{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,12]],"date-time":"2024-07-12T14:40:32Z","timestamp":1720795232710},"reference-count":49,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2015,6,25]],"date-time":"2015-06-25T00:00:00Z","timestamp":1435190400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Cent Eur J Oper Res"],"published-print":{"date-parts":[[2016,9]]},"DOI":"10.1007\/s10100-015-0403-x","type":"journal-article","created":{"date-parts":[[2015,6,24]],"date-time":"2015-06-24T11:35:20Z","timestamp":1435145720000},"page":"489-513","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Simultaneous production and maintenance planning for a single capacitated resource facing both a dynamic demand and intensive wear and tear"],"prefix":"10.1007","volume":"24","author":[{"given":"Anja","family":"Wolter","sequence":"first","affiliation":[]},{"given":"Stefan","family":"Helber","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,6,25]]},"reference":[{"key":"403_CR1","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1016\/j.ejor.2006.06.032","volume":"181","author":"E-H Aghezzaf","year":"2007","unstructured":"Aghezzaf E-H, Jamali MA, Ait-Kadi D (2007) An integrated production and preventive maintenance planning model. Eur J Oper Res 181:679\u2013685","journal-title":"Eur J Oper Res"},{"key":"403_CR2","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1016\/j.ijpe.2006.08.017","volume":"112","author":"H Allaoui","year":"2008","unstructured":"Allaoui H, Lamouri S, Artiba A, Aghezzaf E-H (2008) Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan. Int J Prod Econ 112:161\u2013167","journal-title":"Int J Prod Econ"},{"key":"403_CR3","doi-asserted-by":"crossref","first-page":"3311","DOI":"10.1080\/00207549608905092","volume":"34","author":"J Ashayeri","year":"1996","unstructured":"Ashayeri J, Teelen A, Selenj W (1996) A production and maintenance planning model for the process industry. Int J Prod Res 34:3311\u20133326","journal-title":"Int J Prod Res"},{"key":"403_CR4","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1287\/opre.35.3.329","volume":"35","author":"HC Bahl","year":"1987","unstructured":"Bahl HC, Ritzman LP, Gupta JND (1987) Determining lot sizes and resource requirements\u2014a review. Oper Res 35:329\u2013345","journal-title":"Oper Res"},{"key":"403_CR5","doi-asserted-by":"crossref","first-page":"1024","DOI":"10.1109\/9.58530","volume":"35","author":"E-K Boukas","year":"1990","unstructured":"Boukas E-K, Haurie A (1990) Manufacturing flow-control and preventive maintenance\u2014a stochastic-control approach. IEEE Trans Autom Control 35:1024\u20131031","journal-title":"IEEE Trans Autom Control"},{"key":"403_CR6","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2004.01.054","volume":"168","author":"N Brahimi","year":"2006","unstructured":"Brahimi N, Dauzere-Peres S, Najid NM, Nordli A (2006) Single item lot sizing problems. Eur J Oper Res 168:1\u201316","journal-title":"Eur J Oper Res"},{"key":"403_CR7","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1007\/s00291-008-0150-7","volume":"32","author":"L Buschkuehl","year":"2010","unstructured":"Buschkuehl L, Sahling F, Helber S, Tempelmeier H (2010) Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spectr 32:231\u2013261","journal-title":"OR Spectr"},{"key":"403_CR8","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1080\/07408170304416","volume":"35","author":"CR Cassady","year":"2003","unstructured":"Cassady CR, Kutanoglu E (2003) Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Trans 35:503\u2013513","journal-title":"IIE Trans"},{"key":"403_CR9","doi-asserted-by":"crossref","first-page":"304","DOI":"10.1109\/TR.2005.845967","volume":"54","author":"CR Cassady","year":"2005","unstructured":"Cassady CR, Kutanoglu E (2005) Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans Reliab 54:304\u2013309","journal-title":"IEEE Trans Reliab"},{"key":"403_CR10","doi-asserted-by":"crossref","first-page":"712","DOI":"10.1016\/S0377-2217(03)00254-6","volume":"156","author":"A Chelbi","year":"2004","unstructured":"Chelbi A, Ait-Kadi D (2004) Analysis of a production\/inventory system with randomly failing production unit submitted to regular preventive maintenance. Eur J Oper Res 156:712\u2013718","journal-title":"Eur J Oper Res"},{"key":"403_CR11","doi-asserted-by":"crossref","first-page":"703","DOI":"10.1057\/palgrave.jors.2602043","volume":"57","author":"JS Chen","year":"2006","unstructured":"Chen JS (2006) Single-machine scheduling with flexible and periodic maintenance. J Oper Res Soc 57:703\u2013710","journal-title":"J Oper Res Soc"},{"key":"403_CR12","doi-asserted-by":"crossref","first-page":"192","DOI":"10.1021\/ie00040a019","volume":"34","author":"IT Dedopoulos","year":"1995","unstructured":"Dedopoulos IT, Shah N (1995) Optimal short-term scheduling of maintenance and production for multipurpose plants. Ind Eng Chem Res 34:192\u2013201","journal-title":"Ind Eng Chem Res"},{"key":"403_CR13","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/0925-5273(95)00040-U","volume":"40","author":"A Drexl","year":"1995","unstructured":"Drexl A, Haase K (1995) Proportional lotsizing and scheduling. Int J Prod Econ 40:73\u201387","journal-title":"Int J Prod Econ"},{"key":"403_CR14","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/S0377-2217(97)00030-1","volume":"99","author":"A Drexl","year":"1997","unstructured":"Drexl A, Kimms A (1997) Lot sizing and scheduling\u2014survey and extensions. Eur J Oper Res 99:221\u2013235","journal-title":"Eur J Oper Res"},{"key":"403_CR15","doi-asserted-by":"crossref","first-page":"344","DOI":"10.1016\/j.ijpe.2011.12.021","volume":"136","author":"M-C Fitouhi","year":"2012","unstructured":"Fitouhi M-C, Nourelfath M (2012) Integrating noncyclical preventive maintenance scheduling and production planning for a single machine. Int J Prod Econ 136:344\u2013351","journal-title":"Int J Prod Econ"},{"key":"403_CR16","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1007\/BF01539800","volume":"19","author":"B Fleischmann","year":"1997","unstructured":"Fleischmann B, Meyr H (1997) The general lotsizing and scheduling problem. OR Spectr 19:11\u201321","journal-title":"OR Spectr"},{"key":"403_CR17","doi-asserted-by":"crossref","first-page":"422","DOI":"10.1016\/j.ijpe.2006.09.018","volume":"107","author":"A Gharbi","year":"2007","unstructured":"Gharbi A, Kenn\u00e9 J, Beit M (2007) Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems. Int J Prod Econ 107:422\u2013434","journal-title":"Int J Prod Econ"},{"key":"403_CR18","doi-asserted-by":"crossref","unstructured":"Goel, Grievink, Weijnen (2003) Integrated optimal reliable design, production, and maintenance planning for multipurpose process plants. Comput Chem Eng 1543\u20131555","DOI":"10.1016\/S0098-1354(03)00090-5"},{"key":"403_CR19","doi-asserted-by":"crossref","first-page":"1067","DOI":"10.1016\/j.mcm.2006.09.018","volume":"45","author":"Y Guo","year":"2007","unstructured":"Guo Y, Lim A, Rodrigues B, Yu S (2007) Machine scheduling performance with maintenance and failure. Math Comput Model 45:1067\u20131080","journal-title":"Math Comput Model"},{"key":"403_CR20","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1016\/j.ijpe.2009.08.022","volume":"123","author":"S Helber","year":"2010","unstructured":"Helber S, Sahling F (2010) A fix-and-optimize approach for the multi-level capacitated lot sizing problem. Int J Prod Econ 123:247\u2013256","journal-title":"Int J Prod Econ"},{"key":"403_CR21","first-page":"423","volume":"34","author":"SMR Iravani","year":"2002","unstructured":"Iravani SMR, Duenyas I (2002) Integrated maintenance and production control of a deteriorating production system. IIE Trans 34:423\u2013435","journal-title":"IIE Trans"},{"key":"403_CR22","doi-asserted-by":"crossref","first-page":"1259","DOI":"10.1007\/s11573-009-0318-x","volume":"79","author":"J Jacobs","year":"2009","unstructured":"Jacobs J, Junker A, Letmathe P (2009) Zustandsorientierte Maschinenzuordnungs- und Instandhaltungsplanung. Zeitschrift f\u00fcr Betriebswirtschaft 79:1259\u20131282","journal-title":"Zeitschrift f\u00fcr Betriebswirtschaft"},{"key":"403_CR23","doi-asserted-by":"crossref","first-page":"1855","DOI":"10.1016\/j.ejor.2005.12.008","volume":"177","author":"R Jans","year":"2007","unstructured":"Jans R, Degraeve Z (2007) Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches. Eur J Oper Res 177:1855\u20131875","journal-title":"Eur J Oper Res"},{"key":"403_CR24","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/S0305-0483(03)00059-8","volume":"31","author":"B Karimi","year":"2003","unstructured":"Karimi B, Ghomi S, Wilson JM (2003) The capacitated lot sizing problem: a review of models and algorithms. Omega 31:365\u2013378","journal-title":"Omega"},{"key":"403_CR25","doi-asserted-by":"crossref","unstructured":"Kenn\u00e9 J, Nkeungoue L (2008) Simultaneous control of production, preventive and corrective maintenance rates of a failure-prone manufacturing system. Appl Numer Math 180\u2013194","DOI":"10.1016\/j.apnum.2006.11.010"},{"key":"403_CR26","doi-asserted-by":"crossref","first-page":"789","DOI":"10.1287\/opre.1060.0301","volume":"54","author":"MA Kubzin","year":"2006","unstructured":"Kubzin MA, Strusevich VA (2006) Planning machine maintenance in two-machine shop scheduling. Oper Res 54:789\u2013800","journal-title":"Oper Res"},{"key":"403_CR27","doi-asserted-by":"crossref","first-page":"243","DOI":"10.1016\/0377-2217(94)90072-8","volume":"75","author":"R Kuik","year":"1994","unstructured":"Kuik R, Salomon M, van Wassenhove LN (1994) Batching decisions: structure and models. Eur J Oper Res 75:243\u2013263","journal-title":"Eur J Oper Res"},{"key":"403_CR28","doi-asserted-by":"crossref","first-page":"493","DOI":"10.1016\/S0377-2217(00)00322-2","volume":"135","author":"C-L Lee","year":"2001","unstructured":"Lee C-L, Lin C-S (2001) Single-machine scheduling with maintenance and repair rate-modifying activities. Eur J Oper Res 135:493\u2013513","journal-title":"Eur J Oper Res"},{"key":"403_CR29","doi-asserted-by":"crossref","first-page":"889","DOI":"10.1109\/9.286278","volume":"39","author":"G Liberopoulos","year":"1994","unstructured":"Liberopoulos G, Caramanis M (1994) Production control of manufacturing systems with production rate-dependent failure rates. IEEE Trans Autom Control 39:889\u2013895","journal-title":"IEEE Trans Autom Control"},{"key":"403_CR30","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1016\/j.ress.2015.01.002","volume":"167","author":"X Liu","year":"2015","unstructured":"Liu X, Wang W, Peng R (2015) An integrated production, inventory and preventive maintenance model for a multi-product production system. Reliab Eng Syst Saf 167:76\u201386","journal-title":"Reliab Eng Syst Saf"},{"key":"403_CR31","doi-asserted-by":"crossref","first-page":"1379","DOI":"10.1080\/00207543.2012.693637","volume":"51","author":"Z Lu","year":"2013","unstructured":"Lu Z, Zhang Y, Han X (2013) Integrating run-based preventive maintenance into the capacitated lot sizing problem with reliability constraint. Int J Prod Res 51:1379\u20131391","journal-title":"Int J Prod Res"},{"key":"403_CR32","doi-asserted-by":"crossref","first-page":"991","DOI":"10.1057\/jors.1988.169","volume":"39","author":"J Maes","year":"1988","unstructured":"Maes J, van Wassenhove LN (1988) Multi-item single-level capacitated dynamic lot-sizing heuristics\u2014a general review. J Oper Res Soc 39:991\u20131004","journal-title":"J Oper Res Soc"},{"key":"403_CR33","doi-asserted-by":"crossref","first-page":"3195","DOI":"10.1021\/ie000431q","volume":"40","author":"EN Pistikopoulos","year":"2001","unstructured":"Pistikopoulos EN, Vassiliadis CG, Arvela J, Papageorgiou LG (2001) Interactions of maintenance and production planning for multipurpose process plants\u2014a system effectiveness approach. Ind Eng Chem Res 40:3195\u20133207","journal-title":"Ind Eng Chem Res"},{"key":"403_CR34","volume-title":"Production planning by mixed integer programming","author":"Y Pochet","year":"2006","unstructured":"Pochet Y, Wolsey LA (2006) Production planning by mixed integer programming. Springer, New York"},{"key":"403_CR35","doi-asserted-by":"crossref","first-page":"1071","DOI":"10.1057\/palgrave.jors.2600791","volume":"50","author":"X Qi","year":"1999","unstructured":"Qi X, Chen T, Tu F (1999) Scheduling the maintenance on a single machine. J Oper Res Soc 50:1071\u20131078","journal-title":"J Oper Res Soc"},{"key":"403_CR36","doi-asserted-by":"crossref","first-page":"392","DOI":"10.1016\/j.jmsy.2013.01.002","volume":"32","author":"R Ramezanian","year":"2013","unstructured":"Ramezanian R, Saidi-Mehrabad M, Fattahi P (2013) MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints. J Manuf Syst 32:392\u2013401","journal-title":"J Manuf Syst"},{"key":"403_CR37","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-8349-8708-2","volume-title":"Mehrstufige Losgr\u00f6\u00dfenplanung bei Kapazit\u00e4tsrestriktionen","author":"F Sahling","year":"2010","unstructured":"Sahling F (2010) Mehrstufige Losgr\u00f6\u00dfenplanung bei Kapazit\u00e4tsrestriktionen. Gabler, Wiesbaden"},{"key":"403_CR38","doi-asserted-by":"crossref","first-page":"801","DOI":"10.1287\/mnsc.37.7.801","volume":"37","author":"M Salomon","year":"1991","unstructured":"Salomon M, Kroon LG, Kuik R, van Wassenhove LN (1991) Some extensions of the discrete lotsizing and scheduling problem. Manag Sci 37:801\u2013812","journal-title":"Manag Sci"},{"key":"403_CR39","doi-asserted-by":"crossref","first-page":"1157","DOI":"10.1016\/S0098-1354(96)00327-4","volume":"21","author":"E Sanmarti","year":"1997","unstructured":"Sanmarti E, Espuna A, Puigjaner L (1997) Batch production and preventive maintenance scheduling under equipment failure uncertainty. Comput Chem Eng 21:1157\u20131168","journal-title":"Comput Chem Eng"},{"key":"403_CR40","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1016\/j.compind.2004.06.005","volume":"56","author":"N Sortrakul","year":"2005","unstructured":"Sortrakul N, Nachtmann H, Cassady CR (2005) Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine. Comput Ind 56:161\u2013168","journal-title":"Comput Ind"},{"key":"403_CR41","unstructured":"Staggemeier AT, Clark AR (2001) A survey of lot-sizing and scheduling models. 23rd annual symposium of the Brazilian operational research society (SOBRAPO) 938\u2013947"},{"key":"403_CR42","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1016\/j.ijpe.2012.01.006","volume":"137","author":"SMA Suliman","year":"2012","unstructured":"Suliman SMA, Jawad SH (2012) Optimization of preventive maintenance schedule and production lot size. Int J Prod Econ 137:19\u201328","journal-title":"Int J Prod Econ"},{"key":"403_CR43","doi-asserted-by":"crossref","first-page":"355","DOI":"10.1080\/00207540310001602955","volume":"42","author":"H Suryadi","year":"2004","unstructured":"Suryadi H, Papageorgiou LG (2004) Optimal maintenance planning and crew allocation for multipurpose batch plants. Int J Prod Res 42:355\u2013377","journal-title":"Int J Prod Res"},{"key":"403_CR44","doi-asserted-by":"crossref","unstructured":"Vassiliadis CG, Vassiliadou MG, Papageorgiou LG, Pistikopoulos EN (2000) Simultaneous maintenance considerations and production planning in multi-purpose plants. In: 2000 Proceedings\u2014annual reliability and maintainability symposium. IEEE, Piscataway","DOI":"10.1109\/RAMS.2000.816312"},{"key":"403_CR45","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1016\/0377-2217(94)00341-9","volume":"86","author":"LA Wolsey","year":"1995","unstructured":"Wolsey LA (1995) Progress with single-item lot-sizing. Eur J Oper Res 86:395\u2013401","journal-title":"Eur J Oper Res"},{"key":"403_CR46","doi-asserted-by":"crossref","first-page":"841","DOI":"10.1016\/j.ins.2014.03.097","volume":"278","author":"A Yalaoui","year":"2014","unstructured":"Yalaoui A, Chaabi K, Yalaoui F (2014) Integrated production planning and preventive maintenance in deteriorating production systems. Inf Sci 278:841\u2013861","journal-title":"Inf Sci"},{"key":"403_CR47","doi-asserted-by":"crossref","first-page":"668","DOI":"10.1002\/nav.20107","volume":"52","author":"X Yao","year":"2005","unstructured":"Yao X, Xie X, Fu MC, Marcus SI (2005) Optimal joint preventive maintenance and production policies. Naval Res Logist 52:668\u2013681","journal-title":"Naval Res Logist"},{"key":"403_CR48","doi-asserted-by":"crossref","first-page":"1212","DOI":"10.1016\/j.ejor.2007.02.051","volume":"186","author":"J Yuan","year":"2008","unstructured":"Yuan J, Qi X, Lu L, Li W (2008) Single machine unbounded parallel-batch scheduling with forbidden intervals. Eur J Oper Res 186:1212\u20131217","journal-title":"Eur J Oper Res"},{"key":"403_CR49","doi-asserted-by":"crossref","first-page":"2436","DOI":"10.1080\/00207543.2013.871591","volume":"52","author":"Y Zhang","year":"2014","unstructured":"Zhang Y, Lu Z, Xia T (2014) A dynamic method for the production lot sizing with machine failures. Int J Prod Res 52:2436\u20132447","journal-title":"Int J Prod Res"}],"container-title":["Central European Journal of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10100-015-0403-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10100-015-0403-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10100-015-0403-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T09:49:33Z","timestamp":1559123373000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10100-015-0403-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,6,25]]},"references-count":49,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2016,9]]}},"alternative-id":["403"],"URL":"https:\/\/doi.org\/10.1007\/s10100-015-0403-x","relation":{},"ISSN":["1435-246X","1613-9178"],"issn-type":[{"value":"1435-246X","type":"print"},{"value":"1613-9178","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,6,25]]}}}