{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,27]],"date-time":"2024-07-27T14:37:31Z","timestamp":1722091051534},"reference-count":27,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2012,9,19]],"date-time":"2012-09-19T00:00:00Z","timestamp":1348012800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2013,7]]},"DOI":"10.1007\/s00291-012-0306-3","type":"journal-article","created":{"date-parts":[[2012,9,18]],"date-time":"2012-09-18T11:23:05Z","timestamp":1347967385000},"page":"659-689","source":"Crossref","is-referenced-by-count":23,"title":["Measures of problem uncertainty for scheduling with interval processing times"],"prefix":"10.1007","volume":"35","author":[{"given":"Yuri N.","family":"Sotskov","sequence":"first","affiliation":[]},{"given":"Tsung-Chyan","family":"Lai","sequence":"additional","affiliation":[]},{"given":"Frank","family":"Werner","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2012,9,19]]},"reference":[{"key":"306_CR1","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1016\/j.ejor.2003.08.027","volume":"161","author":"H Aytug","year":"2005","unstructured":"Aytug H, Lawley M, McKay K, Mohan S, Uzsoy R (2005) Executing production schedules in the face of uncertainties: a review and some future directions. Eur J Oper Res 161:86\u2013110","journal-title":"Eur J Oper Res"},{"issue":"2","key":"306_CR2","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1287\/mnsc.41.2.363","volume":"41","author":"R Daniels","year":"1995","unstructured":"Daniels R, Kouvelis P (1995) Robust scheduling to hedge against processing time uncertainty in single stage production. Manag Sci 41(2):363\u2013376","journal-title":"Manag Sci"},{"key":"306_CR3","unstructured":"Davenport A, Beck J (2000) A survey for techniques for scheduling with uncertainty. Unpublished. http:\/\/www.eil.toronto.ca\/profiles\/chris\/chris.papers.html"},{"key":"306_CR4","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1007\/s00291-004-0171-9","volume":"27","author":"M Ebben","year":"2005","unstructured":"Ebben M, Hans E, Olde Weghuis F (2005) Workload based order acceptance in job shop environments. Oper Res Spektrum 27:107\u2013122","journal-title":"Oper Res Spektrum"},{"key":"306_CR5","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1007\/s10700-004-5571-4","volume":"4","author":"T Itoh","year":"2005","unstructured":"Itoh T, Ishii H (2005) One machine scheduling problem with fuzzy random due-dates. Fuzzy Optim Decis Mak 4:71\u201378","journal-title":"Fuzzy Optim Decis Mak"},{"key":"306_CR6","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1007\/s00291-002-0108-0","volume":"24","author":"C Ivanescu","year":"2002","unstructured":"Ivanescu C, Fransoo J, Bertrand J (2002) Makespan estimation and order acceptance in batch process industries when processing times are uncertain. Oper Res Spektrum 24:467\u2013495","journal-title":"Oper Res Spektrum"},{"issue":"1","key":"306_CR7","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S Johnson","year":"1954","unstructured":"Johnson S (1954) Optimal two and three stage production schedules with set up times included. Nav Res Logist Q 1(1):61\u201368","journal-title":"Nav Res Logist Q"},{"key":"306_CR8","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/j.orl.2004.07.004","volume":"33","author":"A Kasperski","year":"2005","unstructured":"Kasperski A (2005) Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion. Oper Res Lett 33:431\u2013436","journal-title":"Oper Res Lett"},{"key":"306_CR9","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1016\/j.orl.2007.11.004","volume":"36","author":"A Kasperski","year":"2008","unstructured":"Kasperski A, Zelinski P (2008) A 2-approximation algorithm for interval data minmax regret sequencing problem with total flow time criterion. Oper Res Lett 36:343\u2013344","journal-title":"Oper Res Lett"},{"key":"306_CR10","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4757-2620-6","volume-title":"Robust discrete optimization and its application","author":"P Kouvelis","year":"1997","unstructured":"Kouvelis P, Yu G (1997) Robust discrete optimization and its application. Kluwer Academic Publishers, Boston"},{"key":"306_CR11","doi-asserted-by":"crossref","unstructured":"Lai TC, Sotskov Y (1999) Sequencing with uncertain numerical data for makespan minimization. J Oper Res Soc 50:230\u2013243","DOI":"10.1057\/palgrave.jors.2600690"},{"issue":"12","key":"306_CR12","doi-asserted-by":"crossref","first-page":"1493","DOI":"10.1080\/02331931003657691","volume":"60","author":"N Matsveichuk","year":"2011","unstructured":"Matsveichuk N, Sotskov Y, Werner F (2011) The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times. Optimization 60(12):1493\u20131517","journal-title":"Optimization"},{"issue":"6","key":"306_CR13","doi-asserted-by":"crossref","first-page":"715","DOI":"10.1142\/S0217595909002432","volume":"26","author":"C Ng","year":"2009","unstructured":"Ng C, Matsveichuk N, Sotskov Y, Cheng T (2009) Two-machine flow-shop minimum-length scheduling with interval processing times. Asia-Pac J Oper Res 26(6):715\u2013734","journal-title":"Asia-Pac J Oper Res"},{"key":"306_CR14","volume-title":"Scheduling: theory, algorithms, and systems","author":"M Pinedo","year":"2002","unstructured":"Pinedo M (2002) Scheduling: theory, algorithms, and systems. Prentice-Hall, Englewood Cliffs"},{"issue":"2","key":"306_CR15","doi-asserted-by":"crossref","first-page":"138","DOI":"10.1080\/09511920802209033","volume":"22","author":"I Sabuncuoglu","year":"2009","unstructured":"Sabuncuoglu I, Goren S (2009) Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research. Int J Comput Integr Manuf 22(2):138\u2013157","journal-title":"Int J Comput Integr Manuf"},{"key":"306_CR16","volume-title":"Scheduling under fuzziness","author":"R Slowinski","year":"1999","unstructured":"Slowinski R, Hapke M (1999) Scheduling under fuzziness. Physica-Verlag, Heidelberg"},{"issue":"1","key":"306_CR17","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1002\/nav.3800030106","volume":"3","author":"W Smith","year":"1956","unstructured":"Smith W (1956) Various optimizers for single-stage production. Nav Res Logist Q 3(1):59\u201366","journal-title":"Nav Res Logist Q"},{"key":"306_CR18","doi-asserted-by":"crossref","first-page":"556","DOI":"10.1016\/j.mcm.2009.03.006","volume":"50","author":"Y Sotskov","year":"2009","unstructured":"Sotskov Y, Egorova N, Lai TC (2009) Minimizing total weighted flow time of a set of jobs with interval processing times. Math Comput Model 50:556\u2013573","journal-title":"Math Comput Model"},{"key":"306_CR19","doi-asserted-by":"crossref","first-page":"1271","DOI":"10.1016\/j.cor.2011.02.001","volume":"39","author":"Y Sotskov","year":"2012","unstructured":"Sotskov Y, Lai TC (2012) Minimizing total weighted flow time under uncertainty using dominance and a stability box. Comput Oper Res 39:1271\u20131289","journal-title":"Comput Oper Res"},{"key":"306_CR20","volume-title":"Scheduling under uncertainty. Theory and algorithms","author":"Y Sotskov","year":"2010","unstructured":"Sotskov Y, Sotskova N, Lai TC, Werner F (2010) Scheduling under uncertainty. Theory and algorithms. Belorusskaya Nauka, Minsk"},{"key":"306_CR21","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1016\/0377-2217(95)00117-4","volume":"93","author":"P Stanfield","year":"1996","unstructured":"Stanfield P, King R, Joines J (1996) Scheduling arrivals to a production system in a fuzzy environment. Eur J Oper Res 93:75\u201387","journal-title":"Eur J Oper Res"},{"key":"306_CR22","unstructured":"Tada M, Ishii H, Nishida T (1990) Weighted fuzzy due date scheduling problem. In: Proceedings of Asian-Pacific operations research society, APORS\u201988, pp 415\u2013417"},{"key":"306_CR23","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1007\/s00291-009-0164-9","volume":"33","author":"B Tam","year":"2011","unstructured":"Tam B, Ehrgott M, Ryan D, Zakeri G (2011) A comparison of stochastic programming and bi-objective optimisation approaches to robust airline crew scheduling. Oper Res Spektrum 33:49\u201375","journal-title":"Oper Res Spektrum"},{"key":"306_CR24","doi-asserted-by":"crossref","DOI":"10.1007\/978-94-011-1190-4","volume-title":"Scheduling theory. Single-stage systems","author":"V Tanaev","year":"1994","unstructured":"Tanaev V, Gordon V, Shafransky Y (1994) Scheduling theory. Single-stage systems. Kluwer Academic Publishers, Dordrecht"},{"key":"306_CR25","doi-asserted-by":"crossref","DOI":"10.1007\/978-94-011-1192-8","volume-title":"Scheduling theory: multi-stage systems","author":"V Tanaev","year":"1994","unstructured":"Tanaev V, Sotskov Y, Strusevich V (1994) Scheduling theory: multi-stage systems. Kluwer Academic Publishers, Dordrecht"},{"key":"306_CR26","first-page":"157","volume-title":"Deterministic and stochastic scheduling","author":"G Weiss","year":"1976","unstructured":"Weiss G (1976) Multiserver stochastic scheduling. In: Dempster M, Lenstra J, Rinnooy Kan A (eds) Deterministic and stochastic scheduling. D. Reidel, Dordrecht, pp 157\u2013179"},{"key":"306_CR27","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1023\/A:1013333232691","volume":"6","author":"J Yang","year":"2002","unstructured":"Yang J, Yu G (2002) On the robust single machine scheduling problem. J Combin Optim 6:17\u201333","journal-title":"J Combin Optim"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-012-0306-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-012-0306-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-012-0306-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,28]],"date-time":"2019-05-28T11:00:03Z","timestamp":1559041203000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-012-0306-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,9,19]]},"references-count":27,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2013,7]]}},"alternative-id":["306"],"URL":"https:\/\/doi.org\/10.1007\/s00291-012-0306-3","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,9,19]]}}}