherland, J. W. (2016). Scheduling on a single machine under time-of-use electricity tariffs. Annals of Operations Research, 238(1\u20132), 199\u2013227.","journal-title":"Annals of Operations Research"},{"issue":"8","key":"3494_CR15","doi-asserted-by":"crossref","first-page":"2163","DOI":"10.1080\/00207549608905019","volume":"34","author":"M Fanti","year":"1996","unstructured":"Fanti, M., Maione, B., Piscitelli, G., & Turchiano, B. (1996). Heuristic scheduling of jobs on a multi-product batch processing machine. International Journal of Production Research, 34(8), 2163\u20132186.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"3494_CR16","first-page":"296","volume":"0","author":"YY Haimes","year":"1971","unstructured":"Haimes, Y. Y., Lasdon, L. S., & Wismer, D. A. (1971). On a bicriterion formulation of the problems of integrated system identification and system optimization. IEEE Transactions on Systems Man and Cybernetics, 0(1), 296\u2013297.","journal-title":"IEEE Transactions on Systems Man and Cybernetics"},{"key":"3494_CR17","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ijpe.2015.07.021","volume":"169","author":"ZH Jia","year":"2015","unstructured":"Jia, Z. H., Li, K., & Leung, Y. T. (2015). Effective heuristic for makespan minimization in parallel batch machines with non-identical capacities. International Journal of Production Economics, 169, 1\u201310.","journal-title":"International Journal of Production Economics"},{"key":"3494_CR18","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1016\/j.tcs.2015.02.025","volume":"580","author":"M Ji","year":"2015","unstructured":"Ji, M., Yang, Q., Yao, D., & Cheng, T. C. E. (2015). Single-machine batch scheduling of linear deteriorating jobs. Theoretical Computer Science, 580, 36\u201349.","journal-title":"Theoretical Computer Science"},{"issue":"1","key":"3494_CR19","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1080\/002075499192020","volume":"37","author":"CY Lee","year":"1999","unstructured":"Lee, C. Y. (1999). Minimizing makespan on a single batch processing machine with dynamic job arrivals. International Journal of Production Research, 37(1), 219\u2013236.","journal-title":"International Journal of Production Research"},{"key":"3494_CR20","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1023\/A:1018909801944","volume":"70","author":"CY Lee","year":"1997","unstructured":"Lee, C. Y., Lei, L., & Pinedo, M. (1997). Current trends in deterministic scheduling. Annals of Operations Research, 70, 1\u201341.","journal-title":"Annals of Operations Research"},{"key":"3494_CR21","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/j.cor.2019.02.012","volume":"106","author":"X Li","year":"2019","unstructured":"Li, X., Li, Y., & Huang, Y. (2019). Heuristics and lower bound for minimizing maximum lateness on a batch processing machine with incompatible job families. Computers & Operations Research, 106, 91\u2013101.","journal-title":"Computers & Operations Research"},{"key":"3494_CR22","doi-asserted-by":"crossref","first-page":"674","DOI":"10.1016\/j.rser.2013.01.021","volume":"21","author":"SM Lu","year":"2013","unstructured":"Lu, S. M., Lu, C., Tseng, K. T., Chen, F., & Chen, C. L. (2013). Energy-saving potential of the industrial sector of Taiwan. Renewable and Sustainable Energy Reviews, 21, 674\u2013683.","journal-title":"Renewable and Sustainable Energy Reviews"},{"issue":"2","key":"3494_CR23","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1016\/j.ijpe.2013.01.028","volume":"146","author":"H Luo","year":"2013","unstructured":"Luo, H., Du, B., Huang, G. Q., Chen, H., & Li, X. (2013). Hybrid flow shop scheduling considering machine electricity consumption cost. International Journal of Production Economics, 146(2), 423\u2013439.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"3494_CR24","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1007\/s10479-013-1406-4","volume":"227","author":"I Makarouni","year":"2015","unstructured":"Makarouni, I., Psarras, J., & Siskos, E. (2015). Interactive bicriterion decision support for a large scale industrial scheduling system. Annals of Operations Research, 227(1), 45\u201361.","journal-title":"Annals of Operations Research"},{"issue":"9\u201310","key":"3494_CR25","doi-asserted-by":"crossref","first-page":"990","DOI":"10.1007\/s00170-005-2585-1","volume":"29","author":"M Mathirajan","year":"2006","unstructured":"Mathirajan, M., & Sivakumar, A. (2006). A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. The International Journal of Advanced Manufacturing Technology, 29(9\u201310), 990\u20131001.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"6","key":"3494_CR26","doi-asserted-by":"crossref","first-page":"913","DOI":"10.1016\/j.compchemeng.2006.02.008","volume":"30","author":"CA M\u00e9ndez","year":"2006","unstructured":"M\u00e9ndez, C. A., Cerd\u00e1, J., Grossmann, I. E., Harjunkoski, I., & Fahl, M. (2006). State-of-the-art review of optimization methods for short-term scheduling of batch processes. Computers & Chemical Engineering, 30(6), 913\u2013946.","journal-title":"Computers & Chemical Engineering"},{"key":"3494_CR27","unstructured":"Miettinen, K. (1998). A posteriori methods. In Nonlinear Multiobjective Optimization. (pp. 77\u2013113). Boston: Springer."},{"key":"3494_CR28","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1016\/j.compchemeng.2011.09.019","volume":"38","author":"S Mitra","year":"2012","unstructured":"Mitra, S., Grossmann, I. E., Pinto, J. M., & Arora, N. (2012). Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes. Computers & Chemical Engineering, 38, 171\u2013184.","journal-title":"Computers & Chemical Engineering"},{"key":"3494_CR29","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/j.compchemeng.2014.01.016","volume":"65","author":"S Mitra","year":"2014","unstructured":"Mitra, S., Pinto, J. M., & Grossmann, I. E. (2014). Optimal multi-scale capacity planning for power-intensive continuous processes under time-sensitive electricity prices and demand uncertainty. Part I: Modeling. Computers & Chemical Engineering, 65, 89\u2013101.","journal-title":"Computers & Chemical Engineering"},{"issue":"1\u20134","key":"3494_CR30","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1007\/s00170-013-4749-8","volume":"68","author":"JY Moon","year":"2013","unstructured":"Moon, J. Y., Shin, K., & Park, J. (2013). Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency. The International Journal of Advanced Manufacturing Technology, 68(1\u20134), 523\u2013535.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"3494_CR31","doi-asserted-by":"crossref","unstructured":"Okabe, T., Jin, Y., & Sendhoff, B. (2003). A critical survey of performance indices for multi-objective optimisation. In The 2003 congress on evolutionary computation, CEC\u201903 (vol. 2, pp. 878\u2013885). IEEE.","DOI":"10.1109\/CEC.2003.1299759"},{"issue":"1\u20132","key":"3494_CR32","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1007\/s10479-017-2642-9","volume":"273","author":"PHV Penna","year":"2019","unstructured":"Penna, P. H. V., Subramanian, A., Ochi, L. S., Vidal, T., & Prins, C. (2019). A hybrid heuristic for a broad class of vehicle routing problems with heterogeneous fleet. Annals of Operations Research, 273(1\u20132), 5\u201374.","journal-title":"Annals of Operations Research"},{"issue":"5","key":"3494_CR33","doi-asserted-by":"crossref","first-page":"758","DOI":"10.1287\/opre.45.5.758","volume":"45","author":"D Pisinger","year":"1997","unstructured":"Pisinger, D. (1997). A minimal algorithm for the 0\u20131 knapsack problem. Operations Research, 45(5), 758\u2013767.","journal-title":"Operations Research"},{"issue":"3","key":"3494_CR34","doi-asserted-by":"crossref","first-page":"528","DOI":"10.1016\/S0377-2217(98)00120-9","volume":"114","author":"D Pisinger","year":"1999","unstructured":"Pisinger, D. (1999). An exact algorithm for large multiple knapsack problems. European Journal of Operational Research, 114(3), 528\u2013541.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"3494_CR35","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"CN Potts","year":"2000","unstructured":"Potts, C. N., & Kovalyov, M. Y. (2000). Scheduling with batching: A review. European Journal of Operational Research, 120(2), 228\u2013249.","journal-title":"European Journal of Operational Research"},{"key":"3494_CR36","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1016\/j.jclepro.2013.12.024","volume":"67","author":"F Shrouf","year":"2014","unstructured":"Shrouf, F., Ordieres-Mer\u00e9, J., Garc\u00eda-S\u00e1nchez, A., & Ortega-Mier, M. (2014). Optimizing the production scheduling of a single machine to minimize total energy consumption costs. Journal of Cleaner Production, 67, 197\u2013207.","journal-title":"Journal of Cleaner Production"},{"issue":"1","key":"3494_CR37","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1007\/s12351-016-0256-7","volume":"18","author":"M Tan","year":"2018","unstructured":"Tan, M., Duan, B., & Su, Y. (2018). Economic batch sizing and scheduling on parallel machines under time-of-use electricity pricing. Operational Research, 18(1), 105\u2013122.","journal-title":"Operational Research"},{"issue":"2","key":"3494_CR38","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1016\/j.ijpe.2004.04.011","volume":"105","author":"L Tang","year":"2007","unstructured":"Tang, L., & Huang, L. (2007). Optimal and near-optimal algorithms to rolling batch scheduling for seamless steel tube production. International Journal of Production Economics, 105(2), 357\u2013371.","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"3494_CR39","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1080\/07408179208964233","volume":"24","author":"R Uzsoy","year":"1992","unstructured":"Uzsoy, R., Lee, C. Y., & Martin-Vega, L. A. (1992). A review of production planning and scheduling models in the semiconductor industry Part I: System characteristics, performance evaluation and production planning. IIE Transactions, 24(4), 47\u201360.","journal-title":"IIE Transactions"},{"issue":"5","key":"3494_CR40","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1080\/07408179408966627","volume":"26","author":"R Uzsoy","year":"1994","unstructured":"Uzsoy, R., Lee, C. Y., & Martin-Vega, L. A. (1994). A review of production planning and scheduling models in the semiconductor industry Part II: Shop-floor control. IIE Transactions, 26(5), 44\u201355.","journal-title":"IIE Transactions"},{"issue":"11","key":"3494_CR41","doi-asserted-by":"crossref","first-page":"3063","DOI":"10.1080\/002075497194291","volume":"35","author":"D Van De Rzee","year":"1997","unstructured":"Van De Rzee, D., Van Harten, A., & Schuur, P. (1997). Dynamic job assignment heuristics for multi-server batch operations-a cost based approach. International Journal of Production Research, 35(11), 3063\u20133094.","journal-title":"International Journal of Production Research"},{"key":"3494_CR42","doi-asserted-by":"crossref","first-page":"1205","DOI":"10.1016\/j.jclepro.2016.07.206","volume":"137","author":"S Wang","year":"2016","unstructured":"Wang, S., Liu, M., Chu, F., & Chu, C. (2016). Bi-objective optimization of a single machine batch scheduling problem with energy cost consideration. Journal of Cleaner Production, 137, 1205\u20131215.","journal-title":"Journal of Cleaner Production"},{"key":"3494_CR43","doi-asserted-by":"crossref","first-page":"424","DOI":"10.1016\/j.jclepro.2018.05.056","volume":"193","author":"S Wang","year":"2018","unstructured":"Wang, S., Wang, X., Yu, J., Ma, S., & Liu, M. (2018). Bi-objective identical parallel machine scheduling to minimize total energy consumption and makespan. Journal of Cleaner Production, 193, 424\u2013440.","journal-title":"Journal of Cleaner Production"},{"issue":"9","key":"3494_CR44","doi-asserted-by":"crossref","first-page":"3173","DOI":"10.1080\/00207543.2017.1401236","volume":"56","author":"S Wang","year":"2018","unstructured":"Wang, S., Zhu, Z., Fang, K., Chu, F., & Chu, C. (2018). Scheduling on a two-machine permutation flow shop under time-of-use electricity tariffs. International Journal of Production Research, 56(9), 3173\u20133187.","journal-title":"International Journal of Production Research"},{"key":"3494_CR45","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/j.energy.2013.10.011","volume":"63","author":"Y Wang","year":"2013","unstructured":"Wang, Y., & Li, L. (2013). Time-of-use based electricity demand response for sustainable manufacturing systems. Energy, 63, 233\u2013244.","journal-title":"Energy"},{"issue":"8","key":"3494_CR46","doi-asserted-by":"crossref","first-page":"2028","DOI":"10.1109\/TITS.2016.2631893","volume":"18","author":"P Wu","year":"2017","unstructured":"Wu, P., Che, A., Chu, F., & Fang, Y. (2017). Exact and heuristic algorithms for rapid and station arrival-time guaranteed bus transportation via lane reservation. IEEE Transactions on Intelligent Transportation Systems, 18(8), 2028\u20132043.","journal-title":"IEEE Transactions on Intelligent Transportation Systems"},{"issue":"3","key":"3494_CR47","doi-asserted-by":"crossref","first-page":"1479","DOI":"10.1109\/TITS.2014.2368594","volume":"16","author":"P Wu","year":"2015","unstructured":"Wu, P., Che, A., Chu, F., & Zhou, M. (2015). An improved exact $$\\epsilon $$-constraint and cut-and-solve combined method for biobjective robust lane reservation. IEEE Transactions on Intelligent Transportation Systems, 16(3), 1479\u20131492.","journal-title":"IEEE Transactions on Intelligent Transportation Systems"},{"key":"3494_CR48","unstructured":"www.chyxx.com. (2017). Development status and trend analysis of China\u2019s semiconductor industry in 2017. http:\/\/www.chyxx.com\/industry\/201712\/592628.html. Accessed July 19, 2019."},{"issue":"3","key":"3494_CR49","doi-asserted-by":"crossref","first-page":"582","DOI":"10.1016\/j.cor.2011.05.011","volume":"39","author":"R Xu","year":"2012","unstructured":"Xu, R., Chen, H., & Li, X. (2012). Makespan minimization on single batch-processing machine via ant colony optimization. Computers & Operations Research, 39(3), 582\u2013593.","journal-title":"Computers & Operations Research"},{"issue":"3","key":"3494_CR50","doi-asserted-by":"crossref","first-page":"762","DOI":"10.1016\/j.cie.2009.02.003","volume":"57","author":"DL Yang","year":"2009","unstructured":"Yang, D. L., & Kuo, W. H. (2009). A single-machine scheduling problem with learning effects in intermittent batch production. Computers & Industrial Engineering, 57(3), 762\u2013765.","journal-title":"Computers & Industrial Engineering"},{"issue":"19","key":"3494_CR51","doi-asserted-by":"crossref","first-page":"5583","DOI":"10.1080\/00207543.2014.886027","volume":"52","author":"Y Yin","year":"2014","unstructured":"Yin, Y., Cheng, T. C. E., Wu, C. C., & Cheng, S. R. (2014). Single-machine batch delivery scheduling and common due-date assignment with a rate-modifying activity. International Journal of Production Research, 52(19), 5583\u20135596.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"3494_CR52","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1080\/0305215X.2017.1296437","volume":"50","author":"Y Zeng","year":"2018","unstructured":"Zeng, Y., Che, A., & Wu, X. (2018). Bi-objective scheduling on uniform parallel machines considering electricity cost. Engineering Optimization, 50(1), 19\u201336.","journal-title":"Engineering Optimization"},{"issue":"1","key":"3494_CR53","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/j.cirp.2014.03.011","volume":"63","author":"H Zhang","year":"2014","unstructured":"Zhang, H., Zhao, F., Fang, K., & Sutherland, J. W. (2014). Energy-conscious flow shop scheduling under time-of-use electricity tariffs. CIRP Annals-Manufacturing Technology, 63(1), 37\u201340.","journal-title":"CIRP Annals-Manufacturing Technology"},{"issue":"8","key":"3494_CR54","doi-asserted-by":"crossref","first-page":"1380","DOI":"10.1080\/0305215X.2017.1400026","volume":"50","author":"S Zhang","year":"2018","unstructured":"Zhang, S., Che, A., Wu, X., & Chu, C. (2018). Improved mixed-integer linear programming model and heuristics for bi-objective single-machine batch scheduling with energy cost consideration. Engineering Optimization, 50(8), 1380\u20131394.","journal-title":"Engineering Optimization"},{"key":"3494_CR55","unstructured":"Zitzler, E. (1999). Evolutionary algorithms for multiobjective optimization: methods and applications. PhD thesis."},{"issue":"2","key":"3494_CR56","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1109\/TEVC.2003.810758","volume":"7","author":"E Zitzler","year":"2003","unstructured":"Zitzler, E., Thiele, L., Laumanns, M., Fonseca, C. M., & Da Fonseca, V. G. (2003). Performance assessment of multiobjective optimizers: An analysis and review. IEEE Transactions on Evolutionary Computation, 7(2), 117\u2013132.","journal-title":"IEEE Transactions on Evolutionary Computation"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-019-03494-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-019-03494-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-019-03494-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,1,5]],"date-time":"2021-01-05T17:43:45Z","timestamp":1609868625000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-019-03494-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,12,16]]},"references-count":56,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2021,1]]}},"alternative-id":["3494"],"URL":"https:\/\/doi.org\/10.1007\/s10479-019-03494-7","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,12,16]]},"assertion":[{"value":"16 December 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}